Video & Transcript : 'overweight load' :

Page 15 of 217
TX
Transcript Highlights:
  • ERCOT needs to have more accurate visibility into load growth and adding costs for load studies. is an
  • All loads should participate in firm load shedding to the extent that they're not critical.
  • Large load customers above specified load capacity thresholds, regardless of how those customers' loads
  • How do we make this load?
  • All load is ultimately interruptible, even the critical loads.
Bills: SB 6 , SB6 , SB504 , SB765 , SB815 , SB929
TX
Transcript Highlights:
  • industrial load, Toyota load, right?
  • They are a load that then dispatches. They don't load off of.
  • load, and then just the kind of rehashing the E3 PCM load service.
  • Right now that existing load is 91... Right now that existing load is 91...
  • That load, those load projections, were from 2024.
Summary: The Senate Business and Commerce Committee held its third interim hearing on Texas electric grid reliability and 765 kV transmission lines/private property rights. Chair Schwertner opened by noting record ERCOT summer demand of 91,089 MW and emphasized the committee’s focus on managing rapid load growth, ensuring adequate generation, and protecting homeowners, businesses, landowners, and ratepayers. The committee also adopted strict two-minute limits for public testimony and planned to hear invited witnesses first, then public testimony. PUC Chairman Thomas Gleeson, ERCOT CEO Pablo Vegas, and OPUC Chief Counsel Benjamin Barclay testified on Senate Bill 6 implementation, large-load interconnection, transmission cost allocation, and market design. Gleeson said the PUC has adopted or is finalizing rules on net metering/co-location, large load interconnection standards, and a transmission cost recovery rule that would move from 4CP to 12CP, lengthen the interval to 30 minutes, and add a minimum demand charge to better allocate costs to large loads. Vegas explained ERCOT’s new batch process for large loads, saying it provides year-by-year capacity allocations, clearer financial obligations, and a transmission plan; he reported 205 GW eligible for Batch Zero, with 65 GW classified as baseload, 25 GW in an intermediate category, and 114 GW as allocated load. Barclay supported the changes as better protection for residential and small commercial customers, while warning that the minimum demand charge may need an exit-fee concept to address stranded costs if large loads leave. Members pressed witnesses on whether additional market changes are needed to attract dispatchable thermal generation and whether DRS/DRRS Plus could become a capacity-market substitute. Gleeson and Vegas said the current market still favors solar, batteries, and other low-variable-cost resources, and that more incentives may be needed for gas and other thermal generation; Gleeson said the commission’s reliability standard assessment will begin this year and conclude next year with a 2029 outlook. They described DRS as an ancillary service for intraday reliability and DRS Plus as a proposed real-time revenue mechanism for thermal resources during scarcity, not a forward capacity market. Senators also questioned whether 12CP could still be gamed, whether curtailment authority under SB 6 should be expanded from EEA 2 to earlier stages, and whether the batch process should be bifurcated so traditional industrial loads are handled differently from data centers. Witnesses said the batch process is intended to prevent speculative projects from driving transmission costs, that most large-load projects are data centers, and that future rules may need to better distinguish among types of large loads.
WA

Washington 2025-2026 Regular Session

House Environment & Energy Jan 22nd, 2026

Transcript Highlights:
  • There are other large potential large loads.
  • Data centers are not just another large-load customer.
  • of load growth.
  • This allows them to protect ratepayers for all future sectors of load growth.
  • If the utility is serving that load, we should be required to just meet CETA.
Summary: The committee heard House Bill 2343, which would require the Department of Fish and Wildlife to obtain CAFO or individual discharge permit coverage for its game farms, and to treat game farms with at least 5,000 birds as large CAFOs. The prime sponsor and local officials from Centralia said the WDFW pheasant farm has contributed to nitrate contamination in a critical aquifer, affecting drinking water and public health, and argued the state should be held to the same standards as private operators. WDFW testified that it has already voluntarily secured the permit the bill would require and is working with Ecology and local partners. Testimony from county health and residents largely supported the bill, citing elevated nitrate levels and health risks, especially for infants and pregnant people. The committee then heard House Bill 2301, which expands Washington’s paint stewardship program to cover additional paint-related products, aerosol paints, and certain non-industrial coatings. The sponsor and industry supporters said the existing paint recycling program is working well and should be broadened to keep more materials out of landfills and reduce local hazardous waste costs. Local government witnesses supported the expansion but asked for changes on convenience standards, packaging coverage, and reimbursement for local collection costs. Ecology supported the overall concept but raised implementation concerns, including the need for uniform standards, full reporting, and more time for rulemaking. A wood preservatives industry representative opposed including wood preservatives, saying they are not paint and have different handling requirements. The committee also took testimony on House Bill 2515, a proposed substitute addressing emerging large energy use facilities, defined mainly as large data centers and virtual currency mining facilities. The bill would require utilities to adopt tariffs or policies to protect other ratepayers, require long-term contracts, demand response or curtailment provisions, reporting on energy and water use, and new clean energy targets for these facilities, while also changing how no-cost allowances under the Climate Commitment Act are allocated and creating an annual fee for the facilities. Supporters, including environmental groups, community action agencies, some utilities, and labor and tribal representatives, said the bill would protect ratepayers, improve transparency, and keep Washington on track for climate goals. Opponents, including data center and business groups, some ports, and several labor organizations, argued the bill is too prescriptive, could raise costs or discourage investment, may affect existing contracts and other large industrial loads, and could reduce construction jobs. No votes or final actions were taken in the transcript.
WA

Washington 2025-2026 Regular Session

Senate Environment, Energy & Technology Jan 23rd, 2026 at 10:30 am

Environment, Energy & Technology

Transcript Highlights:
  • This bill should be applied to all large loads of a certain threshold.
  • These same principles guided Tacoma as we implemented our large load rate in 2024.
  • It needs more clean energy, even without large new loads.
  • It needs more clean energy, even without large new loads.
  • New large loads also pose immense risk to reliability and affordability.
WA

Washington 2025-2026 Regular Session

Senate Environment, Energy & Technology Dec 5th, 2025 at 10:30 am

Environment, Energy & Technology

Transcript Highlights:
  • These are different vintages of load forecasts.
  • The load growth continues to accelerate after 2030.
  • One is primary load.
  • The second category is auxiliary loads. This includes cooling systems.
  • The second category is auxiliary loads. This includes cooling systems.
Summary: The committee held a work session focused on PFAS, no-cost allowance allocation for emissions-intensive trade-exposed industries (EITEs), and regional resource adequacy. Department of Ecology staff outlined Washington’s Safer Products for Washington PFAS program, including completed restrictions on intentionally added PFAS in outdoor furniture, carpets, stain/water-resistant treatments, and newer rules adopted in November restricting PFAS in most apparel, cleaners, and automotive washes, with reporting required for some remaining products such as cookware and firefighting gear. Ecology also reviewed a 2024 biosolids PFAS sampling study showing PFOS and PFOA levels in Washington biosolids were comparable to other states, and the Department of Health reported that PFAS monitoring of Group A public water systems is nearly complete, with 317 sources and 188 systems expected to exceed contaminant levels under the new federal-aligned state standards. Members asked about consumer sales, compliance, private wells, health impacts, and the cost of treatment, which DOH estimated at roughly $970 million for public water system treatment alone, with a remaining funding gap after state and federal support. Ecology then presented its analysis of no-cost allowance allocation to EITEs under the Climate Commitment Act. Staff explained that EITEs receive allowances to reduce emissions leakage and protect competitiveness, with allocations based on 2015–2019 production and emissions data and phased reductions from 100% in the first compliance period to 94% in 2031–2034. Ecology said it is preparing a report due by the end of 2025 on policy options for 2035–2050, after extensive engagement with industry, labor, environmental, utility, port, and tribal stakeholders. Senators asked about leakage, comparisons with California and Quebec, whether specific industries such as Boeing or semiconductor manufacturers are included, and whether EITEs are banking or selling allowances; Ecology said the report will address benchmarking, leakage mitigation, decarbonization barriers, and economic and environmental justice impacts. E3 then presented a regional resource adequacy study for the Pacific Northwest, warning that electricity demand is rising faster than in years past, retirements are outpacing replacements, and the region could face supply shortfalls beginning in 2026, especially during extended winter cold events. The study found that wind, solar, and batteries provide limited reliability value in the Northwest’s winter-peaking, hydro-dependent system, while firm gas and emerging technologies such as geothermal, nuclear, hydrogen, carbon capture, and long-duration storage may play larger roles. E3 estimated a near-term gap of about 9,000 megawatts by 2030, with roughly 3,000 megawatts of advanced-development resources and a remaining gap of about 6,000 megawatts if planned projects do not materialize. Members asked about Energy Northwest, hydro, data centers, battery storage, transmission, and whether neighboring states’ coal use affects Washington; E3 emphasized the need to accelerate permitting, interconnection, and project development. Finally, EPRI briefed the committee on its DC Flex initiative, which is studying how data centers can operate more flexibly to reduce strain on the grid and protect ratepayers. The presentation described work streams on flexible data center design, utility programs and tariffs, operational forecasting and interconnection, and on-site energy supply options, along with demonstrations in the U.S. and abroad. The speaker said the goal is to make data centers more responsive to grid conditions without compromising uptime, and noted that the initiative has a public forum and website for broader participation.
AZ

Arizona 2026 Regular Session

01/29/2026 - House Artificial Intelligence & Innovation

Artificial Intelligence & Innovation

Transcript Highlights:
  • One is their forecast and their load ramp.
  • One is their forecast and their load ramp.
  • One is their forecast and their load ramp.
  • Chair, I'm curious, has APS considered seasonal loads?
  • They operate north of a 92% load factor.
Bills: HB2133 , HB2592
TX

Texas 89th Regular

Business and Commerce Apr 1st, 2026

Business & Commerce

Transcript Highlights:
  • I'm a proponent of these things, having things close to the load when it's a critical load, then Being
  • and AI training loads ramp extremely fast, which base load doesn't meet.
  • And the definition of a large load is 75MW. So that brings in a lot of traditional industrial load.
  • Do they certify the load in a different methodology than the other Do they certify the load in a different
  • And loads are different than generators because loads typically don't want to be curtailed.
Summary: The Senate Committee on Business and Commerce convened to discuss critical infrastructure and supply chain integrity, particularly focusing on Texas's power grid and associated vulnerabilities. The meeting highlighted Texas's recent ranking as 10th in electricity affordability, emphasizing the state's commitment to maintaining a reliable and resilient electric grid. New committee members introduced themselves, and the agenda included testimony from ERCOT and the Public Utility Commission regarding the implementation of the Lone Star Infrastructure Protection Act, which aims to mitigate risks posed by foreign entities to the power grid. Chad Sealy from ERCOT presented updates on the attestation process for market participants, revealing that over 1,500 entities had submitted attestations regarding their corporate structures and affiliations with designated foreign countries. Concerns were raised about the adequacy of the current vetting process, particularly regarding indirect relationships with foreign adversaries. Testimonies from the PUC and the Attorney General's office underscored the challenges of enforcing compliance and the need for improved legislative measures to enhance oversight and security. The committee also heard from experts, including Dr. Emma Stewart from Idaho National Laboratory, who discussed the evolving threats to the grid from foreign adversaries and the importance of securing communication systems. Recommendations included prioritizing inspections of critical components and enhancing collaboration with national laboratories to address vulnerabilities. The discussion concluded with an acknowledgment of the balance needed between ensuring grid security and maintaining affordability for consumers.
WA
Transcript Highlights:
  • These are different vintages of load forecasts.
  • The load growth continues to accelerate after 2030.
  • One is primary load.
  • The second category is auxiliary loads. This includes cooling systems.
  • The second category is auxiliary loads. This includes cooling systems.
Summary: The committee held a work session covering PFAS regulation and impacts, no-cost allowance allocation for emissions-intensive trade-exposed industries (EITEs), and regional resource adequacy and data center load growth. Senator Victoria Hunt was welcomed as a new member. The Department of Ecology reviewed Washington’s Safer Products for Washington PFAS work, including completed restrictions on PFAS in outdoor furniture, carpets, rugs, stain/water-resistant treatments, and newer rules adopted in November restricting PFAS in most apparel, cleaning products, and automotive washes, with reporting requirements for some other products such as cookware and firefighting gear. Ecology also described Cycle 2 PFAS reviews now underway, including artificial turf and paints, and answered questions about compliance, online sales, sell-through periods, and how Washington’s approach differs from broader bans in states like Maine and Minnesota. The Department of Ecology also presented on PFAS in biosolids, describing a 2024 sampling study, limitations in testing methods, and a 2025 statutory amendment requiring additional sampling between 2027 and 2028 and a report to the legislature in 2029. The Department of Health then updated the committee on PFAS in drinking water, reporting that most Group A public water systems have completed sampling, that 317 sources and 188 systems are expected to exceed new contaminant levels, and that treatment costs for public systems are estimated at about $970 million, leaving a large funding gap; members also asked about private wells, health effects, bathing exposure, and home filters. The Board of Health’s new state action levels are being aligned with federal MCLs, and the department said it expects to continue monitoring and notification under state rules. Ecology also briefed the committee on no-cost allowance allocations to EITEs under the Climate Commitment Act, explaining the leakage-mitigation rationale, the current allocation schedule through 2034, and a forthcoming report on policy options for 2035-2050; members asked about industry barriers, competitiveness, and whether facilities might leave the state. Finally, E3 presented a regional resource adequacy study showing rising load, retirements outpacing additions, limited winter reliability value from wind, solar, and batteries, and a projected shortfall beginning in 2026 that could grow to about 9,000 MW by 2030 if planned projects are not built. The presentation emphasized winter cold-weather events, hydro variability, the importance of permitting and transmission, and longer-term options including nuclear, geothermal, hydrogen, carbon capture, and long-duration storage. EPRI then introduced its DC Flex initiative, which is studying how data centers can provide flexible load through workload shifting, cooling optimization, and on-site backup or bridging resources to reduce grid stress and protect ratepayers.
UT

Utah 2025 Regular Session

Public Utilities, Energy, and Technology Interim Committee - November 19, 2025

Public Utilities, Energy, and Technology Interim Committee

Transcript Highlights:
  • The law created a clear line between traditional load growth and new loads over 100 megawatts.
  • by new large loads while enabling new market-driven pathways for large load customers.
  • It's called load factor. The higher the load factor, the lower the average cost.
  • I get that, but it doesn't mean I can necessarily add more peak load if I had loads that said, hey, I'm
  • We've got plenty of load growth to accept that power.
DE

Delaware 2025-2026 Regular Session

Senate Environment, Energy & Transportation Committee Meeting Jun 23rd, 2026

Environment, Energy & Transportation

Transcript Highlights:
  • This bill combines the large load tariff provision.
  • There is a stay on large-load interconnection, and there will be no large-load interconnections anytime
  • We're going to miss that, so we're going to be relying on load shedding.
  • And if you combine that with a high load factor, so an 85% load factor means they are using that amount
  • If you have a bunch of diverse businesses... ...in this high load factor.
Summary: The committee heard several bills focused on energy, public safety, and environmental cleanup. House Bill 455 would create a historic preservation license plate to raise funds and awareness for Delaware preservation efforts, and House Bill 471 would tighten rules and penalties for off-highway vehicles on shared private roads, with golf carts excluded. House Substitute No. 1 for House Bill 439, the Truth in E-Bike Marketing Act, would require clearer disclosures when selling electric mopeds and electric motorcycles so consumers understand classification, power, and licensing/insurance requirements. House Substitute No. 1 for House Bill 407, related to the Hazardous Substance Cleanup Act and brownfields, would shift funding for brownfield cleanup from the original realty transfer tax approach to a dedicated share of the hazardous substance cleanup fund and raise civil penalties for fraudulent acts. The committee also approved the June 18, 2026 minutes once quorum was reached. Most of the meeting centered on House Substitute No. 1 for House Bill 233, as amended, a large-load/data center bill intended to protect ratepayers from costs tied to massive new electricity users. The sponsor and Public Advocate said PJM’s warnings about a coming reliability backstop auction made it urgent to establish a Delaware framework now, requiring large energy users to sign utility agreements, cover their share of transmission, distribution, and capacity costs, and comply with curtailment and other protections. Supporters from environmental groups and some labor and business voices said the bill was needed to prevent cost shifts to households and small businesses, while opponents argued it was being rushed, could deter investment, and might unintentionally affect other industries; several asked for more time and clearer definitions. No vote was taken in the portion provided. The committee also took up House Bill 470, which would authorize Delmarva Power, with PSC approval, to build and operate utility-owned battery storage and spread costs across the customer base. The sponsor and Delmarva said the bill would improve reliability quickly and help avoid outages, while the chair expressed concern that the state had not yet fully studied whether utility-owned or competitively procured storage is the best model, noting a recent SEU storage study and broader policy questions. Supporters said utility storage could be deployed faster and help with peak shaving, while others urged a competitive process; the transcript cuts off before any final action on HB 470.
TX
Transcript Highlights:
  • , and supporting new load types.
  • Percentage of solar to the load, if that makes sense, or as in it could be 15% of your overall load as
  • With loads, it's different.
  • And loads are different than generators because loads typically don't want to be curtailed.
  • So it’s more like the load is going to the generation than the generation is going to the load.
MN

Minnesota 2025-2026 Regular Session

Committee on Energy, Utilities, Environment and Climate - 02/23/26

Energy, Utilities, Environment, and Climate

Transcript Highlights:
  • It is the optimistic case through adding load through sort of fixed large loads like data centers or
  • </c> increase in load increase in load tended<00:15:13.760><c> to</c><00:15:13.920><c> see</c><00:15:
  • ><c> spreads</c><00:15:26.480><c> the</c> that is increasing load spreads the that is increasing load
  • </c> load management approaches. load management approaches.
  • . loads. loads.
MN

Minnesota 2025-2026 Regular Session

Defining “gross annual retail energy sales.” 3/5/26

Minnesota House Floor Meeting

Transcript Highlights:
  • </c> base load by more than by 40% or more. base load by more than by 40% or more.
  • </c><00:05:16.800><c> uses</c> in Gleno's case our native load uses in Gleno's case our native load uses
  • </c> here is that Gleno's native load. here is that Gleno's native load.
  • </c> town might have a 10 megawatt load. town might have a 10 megawatt load. uh<00:18:20.640><c> they
  • He asked whether the base load or native load is 20 megawatts, noting that the witness had also said
WA

Washington 2025-2026 Regular Session

House Environment & Energy Jan 22nd, 2026 at 08:00 am

Environment & Energy

Transcript Highlights:
  • We load up all the material on our vendors' vehicles at the same time.
  • There are other large potential large loads.
  • Data centers are not just another large load customer.
  • of load growth.
  • This allows them to protect ratepayers for all future sectors of load growth.
Bills: HB2515 , HB2343 , HB2301 , HB2272 , HB2367
FL

Florida 2025 Regular Session

November 5, 2025 - 03:30 PM

Transcript Highlights:
  • And that starts off with our setting the total maximum daily loads.
  • And then once we know what that load is, then we...
  • to that load and we say, all right, here is the maximum load to meet the concentration, how much loading
  • And if you look at all the loading from around the watershed and say the loading is currently at 200
  • ... ...culture is at least 20% or more of the nutrient loading in an area.
Summary: The Natural Resources and Disaster Subcommittee heard two informational presentations. First, the Department of Environmental Protection gave an overview of Florida’s water quality framework, explaining how numeric nutrient criteria, monitoring, TMDLs, and Basin Management Action Plans (BMAPs) are used to address impaired waters. DEP described recent changes intended to increase accountability, including five-year milestones in BMAPs, requirements for advanced wastewater treatment by 2033 in certain cases, limits on new conventional septic systems where sewer is available, enhanced nutrient-reducing septic requirements where sewer is not available, and a new agricultural regional water quality improvement element. The department also highlighted the Water Quality Improvement Grant Program, which has received nearly $1.4 billion over four years and funded more than 300 projects, as well as a public dashboard showing funded projects and a forthcoming trend-analysis dashboard for monitoring data. Members asked about enforcement of BMAP milestones, septic-to-sewer coordination with local governments, PFAS and microplastics monitoring, septic system performance standards, wastewater facility compliance, and how many facilities remain below advanced wastewater treatment standards. DEP said it can enforce BMAP obligations through administrative orders, consent orders, court action, fines, and permit conditions, and that it inspects and verifies wastewater facilities while relying on reporting and site inspections for sewer infrastructure. The department also said nutrient-reducing septic systems must achieve a 65 percent reduction in nitrogen and phosphorus, with verification required when projects seek BMAP credit. The committee then heard from the chief resilience officer on the Resilient Florida program, created in 2021 to address sea-level rise and coastal flooding. The presentation reviewed planning grants, vulnerability assessments, and the statewide critical-asset assessment, noting that all counties and most municipalities are expected to complete assessments by the end of 2026 and that vulnerability is now an eligibility requirement for future project funding. The program reported major statewide outcomes, including stormwater storage, miles of infrastructure and roadway protection, acres restored, and coastal protection projects, and highlighted examples such as breakwater improvements and lift-station elevation. Members asked about project delays, funding totals, overlap with other funding sources, and project prioritization; the program said delays often stem from design and permitting after award, that its reported totals reflect only grants it administers, and that projects are scored under the same criteria rather than being prioritized by asset type. The meeting ended with no further business and adjournment.
WA

Washington 2025-2026 Regular Session

Senate Environment, Energy & Technology Feb 20th, 2026 at 10:30 am

Environment, Energy & Technology

Transcript Highlights:
  • The House bill removed a provision, one of the elements, requiring the facility to curtail a reduced load
  • I want to talk about curtailing data center loads.
  • If data centers curtailed loads and local utilities, and those utilities reduce their loads on BPA, then
  • These same principles guided Tacoma Power as we designed our large load rate in 2024.
  • These same principles guided Tacoma Power as we designed our large load rate in 2024.
Bills: HB2338 , HB2367 , HB2426 , HB2606
CA

California 2025-2026 Regular Session

Assembly Utilities and Energy Committee Feb 25th, 2026

Utilities and Energy

Transcript Highlights:
  • We call them load-serving entities, or LSEs.
  • We call them load-serving entities or LSEs. providers. We call them load-serving entities or LSEs.
  • load growth.
  • Yeah, it depends on the load.
  • And when we talk about these projects and whether or not that should be load modifiers for the CECD load
FL

Florida 2025 Regular Session

December 9, 2025 - 08:30 AM

Transcript Highlights:
  • WE ANTICIPATE LARGE LOADS COMING ON.
  • IT OFFERS A LARGE LOAD CUSTOMERS SPEED TO MARKET.
  • BY ENSURING THAT NEW LARGE LOAD CUSTOMERS PAY THEIR FAIR SHARE OF COSTS.
  • TALK ABOUT LARGE LOAD CUSTOMER TARIFFS.
  • WE KNEW THE LOADS WERE COMING.
TX
Transcript Highlights:
  • And that created the ERCOT adjusted large load forecast.
  • Those curves are dictated by the load forecast.
  • The effective load carrying capacity is about 3 gigawatts.
  • Other participants Expressed concerns about issues such as load values, etc.
  • The load and the need. The generation that's going to be built.
Summary: The Senate Committee on Business and Commerce met with a quorum and took up several pending bills, voting favorably on SB 1612, SB 2717, SB 1468, SB 1642, and SB 1789. SB 1612 was reported favorably with objections to the local and contested calendar, while SB 2717, SB 1468, SB 1642, and SB 1789 were reported favorably, with SB 1642 and SB 1789 sent to the floor. SB 2717 would create the Texas Energy Efficiency Council; SB 1642 would add an executive director to the Texas Department of Insurance structure; and SB 1789 would establish pole standards and clarify PUC authority and remedies. The committee also heard an ERCOT update from CEO Pablo Vegas on the updated long-term load forecast, which showed a much higher unadjusted growth projection driven largely by data centers. ERCOT described an adjusted forecast using historical delays and lower realized build rates, and members discussed reliability, generation timelines, and the importance of SB 6 for demand response and flexibility. The committee then heard and left pending SB 2629, which would allow condominium and property owners’ association meetings and voting by electronic means; SB 2702, which would let nationally certified professionals test backflow prevention assemblies without a separate TCEQ license; SB 2167, which would let TDLR pause new license applications tied to human trafficking emergency orders or pending SOAH cases; SB 2349, which would exempt short-term leases and certain leasebacks from flood disclosure requirements; SB 2121, which would tighten the data broker registry law; and SB 2443, which would authorize TDLR electronic delivery of notices and other documents. Testimony generally supported these bills as cleanup, modernization, or workforce-streamlining measures, with some members expressing caution about electronic meetings and emphasizing in-person accountability. The committee also heard SB 2902 on coerced debt and identity theft, with testimony from a law professor and family violence advocates supporting stronger protections for survivors and suggesting a police report as an additional proof option. SB 512, a refiled bill restricting money transmission license holders from fining users for terms-of-service violations, also received supportive testimony and was left pending. Later, the committee heard SB 2145 on allowing certain TIF boards to meet virtually in narrow circumstances, SB 2268 on extending Texas Energy Fund loan deadlines in some cases, SB 1495 creating an EV supply equipment advisory board, SB 2154 regulating delivery network companies under a statewide framework, SB 2184 lowering the age for pyrotechnic operator and fireworks display permits from 21 to 18, SB 2211 on combining data centers, power generation, and produced-water desalination projects, and SB 647 on title theft protections and clerk authority to refuse fraudulent filings. Most of these bills were left pending after brief testimony and questions, with members focusing on reliability, regulation, and safeguards against fraud.
MN

Minnesota 2025-2026 Regular Session

House Energy Finance and Policy Committee 3/5/26

Energy Finance and Policy

Transcript Highlights:
  • While able remaining base load.
  • </c> base load by more than by 40% or more. base load by more than by 40% or more.
  • </c> whole native load is only 20 megawatts. whole native load is only 20 megawatts.
  • First, did you say your base load, or your native load, is 20 megawatts?
  • n or your did you say you your base load n or your native<00:23:11.039><c> load</c><00:23:11.360><c>
Bills: HF3296 , HF3802