US Federal 2025-2026 Regular Session

US Federal Senate Bill SB1566

Introduced
 
Introduced
5/1/25  

Caption

Preventing Power Outages Act

Summary

The Preventing Power Outages Act would extend and revise the federal program in the Infrastructure Investment and Jobs Act that provides grants to prevent electric grid outages and improve resilience. The bill updates the program’s reliability metrics by explicitly defining CAIDI, SAIDI, and SAIFI and requiring that outages longer than five minutes, including those on Major Event Days, be counted in those calculations. It also directs the Department of Energy, and in some cases states and Indian Tribes administering funds, to give additional weight to applicants with poorer reliability performance over the prior five years, as shown by higher outage-duration and outage-frequency scores. The bill further clarifies how grants may be prioritized and administered. It bars the Secretary, states, or Indian Tribes from requiring an application to address more than one category of activities, technologies, equipment, or hardening measures, and prohibits giving preference solely because an application covers multiple categories. Finally, it extends the program’s authorization from 2022–2026 to 2027–2031 and makes the funds available until expended.

Impact

If enacted, the bill would amend section 40101 of the Infrastructure Investment and Jobs Act, affecting federal grid-resilience grant administration and the criteria used to evaluate applicants. It would likely shift more funding toward utilities, states, and Indian Tribes with worse recent outage performance, while also limiting agencies’ ability to favor broader, multi-pronged applications over narrower proposals. The bill would extend the life of the existing grant program and keep federal resilience funding available for a longer period.

Sentiment

Based on the bill text and the absence of recorded committee debate or votes, the measure appears to be framed as a targeted, technical extension and refinement of an existing resilience program rather than a controversial overhaul. Its sponsors present it as a way to improve outage prevention and better direct resources to areas with the greatest reliability problems. No formal opposition, amendments, or recorded vote history is provided in the available materials.

Contention

The main policy issues are how to measure grid reliability and how to allocate limited grant funds. The bill favors applicants with worse SAIDI, SAIFI, or CAIDI scores, which could be viewed as a fair way to target need but may be disputed by entities that have invested in reliability and still seek funding. Another possible point of contention is the restriction on requiring applications to address multiple categories of resilience measures, which may be welcomed by smaller applicants but could be criticized by those who prefer integrated, comprehensive projects. No specific stakeholder objections are documented in the provided record.

Companion Bills

No companion bills found.

Previously Filed As

US SB1648

Relating To Power Outages.

US SB1648

Relating To Power Outages.

US HB2599

POWER Act of 2025 Preventing Outages With Electricity Reinforcement Act of 2025

US A257

Directs BPU to conduct study to determine whether deployment of microgrids and generators will reduce length of power outages.

US HB2046

Requires utilities to reimburse customer losses due to power outages

US S1237

Directs BPU to conduct study to determine whether microgrid and distributed energy resource deployment will reduce length of power outages.

US A1032

Directs BPU to conduct study to determine whether microgrid and distributed energy resource deployment will reduce length of power outages.

US SJR12

Noaa Buoy Outages

US A4509

Requires electric public utilities to provide industrial portable power stations accessible to customers during certain power outages.

US S04205

Establishes a program to develop microgrids that are capable of providing an uninterrupted supply of power to one or more community outage assets through an extended electric distribution outage.

Similar Bills

No similar bills found.