Video & Transcript Research : 'groundwater recharge'

Page 1 of 83
AZ

Arizona 2026 Regular Session

01/13/2026 - House Natural Resources, Energy & Water

Natural Resources, Energy & Water

Transcript Highlights:
  • to recharging and putting water into the basin.
  • The first would be California groundwater storage and recharge.
  • resource of groundwater.
  • resource of groundwater.
  • resource of groundwater.
AZ

Arizona 2026 Regular Session

01/21/2026 - House Appropriations

Appropriations

Transcript Highlights:
  • improvement district and the State Natural Resource Conservation Board to provide the stormwater recharge
  • coordinate with outlined agencies and entities to create an updated map of potential stormwater recharge
  • Strikes language that disqualifies certain stormwater recharge sites from the mapping and replaces it
  • Department of Water Resources provided a map on state trust lands for locations where they could recharge
  • We want it to get into the ground for recharge, so this bill does that.
Bills: HB2053, HB2116, HB2148
AZ

Arizona 2026 Regular Session

01/20/2026 - House Natural Resources, Energy & Water

Natural Resources, Energy & Water

Transcript Highlights:
  • And they pose a high risk of groundwater contamination, since many of these cesspools are located among
  • So it's important that Heala County sort of try to address the groundwater potential contamination in
  • this particular... ...try to address the groundwater potential contamination.
  • can introduce bacteria, including but certainly not limited to E. coli, as well as nitrates, to groundwater
  • it makes the most impact, which is why we included that the remediation of cesspools be based on groundwater
Bills: HB2029, HB2030, HB2096
AZ

Arizona 2026 Regular Session

02/17/2026 - House Natural Resources, Energy & Water

Natural Resources, Energy & Water

Transcript Highlights:
  • They can stop pumping their groundwater, use that water instead, so we're saving some water.
  • some groundwater pumping while getting a storage credit.
  • The dual benefit of reducing some groundwater pumping while getting a storage credit.
  • Replenishment District enrollment and groundwater replenishment requirements are met.
  • available in the Butler Valley groundwater basin to a depth of 1,200 feet.
TX

Texas 89th 2nd C.S.

Natural Resources May 14th, 2025

Natural Resources

Transcript Highlights:
  • , specifically in the Hayes Trinity groundwater district.
  • We have four operating groundwater districts in our county, and this is the only groundwater district
  • So the mag for each, uh, groundwater district was set, um.
  • formerly known as critical areas because it's experiencing critical groundwater declines.
  • , groundwater sources?
TX

Texas 89th Regular

Natural Resources May 14th, 2025

Natural Resources

Transcript Highlights:
  • County and by the Barton Springs Groundwater District.
  • , specifically in the Hays-Trinity Groundwater District.
  • We have four operating groundwater districts in our county, and this is the only groundwater district
  • I'm the general manager of the Hays Trinity Groundwater Conservation District.
  • There's not sufficient groundwater resources there to do a big export project.
AZ

Arizona 2026 Regular Session

03/10/2026 - Senate Natural Resources

Natural Resources

Transcript Highlights:
  • So our concern stems from the fact that the brackish groundwater is still regulated as groundwater.
  • Chairman, Senator, that would still be considered groundwater.
  • It's already part of our groundwater because we have brackish groundwater in Buckeye, which everybody
  • So it has nothing to do with water counting groundwater models.
  • What we heard here is groundwater is groundwater, brackish groundwater is groundwater.
TX

Texas 89th Regular

Water, Agriculture, and Rural Affairs May 5th, 2025

Water, Agriculture and Rural Affairs

Transcript Highlights:
  • Texas before issuing or amending groundwater permits.
  • Or amending groundwater permits.
  • and in the management of groundwater by those groundwater districts.
  • districts or groundwater wells in the district.
  • Relating to certain groundwater export fees collected by groundwater districts, HB 1689 by Representative
Summary: The Senate Water, Agriculture, Rural Affairs Committee heard several bills focused on groundwater management, water infrastructure, and agricultural land conservation. SB 612 would limit certain water districts in Hidalgo, Cameron, and Willacy counties from charging developers pipeline construction fees above actual, documented costs; the committee substitute removed a developer challenge mechanism to preserve district discretion over construction standards. HB 1633 would require groundwater conservation districts to consider registered exempt wells when reviewing or amending permits, and testimony from landowners, district representatives, and advocacy groups largely supported the bill as a way to protect domestic and livestock wells from drawdown caused by large export projects. HB 1689 would clarify that export fee revenues may be used for well operability, alternative water supplies, and aquifer monitoring, including through interlocal cooperation, and HB 3058 would give the Post Oak Savannah Groundwater Conservation District authority to use export fees for county road improvements and environmental programs tied to well inspection and groundwater management. HB 2018 would clarify that the Texas Farm and Ranchland Conservation Program is intended to purchase conservation easements only on working agricultural lands, with support from cattle raisers and Farm Bureau representatives. The committee also considered HB 29, which would require large water systems to validate water loss audits and submit mitigation plans; a committee substitute removed the water-loss threshold and adjusted the timeline for more detailed validation. Public testimony on the bills was generally supportive, with several witnesses describing declining well levels, road damage from export projects, and the need to preserve agricultural land and local water supplies. The committee adopted committee substitutes and voted favorably on HB 29, HB 1689, HB 2018, SB 612, and SB 3058, recommending several of them for the local and uncontested calendar; HB 1633 was left pending awaiting a committee substitute.
TX

Texas 89th Regular

Senate Committee on Water, Agriculture, and Rural Affairs May 5th, 2025

Water, Agriculture and Rural Affairs

Transcript Highlights:
  • in Texas before issuing or amending groundwater permits.
  • When considering an application for a groundwater permit, groundwater conservation districts (GCDs) must
  • and the management of groundwater. or by those groundwater districts.
  • It's essential for the inspection and monitoring of groundwater districts and our groundwater wells in
  • Post-Oak Savannah Groundwater District.
TX

Texas 89th 2nd C.S.

Natural Resources Apr 23rd, 2025

Natural Resources

Transcript Highlights:
  • Other areas have groundwater as a big option.
  • by exempting from groundwater conservation district, or GCD, permitting requirements groundwater wells
  • Again, we support brackish groundwater development.
  • We support brackish groundwater project initiatives and protecting our fresh groundwater supplies for
  • , the fresh groundwater, of those that are permitted.
Summary: The Committee on Natural Resources heard House Bill 2109, which would remove certain long-proposed reservoir projects from the state water plan after 50 years without progress. Chairman Van Deaver and many landowners, local officials, timber interests, and conservation advocates testified in support, arguing that the Marvin Nichols Reservoir has burdened Northeast Texas landowners for decades with the threat of eminent domain, depressed property values, and uncertainty over homes, farms, ranches, schools, churches, and cemeteries. Supporters also said the project would flood tens of thousands of acres, require extensive mitigation, harm timber and agriculture, and that Texas now has better alternatives such as conservation, reuse, aquifer storage and recovery, and desalination. Several members expressed sympathy for the affected families and questioned whether a project could remain in the plan indefinitely without progress. Opposition came from North Texas water interests, including the North Texas Commission, Tarrant Regional Water District, and the Texas Water Association, who argued that the bill would interfere with the state’s long-term water planning process and remove needed future supply options for a fast-growing region. They said Region C faces major projected shortages by 2070, that conservation and reuse have already delayed the need for new supplies, and that reservoirs remain one tool in the state’s water-planning toolbox. TWDB staff explained the existing inter-regional conflict process and noted that the substitute would affect several unique reservoir sites, not just Marvin Nichols. After testimony, Chairman Van Deaver closed by urging passage of the bill, but the committee withdrew the substitute and left HB 2109 pending. The committee then took up House Bill 5188, a brackish groundwater bill. The author said the bill would reduce permitting burdens for wells in designated brackish groundwater production zones, and the committee substitute added requirements on monitoring, groundwater-rights ownership, and allocation of pumpage limits while removing some exclusions and export-fee provisions. Texas Wildlife Association testified against the bill, warning that the exemptions could weaken groundwater conservation districts’ ability to protect freshwater resources and surface-owner rights. San Antonio Water System testified in favor, saying brackish groundwater is a key future supply and that the substitute would help speed development of desalination and brackish projects. The Texas Alliance of Groundwater Districts testified neutrally but raised concerns about reduced district oversight, especially around injection-well exclusions and the loss of export fees, and said discussions on the bill were ongoing.
TX

Texas 89th Regular

Natural Resources Apr 23rd, 2025

Natural Resources

Transcript Highlights:
  • And we're looking at groundwater sources.
  • for groundwater wells that are located within a brackish groundwater production area designated by the
  • The committee substitute requires that groundwater conservation districts (GCDs) within brackish groundwater
  • Groundwater Conservation District rules.
  • We support brackish groundwater project initiatives and protecting our fresh groundwater supplies for
TX

Texas 89th Regular

Natural Resources Apr 23rd, 2025

Natural Resources

Transcript Highlights:
  • Secondly, the groundwater moves, groundwater movement, pumping from inside and outside the district pulls
  • this groundwater from even as far as College Station and Bryan.
  • In closing, it is of utmost importance to our groundwater this that groundwater resources be protected
  • Surface water contaminants getting into the groundwater.
  • For North Texas Groundwater Conservation District.
TX

Texas 89th 2nd C.S.

Natural Resources Aug 21st, 2025

Natural Resources

Transcript Highlights:
  • I'm a groundwater engineer, been in around Texas for over 30 years on groundwater issues.
  • I'm a groundwater engineer, been 65 in around Texas for over 30 years on groundwater issues.
  • Yes, I think that is a key purpose of a groundwater conservation district is to conserve groundwater.
  • 276 Yes, I think that is a key purpose of a groundwater conservation district is to conserve groundwater
  • So, um, but again, I mean, it's the groundwater district's job to monitor that groundwater.
Bills: HB24, HB27
Summary: The committee met to hear House Bills 27 and 24 on groundwater issues in East Texas, with members and witnesses focusing on a proposed large-volume groundwater export project and the need for more science before major permitting decisions are made. HB 27, which was within the special session call, would direct the Texas Water Development Board to conduct a hydrogeologic study of the aquifers in the affected area and temporarily pause new export permits while the study is underway. HB 24, a separate bill that would limit certain production and export permits to 5% of modeled available groundwater, was laid out but the chair said it would not be moved out of committee. Testimony on HB 27 was largely supportive, though some witnesses were neutral. Supporters, including representatives from a water supply corporation, the Trinity River Authority, Environmental Defense Fund, and the Texas and Southwestern Cattle Raisers Association, said the region lacks enough hydrologic data, that the proposed pumping could affect private wells, surface water, and local economies, and that the state needs better information on sustainable yield and groundwater-surface water interaction. Several witnesses emphasized that groundwater conservation districts need clearer tools and better data, while also noting concerns about property rights and the rule of capture. Committee members discussed the scale of the proposed project, the absence of a groundwater conservation district in Houston County, and the possibility that the study should examine desired future conditions and maximum sustainable pumping rather than only modeled available groundwater. The committee adopted the committee substitute for HB 27 and voted it out favorably to the full House with a recommendation that it do pass, be printed, and be sent to the Committee on Calendars. The roll call was unanimous, 11 ayes and 0 nays. After the vote, members briefly reflected on the complexity of the issue and the need to continue working on broader groundwater policy in the interim and next session. HB 24 was discussed later in the meeting, but no final action on that bill was taken in the portion provided.
TX

Texas 89th 2nd C.S.

Land & Resource Management Mar 27th, 2025

Land & Resource Management

Transcript Highlights:
  • What I want to emphasize is how I think that this bill will protect rural groundwater supplies and in
  • I work a lot with the groundwater conservation districts on tools that they need, but growth is also
  • And so what we're seeing is a lot of these muds developments occurring where groundwater is the sole
  • availability study from any, um, developer that uses groundwater for a subdivision, and I think it was
  • They must require that if the builder developer is going to use groundwater as a supply of water.
Bills: HB24