Video & Transcript Research : 'electrical work'
Page 25 of 500
KY
Kentucky 2026 Regular Session
House Budget Review Sub. on Economic Development, Pub. Protection, Tourism, and Energy (2-3-26)
Transcript Highlights:
- , that plumbing, HVAC, and electrical, that plumbing, HVAC, and electrical, because<00:03:17.239>
- And you want to engage in plumbing work.
- <00:17:46.280>
inspectors, as electrical inspectors, as electrical inspectors, one<00:17:47.680 - That's how we try to approach our work.
- So I sure appreciate the work you all do.
Keywords:
00:01 Call to Order and Roll Call
01:32 Approval of Minutes
01:46 Public Protection Cabinet
19:05 Tourism, Arts and Heritage Cabinet
33:14 Adjournment, 958, all
Summary:
The Budget Subcommittee met without a quorum at first, then approved the minutes once a quorum was reached. The first presentation was from the Department of Housing, Buildings, and Construction within the Public Protection Cabinet. Commissioner Max Fuller and Deputy Commissioner David Moore reviewed the department’s licensing structure, noting about 50 license types and roughly 42,000 active licenses, with most tied to plumbing, HVAC, and electrical work. They compared Kentucky’s fees and requirements with neighboring states and said Kentucky is generally in line or slightly below surrounding states when local and contractor licensing requirements elsewhere are considered.
The department also described staffing and inspection pressures. Officials said boiler inspections have a measurable backlog, with about 18% of state-jurisdiction boilers and pressure vessels past due statewide and a higher percentage in Jefferson County. They said building code plan review turnaround has risen from about 30 days to roughly 33–35 days, and that some areas are struggling to maintain same-day plumbing inspections and three-day HVAC inspections. Members asked whether the agency could handle increased housing construction, especially in rural areas; the department said it had requested additional plumbing staff and a plan reviewer, particularly for the Bowling Green/Warren County area, and noted that electrical inspectors are stretched across the state and are also pulled into disaster response work.
The committee then heard from Kentucky Venues and the Kentucky State Fair Board on the Kentucky Exposition Center renovation and related operations. David Beck, board chairman David Williams, CFO Tony Shrek, and others said the project is progressing ahead of schedule, with keys to the new building expected in December and the facility already booked for future events. They reported strong tourism and economic impact, including record activity at the Exposition Center and downtown convention center, and said the Farm Machinery Show and other events continue to drive demand. Members asked about budget status, and the presenters said inflation, delayed access to funds due to the RFP/design process, and added costs have left them short of money to finish all planned work. They identified phase three funding needs, including food and beverage service improvements and completion of Freedom Hall seating, and said they are considering bringing food and beverage operations back under their control to improve efficiency and revenue. The meeting ended with no formal votes on the presentations and an announcement that the committee would meet again the following Tuesday.
TX
TX
Transcript Highlights:
- That's certainly not electric.
- Okay, how is coordination with electric service utilities working in practice when an operator requests
- They'll work it in their areas.
- We still had people working there, so we started this in '25 and did quite a bit of work in '25.
- Well, keep working. That's an important issue. We need to work on it.
NH
New Hampshire 2025 Regular Session
House Science, Technology and Energy (03/10/2025)
Science, Technology and Energy
ND
North Dakota 2026 1st Special Session
Advanced Nuclear Energy Committee Apr 21st, 2026 at 08:25 am
Advanced Nuclear Energy Committee
Transcript Highlights:
- We do a lot of work.
- You work with them too then? Correct. We don't do a ton of work in the mining area.
- “I’ve had 500 staff working for a year on this, Michael. I had 30 staff working for 45 days.”
- It's a chemistry that needs to be worked out.
- , which compares to 320 megawatt electric total.
NM
New Mexico 2025 Regular Session
IC - Science, Technology and Telecommunications Nov 12th, 2025
Science, Technology & Telecommunications Committee
Transcript Highlights:
- in a collaborative way and synergistically work towards that innovation piece so we together can work
- a lot of explosive work.
- We need to work together.
- I'm proud of the work that they're doing.
- We worked hard, and I will say that the structure of that working group was very successful for the interim
ND
North Dakota 2026 1st Special Session
Artificial Intelligence and Data Center Committee Jul 15th, 2026
Artificial Intelligence and Data Center Committee
Transcript Highlights:
- This is the work they were doing.
- They set the electric reliability standards for the electric industry.
- They oversee the transmission of electricity through the interstate electricity grid.
- the electric industry.
- They've done some really, really interesting work on electricity prices in the states, and I thought
Summary:
The committee held its first meeting on artificial intelligence and data centers, establishing its purpose as a study and policy-development body rather than one aimed at producing many bills. Majority Leader Hogue urged members to move quickly, focus on federal and other states’ AI laws, consider possible federal preemption, child protections, and the siting and economic impacts of data centers. Committee leadership echoed that the goal is practical, balanced governance that protects North Dakota while allowing innovation to continue.
Legislative Council staff provided a background memo and NCSL presented a detailed overview of AI concepts and the current state legislative landscape. The presentations distinguished narrow AI, generative AI, agentic AI, and theoretical AGI/ASI, and summarized major state policy themes: comprehensive AI laws in states such as Utah, Colorado, Texas, California, and Illinois; targeted laws on deepfakes, chatbots, health, education, notifications, and digital likeness; and growing use of appropriations and agency inventories. Members asked about Colorado’s repeal and reenactment, Texas’s sandbox and training provisions, oversight structures, and whether AI regulation is bipartisan; presenters said most issues cut across party lines, with broad agreement on child safety and deepfakes but more division on broader regulatory approaches.
The federal update focused on executive orders, preemption, and congressional activity. NCSL described a White House framework favoring a single federal standard, a DOJ litigation task force, Commerce Department review of state laws, and possible funding conditions tied to state AI policy, though no formal state-law challenge had yet occurred. The presentation also covered a recent executive order creating a voluntary federal vetting process for advanced frontier models after safety concerns, and congressional proposals including a failed 10-year state moratorium, Senator Blackburn’s child-safety bills, the Kids Online Safety Act, a House-passed children’s digital safety package, a Senate data center moratorium proposal, and a House ratepayer/data-center bill. The committee took no formal action beyond receiving testimony and asking questions.
NH
New Hampshire 2026 Regular Session
Senate Energy and Natural Resources (01/08/2026)
Energy and Natural Resources
NH
New Hampshire 2026 Regular Session
House Science, Technology and Energy (01/29/2026)
Science, Technology and Energy
Transcript Highlights:
- the complete electric restructuring. the complete electric restructuring.
- . work. work.
- It's been working very well. It works for the power utility.
- It<01:25:03.679>
works <01:25:04.000>for It works for It works for the<01:25:06.000> - electricity purchased by the electric electricity purchased by the electric distribution<05:40:17.120
TX
Transcript Highlights:
- No, no, no, that is not how this works.
- And I thank you for your work on that bill.
- I've worked with Vice Chair Hernandez.
- poles, and other related electrical equipment.
- They will be looking at electrical power lines, poles, and other electrical-related equipment, which
Keywords:
wildfire, wildfire mitigation, wildfire prevention, volunteer fire department, Texas A&M Forest Service, West Texas A&M University, prescribed burning, fuel loading, fuel reduction, firefighting equipment database, emergency communications, disaster preparedness, rural fire protection, asset hardening, natural resource management, emergency management, large wildfire risk, fire grant funding, fire suppression, Texas Legislature
WA
Washington 2025-2026 Regular Session
Senate Environment, Energy & Technology Dec 5th, 2025
Transcript Highlights:
- Today's work session will cover three topics.
- electricity coming in from out of the state and natural gas.
- Did that work? Okay. So at the beginning of the Through the Advent calendar. Did that work? Okay.
- So we started working in summer 2024 and worked in three phases.
- We're working on it. Go ahead.
Summary:
The committee held a work session covering PFAS regulation and impacts, no-cost allowance allocation for emissions-intensive trade-exposed industries (EITEs), and regional resource adequacy and data center load growth. Senator Victoria Hunt was welcomed as a new member. The Department of Ecology reviewed Washington’s Safer Products for Washington PFAS work, including completed restrictions on PFAS in outdoor furniture, carpets, rugs, stain/water-resistant treatments, and newer rules adopted in November restricting PFAS in most apparel, cleaning products, and automotive washes, with reporting requirements for some other products such as cookware and firefighting gear. Ecology also described Cycle 2 PFAS reviews now underway, including artificial turf and paints, and answered questions about compliance, online sales, sell-through periods, and how Washington’s approach differs from broader bans in states like Maine and Minnesota. The Department of Ecology also presented on PFAS in biosolids, describing a 2024 sampling study, limitations in testing methods, and a 2025 statutory amendment requiring additional sampling between 2027 and 2028 and a report to the legislature in 2029. The Department of Health then updated the committee on PFAS in drinking water, reporting that most Group A public water systems have completed sampling, that 317 sources and 188 systems are expected to exceed new contaminant levels, and that treatment costs for public systems are estimated at about $970 million, leaving a large funding gap; members also asked about private wells, health effects, bathing exposure, and home filters. The Board of Health’s new state action levels are being aligned with federal MCLs, and the department said it expects to continue monitoring and notification under state rules. Ecology also briefed the committee on no-cost allowance allocations to EITEs under the Climate Commitment Act, explaining the leakage-mitigation rationale, the current allocation schedule through 2034, and a forthcoming report on policy options for 2035-2050; members asked about industry barriers, competitiveness, and whether facilities might leave the state. Finally, E3 presented a regional resource adequacy study showing rising load, retirements outpacing additions, limited winter reliability value from wind, solar, and batteries, and a projected shortfall beginning in 2026 that could grow to about 9,000 MW by 2030 if planned projects are not built. The presentation emphasized winter cold-weather events, hydro variability, the importance of permitting and transmission, and longer-term options including nuclear, geothermal, hydrogen, carbon capture, and long-duration storage. EPRI then introduced its DC Flex initiative, which is studying how data centers can provide flexible load through workload shifting, cooling optimization, and on-site backup or bridging resources to reduce grid stress and protect ratepayers.
MA
Massachusetts 2025-2026 Regular Session
Senate Committee on Climate Change and Global Warming Jun 21st, 2026 at 10:00 am
Senate Committee on Climate Change and Global Warming
Transcript Highlights:
- At a time of growing electricity demand and climbing electric prices, we need to add significant generating
- We've been working on, and you may hear this from others, we've been working with the DPU on coming up
- that we do and how it works.
- that we do and how it works.
- These are just a few projects we are working on.
Summary:
The hearing focused on ways Massachusetts can accelerate solar deployment, lower costs, and preserve reliability as electricity demand rises and federal support for solar and other renewables changes. Chair Creem opened by emphasizing solar’s role in meeting climate mandates and peak demand, citing June heat-wave data showing behind-the-meter solar reduced wholesale prices and saved ratepayers money. Commissioner Elizabeth Mahoney of DOER said Massachusetts has grown from 3 MW of solar in 2008 to 3.5 GW today, highlighted SMART 3.0 as a flexible, evergreen incentive program, and said DOER is working on updated rates, interconnection reforms, flexible interconnection, net crediting, and a petition to the DPU to speed implementation. She also said Massachusetts joined the lawsuit over canceled federal Solar for All funding.
Committee members and witnesses discussed several policy changes to speed projects before federal tax credits expire, including automated permitting, remote inspections, faster interconnection, and changes to caps on municipal and regional solar development. Senator Barrett pressed Mahoney on whether the 10 MW municipal cap and regional caps should be lifted, and on whether the state should increase its solar tax credit to offset the loss of the federal residential credit. Mahoney said the municipal cap should be revisited and that interconnection cost allocation and other market issues need to be worked out before lifting broader caps. She also said DOER is open to automated permitting and is already developing a permitting portal under the 2024 climate law.
Industry and advocacy witnesses largely supported streamlining measures. Sunrun’s Bronte Payne urged removal of a proposed requirement that all net-metered facilities enroll in SMART, and recommended automated permitting, remote inspections, flexible interconnection, better hosting-capacity information, consumer protections, and continued support for Connected Solutions and virtual power plants. Permit Power’s Hannah Bernbaum and Solar App’s Matthew McAllister argued that smart permitting and remote inspections can significantly reduce soft costs and delays, with McAllister saying Solar App now operates in over 320 jurisdictions and saves about three weeks on average. They said remote inspections are already common and can be done safely with photos, video, and qualified third parties. Community solar and clean energy advocates, including CCSA’s Kate Daniel and Vote Solar’s Lindsay Griffin, supported a 10 GW solar target by 2035, a higher refundable state tax credit for low-income households, interconnection reforms, flexible interconnection, and preserving the option to build outside SMART so projects can retain renewable energy certificates. No votes were taken; the hearing was informational, and members requested follow-up materials and draft language from witnesses.
MA
Massachusetts 2025-2026 Regular Session
Joint Committee on Telecommunications, Utilities and Energy Jun 21st, 2026 at 01:00 pm
Joint Committee on Telecommunications, Utilities and Energy
Transcript Highlights:
- right to do that work.
- And friends work together to solve problems. Let's work together. Let's make our community safer.
- And friends work together to solve problems. Let's work together. Let's make our community safer.
- Education alone doesn't work.
- It's clearly not working.
Summary:
The committee heard testimony on a wide range of late-file energy bills, with much of the discussion focused on battery storage siting, gas system expansion, propane consumer protections, gas workforce safety, and a Taunton home-rule petition on water rates for manufactured housing communities. Representative Sweeney urged support for H. 4689 and H. 4690, which would impose a moratorium and setback requirements for lithium battery storage facilities, citing fire risk, proximity to homes, and environmental concerns. Several local officials and residents from Oakham, Tewksbury, and other communities described proposed battery projects near homes, schools, wetlands, and conservation land, while industry and clean-energy advocates argued the bills would effectively block storage development and conflict with state energy goals and existing fire-safety standards.
The committee also heard strong support for S. 2290/H. 3547, a bill to prevent gas expansion near environmental justice communities, from environmental justice advocates, municipal officials, and clean-energy groups. Testimony emphasized rising gas bills, the cost of new pipelines, methane and health impacts, and the need to avoid locking in long-term gas infrastructure costs. Witnesses also discussed related bills on gas workforce safety, gas shut-off valves, and gas meter replacement plans, with labor representatives supporting safety-focused measures and opposing changes they said would weaken inspections, while consumer and environmental advocates argued that some utility replacement practices are unnecessarily expensive and should be reined in to reduce ratepayer costs.
Other testimony included support for H. 3518 on propane gas ratepayer protections, with the witness arguing for clearer contract terms and website price disclosure, and support for S. 2652, which would authorize Taunton to create a separate water billing rate for manufactured housing communities because residents there are effectively paying higher water costs through rent due to a single master meter. No committee votes or final actions were taken during the hearing, and members mostly asked brief clarifying questions or made no comment after testimony.
TX
Texas 89th 2nd C.S.
Ways & Means
Transcript Highlights:
- And so we're working through that.
- Are you working on batch one?
- It requires more electricity.
- There's some overlap there in terms of electrical work, and plumbers are not a thing we really need.
- I'm already working on a bill.
TX
Transcript Highlights:
- And so we're working through that.
- Are you working on batch one?
- It requires more electricity.
- There's some overlap there in terms of electrical work, and plumbers are not a thing we really need.
- I'm already working on a bill.
Summary:
The Committee on State Affairs convened to discuss data centers and their impact on Texas's energy infrastructure. The meeting featured testimony from key representatives of the Public Utility Commission (PUC) and ERCOT, who outlined the evolving landscape of energy generation and the challenges posed by the rapid growth of data centers. Notably, ERCOT reported over 450,000 MW of generation resources planned for connection, with a significant portion attributed to data centers, which now represent around 87% of new large load interconnection requests.
The committee explored proposed changes to the interconnection process, including a new 'batch study' approach aimed at streamlining the approval of multiple projects simultaneously. This change is intended to address the challenges of managing numerous simultaneous requests and to provide more certainty for developers regarding their energy needs. Testimonies emphasized the importance of ensuring that the costs of infrastructure upgrades are borne by the data centers rather than residential ratepayers, with discussions around the financial commitments required from developers.
Several data center developers also provided testimony, highlighting the economic benefits of their projects, including job creation and increased local revenues. They expressed concerns about the potential for a moratorium on future growth due to the new interconnection rules and emphasized the need for a collaborative approach to address water usage and environmental impacts. The committee plans to continue discussions on these topics in future hearings, with a focus on balancing economic growth with energy reliability and resource management.
WA
Washington 2025-2026 Regular Session
Joint Committee on Energy Supply, Energy Conservation, and Energy Resilience Dec 3rd, 2025
Joint Committee on Energy Supply, Energy Conservation, and Energy Resilience
Transcript Highlights:
- West Tech is a consortium of industry organizations from the electric sector all working together to
- So that’s the context of this work.
- with the work group.
- I work everywhere. Well, it's... I work everywhere.
- After a lot of our land work, a lot of stakeholder engagement work, we did finally file in 2024.
Summary:
The Joint Committee on Energy Supply, Energy Conservation, and Energy Resilience opened by electing Senator Shoemake as chair and Representative Alex Ibarra as vice chair. Members then moved into a series of work sessions focused on data centers, transmission, and workforce needs tied to Washington’s clean energy and grid planning challenges.
Kate Bruns and Glenn Blackman presented preliminary findings from the governor’s Data Center work group, created under Executive Order 25-05. They said the group met for six months, received more than 1,000 public comments, and included representatives from agencies, industry, tribes, labor, utilities, environmental groups, and research institutions. The presenters emphasized that data centers are expected to be the largest source of load growth over the next five to ten years, creating concerns about grid capacity, ratepayer impacts, forecasting, water use, backup generation, and compatibility with Washington’s energy and climate laws. They described nine recommendations, including protecting existing energy and climate policy, improving forecasting, seeking more clean power and transmission, and encouraging flexible data center operations. A proposed tax incentive change that would have expanded eligibility while tying the exemption to new clean electricity sources narrowly failed in the work group. Members asked about tribal consultation, cooling technologies, and local benefits from data centers; the presenters said tribal consultation was ongoing and a final report would follow.
Keegan Moyer of West Tech then outlined a regional transmission study showing major strain on the Western grid from load growth, electrification, resiliency needs, and limited transmission capacity. He said the 10-year study identified about 12,000 line miles of needed projects across the West, with roughly $56 billion in estimated costs, including planned projects, reliability upgrades, and new interregional transfer projects. He stressed that many projects are upgrades within existing rights-of-way, but new corridors are still needed, and he previewed recommendations on permitting, equipment procurement, cost allocation, and project sponsorship. In response to questions, he discussed the difficulty of crossing jurisdictional “seams,” the role of federal coordination, landowner compensation, eminent domain as a last resort, and the limited role of public financing beyond a federal GRIP grant.
Stephanie Scott of Commerce presented the transmission workforce study, which focuses on substation technicians, line workers, and line clearance tree trimmers. She said current workforce levels are far below what will be needed under a clean energy expansion scenario, and that active projects are essential because apprenticeship training depends on thousands of hours of hands-on work. She highlighted barriers such as high upfront CDL and pre-apprenticeship costs, the need for wraparound supports, and the importance of expanding access for women, people of color, and tribal communities. Members asked about tribal utility apprenticeship programs, utility-run training pipelines, and whether the study included funding sources; Scott said the report would include an inventory of apprenticeship programs and tribal considerations, but revenue ideas were outside the study scope.
Finally, Brant Johnson of Grid United described the North Plains Connector as a case study in large transmission development. He said the project, a 420-mile, 3,000-megawatt HVDC line connecting Montana and North Dakota, has relied on early stakeholder engagement, route changes, tribal consultation, and coordinated federal and state permitting to reduce risk and shorten timelines. He said the project aims for permits by the end of 2026 and construction beginning in 2028, with an earliest commercial operation date of 2032. In response to questions, he discussed the challenges of crossing regional seams, interconnection queues, land acquisition and compensation, eminent domain, and financing, noting that the project is primarily privately financed with a $700 million federal grant covering a portion of costs.
NM
New Mexico 2025 Regular Session
IC - Economic and Rural Development Jul 7th, 2025
Economic & Rural Development & Policy Committee
Transcript Highlights:
- and work with us.
- They have Kit Carson Electric Co-op that's wanted to make that work.
- that work.
- We can even work...
- To make that work faster.
MN
Minnesota 2025 1st Special Session
The Debate Around Expanding Nuclear Energy in MN / Supporting Sustainable Aviation Fuel Production Mar 9th, 2025
Minnesota Senate Floor Meeting
TX
Texas 89th Regular
Senate Committee on Business and Commerce Mar 25th, 2025 at 08:00 am
Business & Commerce
Transcript Highlights:
- These include specialized research on electricity.
- I'm a survey technician here working in Austin.
- It can also work around the clock. It can even work around the calendar if necessary.
- Earth and it can provide dispatchable electricity when needed. It can also work around the clock.
- It can even work around the calendar if necessary.
Bills:
SB483, SB522, SB783, SB1239, SB1254, SB1255, SB1259, SB1341, SB1664, SB1762, SB1856, SB1877, SB1977
Keywords:
utility, proprietary information, customer data, data protection, electric service, customer information, emergency communication, electric utility, privacy, certification, public accountants, interstate licensing, accounting, regulatory amendment, energy efficiency, construction regulations, building codes, Texas, sustainability, cost-effectiveness
Summary:
The Senate Business and Commerce Committee met with a quorum and first took up pending business, voting out several bills. Senate Bills 1697, 1569, 1202 as substituted, 1029, 1364, 1185, 924, 1008 as substituted, 264, 1376, and 1358 as substituted were reported favorably, with some sent to the local and uncontested calendar. The committee also adopted a substitute for SB 1202 and later corrected votes on several measures. SB 924 and SB 1376 drew some opposition, while the rest of the pending bills were reported without dissent or with limited nays.
The committee then heard testimony on SB 1856, which would create an annual capacity-cost recovery rider for Entergy Texas customers in the MISO region. The author and Entergy argued the bill would better match rates to actual capacity costs and improve transparency, while the Texas Association of Manufacturers and the Public Utility Commission raised concerns about the short 10-day review period, rider proliferation, and the preference for full rate cases over piecemeal adjustments. The bill was left pending. The committee also heard and left pending SB 522 on CPA reciprocity, SB 1664 requiring TDUs to provide clearer, standalone rate-change disclosures, SB 1877 expanding OPUC’s access to market data, SB 1254 and SB 1255 as TDLR cleanup bills on professional employer organizations and mold assessors, SB 1341 updating manufactured housing rules, SB 1239 on sovereign debt and Texas governing law, and SB 1259 streamlining the surveyor-in-training licensing process.
Additional bills discussed included SB 1977, which would cap recoverable legal expenses in electric, water, and sewer rate cases; OPUC and some consumer advocates supported the idea as a way to reduce ratepayer costs, while utility representatives warned it could discourage participation and increase rate shock. The committee also heard SB 1762 clarifying that geothermal energy conservation wells are not battery resources, and SB 783 allowing SECO to proceed with future energy-code rulemaking for state-funded buildings. Both drew supportive testimony from industry and environmental groups. All remaining bills heard during the meeting were left pending, and the committee recessed subject to the call of the chair.
FL
Florida 2025 Regular Session
Regulated Industries Mar 4th, 2025
Transcript Highlights:
- Electricity. And a reliable source of electricity is critical for the digital economy.
- And that is a testament to the work that we're doing. We've got a lot more work ahead of us.
- Tampa Electric now for 28 years.
- We were able to work.
- I bring him down, putting them to work cutting and the Duke who put them immediately to work restoring