Video & Transcript : 'delivery contractor' :
Page 13 of 439
LA
Louisiana 2026 Regular Session
Transportation, Highways and Public Works Jun 22nd, 2026
Transcript Highlights:
- And so that's been our largest delivery rate in quite some time.
- And so that's been our largest delivery rate in quite some time.
- Mary Parish that is in the delivery stage. You see 90 of 91.
- Eric Dauphine, Assistant Secretary, Project Delivery for DOTD.
- We had some great contractors, some great engineers.”
Summary:
The committee met for an information-only hearing with no votes or other action items. DOTD Secretary Glenn LaD and Deputy Secretary Beau Black gave an update on the department’s transformation efforts, focusing on faster project delivery, improved construction administration, and new technology. They said monthly contractor payment approvals have been reduced from roughly 35 days to 15 days or less, change orders from about 40-45 days to around five days, and that DOTD delivered 86% of its advertised projects in the last fiscal year. They also described new tools such as Headlight for field inspections, Smart PM for schedule tracking, Hall Hub for e-ticketing and work-zone mapping, and a pilot using advanced sensors on district vehicles to identify potholes, guardrail damage, and other asset issues. The department also outlined a district reorganization that replaces the area engineer model with dedicated district points of contact for construction, maintenance, and operations, with no increase in total staff.
Members raised concerns about local maintenance issues, especially mowing, drainage, culverts, potholes, and communication with district offices. Several members asked for clearer coordination on jurisdictional questions, more frequent meetings with district administrators, and better public updates on long-running projects. LaD said DOTD would schedule follow-up meetings, use the coming customer service portal to track complaints, and improve public communication through project information officers, social media, and other outreach. Questions also covered contractor accountability, utility relocations, road transfer maps on the DOTD website, and whether maintenance work adjacent to capital projects should be handled by district crews or through new IDIQ contracts.
The secretary also reviewed the Highway Priority Program process, saying DOTD will work between June and September to review projects not included in the prior program, explain why, and refine a five-year fiscally constrained plan before the fall road show. He said the department is using IDIQ authority to award bridge maintenance and other task-order work, and that this should help address a two-year bridge repair backlog. Members discussed whether current funding levels are enough to reduce the statewide backlog, and DOTD said the current program likely maintains rather than eliminates it absent new revenue. The hearing ended with a project-specific update that a barge struck the Black Bayou Pontoon Bridge that morning, causing significant damage; DOTD said divers and staff would inspect it and determine emergency repairs. After DOTD’s presentation, Archie Chesson of the Office of Louisiana Highway Construction gave a brief update on that office’s first year, describing its use of consultant pools, master service agreements, a public GIS map, and a data tool to prioritize rural road and bridge projects, with several early projects already completed or under construction.
WA
Washington 2025-2026 Regular Session
Joint Transportation Committee Jun 24th, 2025
Joint Transportation Committee
Transcript Highlights:
- Yet there seems to be maybe less opportunity for our local contractors, especially smaller contractors
- And they put us in touch with several, I would say, prime contractors, also minority or smaller contractors
- alternative delivery made sense or not for those.
- The project delivery streamlining study that I think you'll hear about after we're, The project delivery
- regulations and efficient project delivery.
Committee:
Joint Joint Transportation Committee
Summary:
The meeting began with introductions from members of the Joint Transportation Committee and a presentation from the Association of Washington Cities and the public works directors of Richland, Kennewick, Pasco, and West Richland. The cities described the Quad Cities region as one of the fastest-growing in the state and outlined shared transportation priorities that align with the committee’s focus on safety, multimodal access, climate resilience, and economic development. They emphasized Vision Zero efforts, complete streets, ADA accessibility, regional trail and bike/pedestrian planning, and coordinated long-range transportation and land-use planning to manage growth.
The city officials also discussed major funding and delivery challenges, including rising construction costs, project phasing, pavement preservation, right-of-way acquisition, and delays caused by state and federal permitting and review processes. They highlighted regional cooperation through the Benton-Franklin Council of Governments, Good Roads, and local funding tools such as impact fees, transportation benefit districts, REET, tax increment financing, and state and federal grants. Specific projects discussed included Richland’s SR 240/Aaron Drive complete streets project and downtown connectivity work, Kennewick’s Columbia Center Boulevard improvements and rail study, Pasco’s Court/Road 68, Sylvester Street corridor, I-182 bridge/interchange work, and a new north-south bridge study, and West Richland’s SR 224 Red Mountain corridor project, which officials said was awarded under budget and is scheduled to begin construction.
Committee members asked questions about sidewalk connections to schools, state-agency right-of-way timelines, apprenticeship utilization, contractor selection, and whether complete streets requirements add burdens to pavement preservation projects. The city officials said new development is generally meeting sidewalk standards, but older infill areas remain a gap; that state right-of-way transactions can take much longer than expected; that apprenticeship requirements are common but harder for smaller contractors and local labor markets; and that low-bid contracting leaves little room to screen for performance history. They also said complete streets requirements are usually manageable on major projects but can be difficult to absorb in smaller preservation work.
The committee then shifted to a JTC-funded study on transit-oriented development, presented by Urban Institute researcher Yona Freemark. The study examined TOD conditions in 33 cities in Snohomish, King, Pierce, Clark, and Spokane counties near rail and bus rapid transit stations. Freemark said Washington’s housing affordability crisis is severe, especially near transit, and found that high-cost cities have seen more development near stations but also signs of gentrification and loss of affordable housing, while lower-cost cities have had less development and worsening affordability relative to income. He identified barriers including high debt costs, land costs, infrastructure costs, zoning and parking rules, and limited subsidies for affordable housing. He recommended more neighborhood infrastructure funding near stations, stronger affordable housing investment, and better use of public land, noting that HB 1491 and related legislation are already changing some local requirements.
WA
Washington 2025-2026 Regular Session
Joint Transportation Committee Jun 24th, 2025 at 12:30 pm
Transportation
Transcript Highlights:
- Yet there seems to be maybe less opportunity for our local contractors, especially smaller contractors
- methods, including general contractor construction management... ...delivery methods, including general
- And they put us in touch with several, I would say, prime contractors, also minority or smaller contractors
- delivery projects.
- regulations and efficient project delivery.
Committees:
Joint Transportation , Joint Joint Transportation Committee
Summary:
The committee met in the Quad Cities area and first heard a joint presentation from public works directors from Richland, Kennewick, Pasco, and West Richland on regional transportation priorities, challenges, and project delivery. The cities said their priorities align with JTC goals such as safety, multimodal access, climate resilience, and economic development. They highlighted regional coordination through the Benton-Franklin Council of Governments and Good Roads, use of multiple funding sources including TIB, REIT, impact fees, transportation benefit districts, and tax increment financing, and a shared approach to Vision Zero, complete streets, ADA access, and active transportation planning. They also described major projects such as Richland’s downtown connectivity and SR 240/Aaron Drive improvements, Kennewick’s Columbia Center Boulevard corridor and rail study, Pasco’s Court/Road 68, Sylvester Street, Broadmoor interchange, and north-south bridge concepts, and West Richland’s SR 224 Red Mountain project.
The directors also described common obstacles: rising construction costs, project phasing, permitting and right-of-way delays, utility coordination, pavement preservation needs, and workforce shortages. West Richland emphasized that its SR 224 project stayed on schedule by setting clear roles, maintaining frequent communication, resolving right-of-way issues early, and reducing contractor risk through detailed plans and utility relocation. Committee members asked about sidewalk connections to schools, state-agency right-of-way timelines, apprenticeship utilization, contractor selection, and whether complete streets requirements add burdens. The cities said sidewalk gaps are most common in older infill or unincorporated areas, state right-of-way processes can be slow, apprenticeship requirements are generally built into funded projects but are hard for smaller contractors to meet, and there is no easy fix for low-bid contractors with poor performance histories.
After the local presentations, staff introduced a JTC-funded study on transit-oriented development policy, and Urban Institute researcher Yona Freemark presented findings from work covering 33 cities in the Puget Sound, Spokane, and Vancouver regions near rail and bus rapid transit stations. He said Washington faces a severe housing affordability problem, with rising rents and home prices, and that TOD can help connect housing and transit but must be tailored to different market conditions. The study found that higher-cost cities near transit have seen more development but also signs of gentrification and loss of affordable housing, while lower-cost cities have had less development and still face worsening affordability. Freemark identified barriers including high debt and construction costs, limited subsidy resources, high land costs, regulatory and parking requirements, and impact fees, and he said HB 1491 and related legislation may address some zoning and parking constraints. He recommended more targeted state support for neighborhood infrastructure around stations and policies that reflect the different conditions of high- and low-demand communities.
TX
Bills:
HB2007 , HB2462 , HB2621 , HB2921 , HB3187 , HB3331 , HB3332 , HJR144 , HB3514 , HB3528 , HB3539 , HB3563 , HB3720 , HB3726 , HB3751 , HB3859 , HB3947 , HB4148 , HB4164 , HB4337 , HB4346 , HB4368 , HB4706 , HB4916 , HB4950 , HB4967 , HB5177 , HB5603
Committee:
House Transportation
Keywords:
commercial signs, county approval, transportation code, regulations, road signage, high occupancy vehicle lane, pregnant operators, transportation, parental rights, motor vehicle regulations, live video feed, state agency, transparency, public safety, confidentiality, personal information, local government, airport data, public records, regional transportation
TX
Transcript Highlights:
- confidential or otherwise privileged information, nor may a non-citizen be a member, employee, contractor
Bills:
HB 120 , HB20 , HB150 , HB6 , HB 100 , HB 124 , HB210 , HB215 , HB1393 , HB1587 , HB 1151 , HB 1268 , HB142 , HB451 , HB39 , HB 102 , HB 126 , HB290 , HB300 , HB2143 , HJR2 , HB147 , HJR6 , HB 120 , HB20 , HB150 , HB6 , HB 100 , HB 124 , HB210 , HB215 , HB1393 , HB1587 , HB 1151 , HB 1268 , HB142 , HB451 , SB1
Keywords:
career readiness, education reform, workforce training, public schools, financial aid, applied sciences, career education, high school diploma, certificate program, work-based learning, job placement, high-growth jobs, technical training, cybersecurity, state command, information resources, data protection, incident response, mental health, telehealth
Summary:
The House convened with prayer, pledges, and several ceremonial recognitions, including Wilson County Day, San Antonio Mission Indian Descendants Day, and Blue Ribbon Lobby Day, along with acknowledgments of visiting groups and a birthday greeting. The chamber also announced committee meetings and then moved into floor business, including conference committee action on Senate Bill 1, the state budget.
A series of motions to instruct House conferees on SB 1 were debated and voted on. One motion sought to restore salary for Attorney General Ken Paxton after his impeachment-related suspension; it passed 88-56. Another, from Rep. Olcott, directed conferees to support amendments requiring data collection on the costs of undocumented immigrants in hospitals and prisons; after extended debate and a failed amendment from Rep. Martinez Fischer to also study immigrants’ economic contributions, the motion passed 86-61. The House also adopted instructions to eliminate Texas Lottery Commission funding, to support amendments restricting public education institutions from affirming gender identities inconsistent with biological sex, and to seek an additional $4 billion in property tax relief, with each motion passing on recorded votes.
The House then took up a supplemental calendar and passed several bills, including HB 39 on veteran death data, HB 102 on priority registration for certain students entering military service, HB 126 on student-athlete compensation and representation, HB 290 on tuition and fee assistance for members of the Texas military forces, HB 300 on Texas Armed Services Scholarship Program updates, and HB 2143 naming a highway in honor of Army Specialist Joey Lins. The chamber also postponed consideration of HJR 2 and HJR 6.
Later, the House considered HB 120 on career and technology education pathways and HB 20 on applied science pathway programs for high school students. HB 120 received a perfecting amendment and was advanced after discussion about workforce preparation. HB 20 prompted extensive questioning about transportation, costs, and how students would access partner campuses such as community colleges and TSTC sites; debate continued as the transcript ended, with members examining how the program would operate and whether approval authority would rest with TEA.
MO
Transcript Highlights:
- But as a contractor myself, I'm looking at work comp.
- On 379.205, number four, it says that delivery drivers are to be independent contractors for all purposes
- On 379.205, number four, it says that delivery drivers are to be independent contractors for all purposes
- Did they have any, and were they doing a delivery?
- They weren't on a delivery. Here's a copy of the active policy that...” They weren't on a delivery.
Committees:
House Insurance , House Insurance and Banking
WA
Washington 2025-2026 Regular Session
Joint Oregon-Washington Legislative Action Committee Jun 12th, 2026
Joint Oregon-Washington Legislative Action Committee
Transcript Highlights:
- So the team is transitioning from a planning phase to a delivery phase.
- The design-build team consists of a designer and the contractor.
- The design-build team consists of a designer and the contractor.
- And notably, this transition to construction delivery.
- rather than dealing with small contractors.
Summary:
The Joint Committee on Interstate 5 Bridge met remotely with Washington legislative members to receive updates on the Interstate Bridge Replacement Program, including environmental review, cost and funding, tolling, and procurement for construction. Program staff said the final supplemental environmental impact statement was published in April 2026, with a federal record of decision expected in early summer. They described the recommended design as a single-level fixed-span bridge, centered I-5 alignment, C Street ramps, one auxiliary lane in each direction, and dispersed park-and-ride parking. Members raised concerns about transparency, the closed chat function, and the decision not to include two auxiliary lanes; staff said the one-lane option was recommended through consultation with partner agencies and analysis, but the final decision would come with the record of decision. Staff also said the diversion analysis projected less than 3% traffic diversion to I-205 in 2045, though members from Oregon and Washington expressed concern about impacts to their communities and asked for more detail on mitigation and decision-making.
The committee also reviewed a major cost update. Staff said the full five-mile program is now estimated at $13.5 billion to $15.2 billion, with a likely cost of $14.4 billion, up from a 2022 estimate of $5 billion to $7.5 billion, citing inflation, schedule delays, scope changes, and more detailed risk modeling. They said the first funded phase has been reduced to a $5.68 billion package focused on the Columbia River bridge replacement, connections to I-5, Hayden Island and SR-14, bridge demolition, tolling infrastructure, and advancing light rail design. Funding for that phase was described as $5.69 billion, including $2.1 billion federal funds, $1 billion from each state, and $1.5 billion in projected toll revenue. Members asked what would happen if costs rise further; staff said the estimate includes substantial contingency, the project will use progressive design-build to manage risk, and the team will continue updating the finance plan annually.
A separate tolling and traffic-revenue presentation explained that four toll scenarios were analyzed using regional travel demand modeling, a toll diversion model, and a post-processing review. All scenarios assume pre-completion tolling beginning July 1, 2028, a 50% low-income discount for eligible users, and exemptions for tribal preemptions, emergency vehicles, maintenance vehicles, and organized militia. Staff said the low-income discount would affect about 4% to 6% of annual transactions and reduce annual revenues by roughly 2% to 3%. They said Scenario 2 was used for the financial analysis and is sufficient to support the $1.5 billion toll contribution in the funded phase. Members asked about toll collection costs, revenue impacts of the discount, and how the scenarios differed; staff said collection costs are expected to be in line with other WSDOT toll facilities, but exact costs are not yet set because toll rates are not final.
Finally, WSDOT staff outlined procurement and delivery steps for construction. They said WSDOT will be the lead contracting agency, using progressive design-build, with a request for qualifications targeted for early July 2026, a request for proposals in October, contractor selection in April 2027, construction starting in 2028, and tolling beginning in 2028. Staff said the approach is intended to consolidate scope, reduce interface risk, and allow transparent negotiation with an independent cost estimator, while preserving an off-ramp if a fair price cannot be reached. Members asked for more detail on timing, cost allocation, and the share of the first phase funded by tolls; staff estimated tolls account for about 26% of the first phase cost.
MA
Massachusetts 2025-2026 Regular Session
Joint Committee on Transportation Jun 21st, 2026 at 01:00 pm
Joint Committee on Transportation
Transcript Highlights:
- food deliveries by applying a 50-cent fee to transactions with third-party companies like Uber Eats,
- Ryan. 774 on third party delivery fees, followed by Chairman Creighton and Rep. Ryan.
- It would also reduce earnings for delivery drivers who rely on delivery work to make ends meet.
- Gregory Beeman, president of the Associated Builders and Contractors of Massachusetts.
- Our contractor members and employees are open shop, or non-union.
Committee:
Joint Joint Committee on Transportation
Summary:
The Joint Committee on Transportation heard testimony on a range of bills focused on transportation funding, governance, and equity. Supporters backed proposals to create a North Central Massachusetts intercity passenger rail fund tied to a possible new gaming license (H. 3680/S. 2363), local parking assessments (H. 3756), third-party delivery fees (S. 2356/H. 3774), broader roadway pricing and congestion management measures (S. 2353/S. 2354), tolling equity and regional transit authority advisory boards (S. 2400/S. 2401), and Steamship Authority oversight reforms including board term limits (S. 2395). Testimony in favor emphasized new dedicated revenue sources, commuter rail expansion, regional equity, improved oversight, and better transit access for riders and communities that rely on public transportation.
There was also testimony in opposition to the third-party delivery fee bills from Chamber of Progress, which argued the fee would raise costs for consumers, small businesses, and delivery workers, could reduce demand and jobs, and might not achieve the intended environmental benefits. Associated Builders and Contractors of Massachusetts opposed H. 3633, a transit expansion, electrification, and resiliency bill, specifically objecting to its mandatory project labor agreement requirement and saying it would limit competition and disadvantage non-union contractors and workers.
Several witnesses spoke in favor of the Steamship Authority bill, saying term limits would improve transparency, accountability, and board turnover. The committee also heard detailed support for the North Central rail proposal from a legislator, the North Central Massachusetts Chamber of Commerce, and a transportation advocate, who described the bill as a way to generate long-term bonded revenue for rail infrastructure. After testimony concluded and no questions remained, the chairs entertained and received a motion to adjourn.
LA
Transcript Highlights:
- Bill 638 by Representative Jacob Landry is an act in Title 9 relative to the prompt payment to contractors
- Bill 638 by Representative Jacob Landry is an act in Title 9 relative to the prompt payment to contractors
- It creates a chief operating officer position that better coordinates project delivery and day-to-day
Bills:
SR116 , SR117 , SR118 , SR119 , SCR68 , SCR69 , SCR12 , HB682 , HB766 , HB769 , HB775 , HB783 , HB824 , HB926 , HB1186 , HB1201 , HB1223 , HB1245 , HB1247 , HB1253 , HB1258 , HB221 , HCR53 , HCR62 , HCR72 , HCR58 , HB54 , HB137 , HB180 , HB192 , HB310 , HB321 , HB396 , HB512 , HB552 , HB578 , HB638 , HB663 , HB708 , HB717 , HB718 , HB1009 , HB1082 , HB1104 , HB1107 , HB1194 , HB1198 , HB1246 , HB1250 , SB29 , SB30 , SB32 , SB41 , SB42 , SB43 , SB47 , SB84 , SB93 , SB113 , SB192 , SB199 , SB219 , SB220 , SB221 , SB222 , SB241 , SB253 , SB255 , SB289 , SB292 , SB306 , SB314 , SB351 , SB399 , SB404 , SB14 , SB102 , SB133 , SB151 , SB165 , SB169 , SB170 , SB200 , SB217 , SB280 , SB291 , SB300 , SB303 , SB330 , SB449 , SB489 , SB521 , SB424 , SCR9 , SB25 , SB250 , SB348 , SB405 , SB444 , SB485 , SB35 , SB65 , SB132 , SB215 , SB246 , SB249 , SB269 , SB282 , SB296 , SB323 , SB363 , SB369 , SB474 , SB490 , SB492 , SB500 , HCR26 , HCR45 , HCR61 , HCR77 , HCR31 , HB649 , HB665 , HB681 , HB721 , HB746 , HB757 , HB781 , HB835 , HB844 , HB857 , HB872 , HB886 , HB889 , HB892 , HB982 , HB987 , HB1037 , HB1068 , HB1072 , HB1078 , HB1085 , HB1132 , HB1137 , HB1167 , HB1174 , HB1232 , HB1238 , HB23 , HB136 , HB17 , HB21 , HB51 , HB55 , HB74 , HB106 , HB108 , HB133 , HB140 , HB159 , HB168 , HB215 , HB226 , HB263 , HB296 , HB299 , HB322 , HB364 , HB519 , HB535 , HB538 , HB568 , HB571 , HB622 , HB635 , HB676 , HB772 , HB784 , HB1006 , HB1018 , HB1043 , HB1070 , HB1134 , HB1239 , HB62 , HB193 , HB203 , HB210 , HB220 , HB228 , HB246 , HB420 , HB475 , HB486 , HB574 , HB584 , HB750 , HB813 , HB815 , HB826 , HB870 , HB949 , HB953 , HB1045 , HB1092 , HB1151 , HB1162 , HB1176 , HB1177 , HB1196 , HB1214 , HB1241 , HB36 , HB73 , HB119 , HB126 , HB129 , HB166 , HB211 , HB245 , HB271 , HB280 , HB337 , HB351 , HB354 , HB399 , HB677 , HB712 , HB723 , HB726 , HB728 , HB759 , HB789 , HB850 , HB956 , HB966 , HB1036 , SB149 , SB382 , SB441 , HB258 , HB842
Keywords:
SR116, Senate Resolution 116, Louisiana Senate, condolences, memorial resolution, tribute, Tyler Marie Grezaffi, law enforcement, corrections officer, deputy sheriff, master sergeant, investigator, Louisiana State Penitentiary, Pointe Coupee Parish, Iberville Parish, public service, bereavement, sympathy, SR117, Senate Resolution 117
CA
California 2025-2026 Regular Session
Senate Budget and Fiscal Review Subcommittee No. 3 on Health and Human Services May 21st, 2026
Transcript Highlights:
- when we have identified that a contractor has under-earned for multiple years, we work with the contractor
- And then maximizing how relinquished funds can be reallocated to other contractors, including contractors
- This would include reviewing individual contractors' progress and notifying contractors what award amounts
- Each contractor maintains their own wait lists.
- system to the Medi-Cal fee-for-service delivery system.
CA
California 2025-2026 Regular Session
Senate Budget and Fiscal Review Subcommittee No. 3 on Health and Human Services May 21st, 2026
Transcript Highlights:
- when we have identified that a contractor has under-earned for multiple years, we work with the contractor
- And then maximizing how relinquished funds can be reallocated to other contractors, including contractors
- This would include reviewing individual contractors' progress and notifying contractors what award amounts
- Each contractor maintains their own wait lists.
- and timely for the contractors.
Summary:
The committee first heard May Revision child care and human services items. The Department of Child Support Services described two technical adjustments, which the analyst supported. The Department of Social Services then walked through child care proposals, including a reduction in federal and Proposition 64 funding absorbed through a shift from General Child Care to the Alternative Payment program, a 2.01% child care COLA, disaster-related infrastructure grants, a new administrative support cost structure for Alternative Payment agencies, the removal of prospective pay funding after a federal rule change, a reappropriation for existing infrastructure grants, and estimates of unspent child care funds. The Legislative Analyst’s Office recommended asking for more justification for shifting reductions to CAP, supported the COLA reduction but wanted consistency across programs, recommended removing prospective pay funding, opposed the administrative cost shift, and suggested further review of disaster grant alignment. Members pressed the administration on why more slots would be cut for the same savings, why the COLA was reduced, and whether the administrative percentage would grow over time. The administration said the changes were intended to avoid disrupting currently enrolled families, reflect point-in-time relinquishments and unspent funds, and stabilize contractor operations. Public commenters, including providers, advocates, and county representatives, urged full COLA funding, rejection of child care slot reductions, preservation of prospective pay, and continued investment in child care infrastructure and access. The subcommittee then recessed before moving to health items.
In Part B, the Department of State Hospitals presented its May Revision proposals, including a central utility plant replacement project at Metropolitan State Hospital, funding for a continuum electronic health record system, reduced county bed billing authority to reflect phase-in of additional LPS beds, limited contract exemption authority for online clinical subscription services, reversion of prior-year unspent operating funds, and a workforce development proposal to use Behavioral Health Services Act funds instead of General Fund for training programs. The department said the EHR would modernize records and improve continuity of care, and that the contract exemption would prevent delays in essential clinical information services. No votes were taken in the excerpt provided.
WA
Washington 2025-2026 Regular Session
Joint Oregon-Washington Legislative Action Committee Jun 12th, 2026 at 01:00 pm
Joint Oregon-Washington Legislative Action Committee
Transcript Highlights:
- So the team is transitioning from a planning phase to a delivery phase.
- The design-build team consists of a designer and the contractor.
- I think we see the same thing on the contractors and the designer side.
- And notably, this transition to construction delivery.
- rather than dealing with small contractors.
TX
Transcript Highlights:
- Design-build can be a proven option for project delivery.
- Simply put, it's not a delivery method that is being overutilized.
- Some of these same contractors do the design-build work, but you have different contractors so these
- It's the most used delivery method in America.
- Design-bid-build is... the riskiest delivery method.
Committee:
House Transportation
Keywords:
transportation, TxDOT, Texas Department of Transportation, road projects, highways, infrastructure, bridge construction, interchanges, corridor improvements, road widening, railroad grade separation, sound barrier, unified transportation program, legislative notice, project prioritization, capital projects, state highway system, Farm-to-Market Roads, San Antonio, Harris County
OK
Oklahoma 2026 Regular Session
Senate Legislative Session Mar 26th, 2026 at 12:10 pm
Oklahoma Senate Floor Meeting
Transcript Highlights:
- You have independent contractors and subcontractors, which this is not going to impact.
- So, could you please direct me to where it talks about the independent contractors?
- It also defines what exemptions for independent contractors are.
- Could you please direct me to where it talks about the independent contractors?
- It just kind of describes what independent contractors are. Follow up.
Bills:
SB65 , SB248 , SB330 , SB378 , SB844 , SB1330 , SB1410 , SB1475 , SB1476 , SB1565 , SB1618 , SB1623 , SJR39 , SJR47 , SB2084 , SB1655 , SB1679 , SB2174 , SB1775 , SB1873 , SB1204 , SB1884 , SB1916 , SB1937 , SB1447 , SB1500 , SB2007 , SB2074 , SB1944 , SB2018 , SB1984 , SB2026 , SB2045 , SB2049 , SB2062 , SB2112 , SB2118 , SB2127 , SB2134 , SB2135 , SB2139 , SB2154 , SB1195
Keywords:
SB65, naloxone, Narcan, opioid overdose, overdose reversal, opioid antagonist, emergency opioid antagonist, substance abuse services, harm reduction, public health, overdose prevention, good samaritan, civil immunity, criminal immunity, controlled substances, addiction treatment, fentanyl, opioid crisis, school overdose response, first aid
OK
Oklahoma 2026 Regular Session
Senate Legislative Session Mar 26th, 2026 at 08:30 am
Oklahoma Senate Floor Meeting
Bills:
SB65 , SB248 , SB330 , SB378 , SB844 , SB1330 , SB1410 , SB1475 , SB1476 , SB1565 , SB1618 , SB1623 , SJR39 , SJR47 , SB2084 , SB1655 , SB1679 , SB2174 , SB1775 , SB1873 , SB1204 , SB1884 , SB1916 , SB1937 , SB1447 , SB1500 , SB2007 , SB2074 , SB1944 , SB2018 , SB1984 , SB2026 , SB2045 , SB2049 , SB2062 , SB2112 , SB2118 , SB2127 , SB2134 , SB2135 , SB2139 , SB2154 , SB1195
Keywords:
SB65, naloxone, Narcan, opioid overdose, overdose reversal, opioid antagonist, emergency opioid antagonist, substance abuse services, harm reduction, public health, overdose prevention, good samaritan, civil immunity, criminal immunity, controlled substances, addiction treatment, fentanyl, opioid crisis, school overdose response, first aid
CA
California 2025-2026 Regular Session
Senate Education Committee Jun 3rd, 2026
Transcript Highlights:
- for both our school districts and for our contractors.
- So contractors can responsibly bid, plan, and deliver projects without fear that the delivery method
- Contractors as a whole, we really do support alternative delivery methods because it does help us in
- and workers from our state, the majority of contractors in our state.
- When it comes to the contractors themselves, a couple of questions.
Summary:
The committee first heard AB 402, which would increase Cal Grant award amounts for students attending private nonprofit colleges and extend transfer entitlement eligibility to those institutions. The author and supporters argued the bill would improve affordability and access for low- and middle-income, working, military, and transfer students, while some senators emphasized the need to pair any increase with broader Cal Grant reform and funding. The bill drew support from private nonprofit universities, community college districts, and student advocates, and no opposition was presented. It passed on a due pass motion to Senate Appropriations and was placed on call.
The committee then took up AB 2067, a sunset extension for the competitive lease-lease-back process for TK-12 school construction through July 1, 2032. Supporters from school facilities groups, school districts, and contractors said the method provides flexibility, early contractor involvement, cost control, and legal certainty for school construction projects. Some senators questioned how often the method is used and raised concerns about the bill’s skilled-and-trained workforce provisions, with one senator opposing on the grounds that such requirements limit contractor participation. The bill passed on a due pass motion and was placed on call.
Next, AB 1204 proposed changes to the Local Control Funding Formula, including a lower concentration-grant threshold, regional cost adjustments, a minimum annual COLA, and other equity-focused revisions. Supporters said the bill would better reflect regional costs and student need, while opponents—especially several school district leaders—argued it would shift money away from the base grant, widen disparities, and create new fiscal cliffs. Committee members raised concerns about the scale of the rewrite, the lack of a broader funding strategy, and the proposed 4% COLA guarantee, though the author said the bill was intended as a phased update to improve equity. The bill was supported by the chair and several members, then passed on a due pass motion to Appropriations and was placed on call.
Finally, the committee heard AB 1235, which would require a skilled-and-trained workforce process for CSU design-build projects. Supporters said it would align CSU with other segments and promote quality training, while opposition from contractor groups argued it would add liability, reduce competition, and increase costs without evidence of better outcomes. Senators again focused on the effect of skilled-and-trained requirements on contractor participation, with one member stating opposition to limiting who can work in California and another noting the bill’s broader policy implications. The transcript ends during committee discussion of AB 1235, without a recorded final vote.
NE
Nebraska 2025-2026 Regular Session
Legislative Morning Session Apr 7th, 2026
Nebraska Unicameral Floor Meeting
Transcript Highlights:
- Why are we independent contractors?
- It was as an independent contractor.
- It doesn't interrupt your independent contractor status.
- We are also independent contractors.
- We are also independent contractors.
Bills:
LB815A , LB838A , LB912A , LB972A , LB1126A , LB962A , LB1114 , LB921 , LB937 , LB803 , LB803A , LB1032 , LB1032A , LB1075 , LB1075A , LB889 , LB878 , LB933 , LB304 , LB304A , LB1096 , LB1096A , LB1165 , LB1165A , LB958 , LB958A , LB762 , LB1187 , LB966 , LB929 , LB962 , LB753 , LB788 , LB913 , LB1055 , LB1195 , LB429 , LB721 , LB722 , LB727 , LB743 , LB745 , LB749 , LB778 , LB787
AL
Alabama 2026 Regular Session
Alabama House Ways and Means General Fund Committee Mar 31st, 2026
Ways and Means General Fund
Bills:
SB146 , SB143 , SB144 , SB145 , HB224 , SB152 , SB153 , SB154 , SB162 , SB226 , SB146 , SB143 , SB144 , SB145 , HB224 , SB152 , SB153 , SB154 , SB162 , SB226
Committee:
House Ways and Means General Fund
Keywords:
supplemental appropriation, FY2025 budget, general fund, Alabama State Board of Public Accountancy, Unified Judicial System, court automation, advanced technology and data exchange, judiciary funding, transportation debt service, highway bonds, bridge bonds, Alabama Department of Transportation, ALDOT, public highways, federal matching funds, state appropriations, bond principal and interest, special funds, budget amendment, SB143
LA
Louisiana 2026 Regular Session
Transportation, Highways and Public Works May 26th, 2026
Transcript Highlights:
- Of the Associated Builders and Contractors or his designee as members of the C-MAR task force.
- Change orders, first of all, are pretty expensive for contractors to actually undergo.
- bring in another contractor.
- I am Relda Owens, Louisiana Associated General Contractors.
- Currently, a contractor is the master of their own destiny.
Summary:
The House Transportation Committee met on May 26 and considered several resolutions and one Senate bill dealing with transportation project delivery, vehicle safety, school-zone safety, flooding, and highway signage. The committee first took up SCR 64, which creates a task force to study construction management at risk (CMAR) for public works. An amendment added representatives from Louisiana Associated General Contractors and Associated Builders and Contractors to the task force, and the resolution was reported with amendments. The committee also heard HR 282, which creates a task force to study utility terrain vehicles with Louisiana State Police and other stakeholders; an amendment added the State Fire Marshal, and the resolution was reported with amendments.
The most extensive discussion centered on SB 513, which addressed public works project delivery methods and included a proposal for an average-bid award method as well as design-build authority for airports and vertiports. Testimony from a Reason Foundation policy analyst and a Louisiana Associated General Contractors representative opposed the average-bid concept, arguing it lacked U.S. precedent, could encourage collusion, and could raise costs, while airport-related design-build provisions were supported. The committee adopted an amendment in concept to remove the average-bid language, then reported SB 513 with amendments by a vote of 11 yeas and 4 nays.
The committee also reported SCR 62 favorably, which urges DOTD to evaluate all school zones on state highways in response to safety concerns and near misses involving crossing guards and distracted driving. In addition, HCR 112 was reported favorably to study flooding on Louisiana Highway 1 in Shreveport, and HR 275 was reported favorably to study an interstate highway signage maintenance and reporting program. The meeting concluded after all items were acted on and the committee adjourned.
CA
California 2025-2026 Regular Session
Joint Hearing Budget Subcommittee No. 2 on Human Services and Budget Subcommittee No. 3 on Education Finance Apr 8th, 2026
Transcript Highlights:
- Additionally, many of our CSPP Many of our CSPP contractors are already fully enrolled, but some contractors
- It's been a popular idea among contractors.
- It supports the vast majority of state preschool contractors, and those contractors are supporting around
- It supports the vast majority of state preschool contractors, and those contractors are supporting around
- In a mixed delivery system, our forms of child care play an important role.