Video & Transcript Research : 'storm surge'

Page 12 of 214
TX
Transcript Highlights:
  • As populations continue to surge and the state has a vibrant economy, the bridges, roads, and airports
  • Winter events like 2021, Winter Storm Yuri and Viola.
NH

New Hampshire 2025 Regular Session

Senate Finance (01/14/2025)

Finance

Transcript Highlights:
  • will be spent maintaining the proposed new bridges and walkways, or picking up trash and cleaning storm
  • 00:41:35.079><c> trash</c><00:41:35.960><c> and</c><00:41:36.119><c> cleaning</c><00:41:36.560><c> storm
  • </c> picking up trash and cleaning storm picking up trash and cleaning storm debris<00:41:37.960><c>
  • The surging market in residential property values is really creating a hardship for single-, two-, and
  • </c><01:00:56.520><c> Market</c><01:00:56.880><c> in</c><01:00:57.039><c> residential</c> the surging
Keywords: 1191, senate, all
MA

Massachusetts 2025-2026 Regular Session

Formal House Session 19 Jun 21st, 2026 at 11:00 am

Massachusetts House Floor Meeting

Transcript Highlights:
  • The fact is the average residential electric rate in our Commonwealth has surged by 41% since 2020.
  • I'm sorry to hear the issues in Western and Central Mass with propane deliveries in this storm.
  • For many customers, this predictability will help their checking account weather the winter storms and
Keywords: 995, all
Summary: The House opened with the Pledge of Allegiance and then took up several procedural matters, including adopting a resolution recognizing the work of Ukraine Forward and suspending Joint Rule 12 for a number of petitions. The chamber also scheduled several bills for later consideration, including measures on unemployment insurance for fluctuating work schedules, the Medical Society mission statement, a youth training wage, bridge and intersection namings, handicapped parking fines, public-way safety, excavation restoration, motor vehicle safety, and a Newton police age requirement. Two engrossed local bills were passed to be enacted: one authorizing retired police officers as special police in Plainville and another allowing Orange to increase its Board of Selectmen membership. The main policy debate centered on House No. 5151, An Act relative to energy affordability, clean power, and economic competitiveness. Supporters described it as a broad affordability and clean-energy package that would cut costs for ratepayers, reform Mass Save, speed clean-energy procurement and interconnection, return a portion of alternative compliance payments to customers, and address biomass and other energy issues. Opponents argued the bill relied too heavily on long-term programs and new administrative structures while offering little immediate relief, and raised concerns about costs being shifted to consumers, impacts on natural gas, and the pace of implementation. Several amendments were debated and rejected, including proposals to shift public benefit charges away from peak hours, pause public benefit charges for a year, require greater utility disclosure before rate increases, and add a forest-clearing penalty for solar development. One amendment to the energy bill was adopted: a consolidated amendment that included budget-billing consumer protections for gas customers, requiring notice and conservation recommendations when usage rises significantly. The House also adopted an amendment to a separate conservation-restriction bill for Hanson, changing a figure in the underlying law, and passed that bill to be engrossed as amended. The energy bill’s consolidated amendment passed by roll call, while several other amendments failed by roll call votes. The House observed multiple moments of silence honoring Jaden Booker, Thomas Skip Karam, former Freetown Police Chief Carlton Abbott, and former Representative and Senator William Q. “Biff” McLean, Jr.
TX
Transcript Highlights:
  • This was a storm unlike anything seen in our county before.
  • We experienced the storm and the flood.
  • Even in that case, the storm has already formed.
  • During major storm events, every minute counts.
  • I've seen some interesting technology looking at storm surges where you basically can do a three-dimensional
Summary: The joint Senate and House disaster preparedness hearing convened in Kerrville with quorum, public testimony limited to three minutes and invited testimony to 10 minutes. Leaders from both chambers, along with the lieutenant governor and speaker, framed the hearing as an unprecedented joint effort focused on learning from the July 4 flood, honoring victims, and identifying actions to reduce future loss of life. The committee also heard opening remarks about decorum, logistics, and the intent to continue work in future sessions. The first panel included Kerr County Judge Rob Kelly, Sheriff Larry Leitha, Emergency Management Coordinator William B. Thomas IV, Kerrville Mayor Joe Herring Jr., Kerrville City Manager Dalton Rice, Upper Guadalupe River Authority representative William Rector, Kendall County Judge Shane Stolarczyk, and Real County Judge Bella Rubio. They described the flood as sudden and catastrophic, with Kerr County reporting 108 deaths and two missing. Local officials emphasized that they received no timely warning of the scale of the event, that responders and volunteers acted heroically under extreme conditions, and that communications, cell coverage, and rural emergency resources were strained. Several witnesses said the county’s existing alert systems were limited by geography, sparse broadband, and the speed of the flood. Testimony focused on possible improvements, including real-time flood gauges and predictive monitoring, stronger rural emergency management staffing and training, better interoperability and alerting tools such as IPAWS, CodeRED, WENS, and sirens, and expanded broadband and radio coverage. Kerrville asked for a flood warning system before next summer and state help for stormwater, floodplain, and disaster recovery funding. UGRA described its past and current flood-warning and mitigation efforts, including gauge funding, a new software-based flood prediction project, and consideration of additional retention dams. Kendall and Real counties highlighted successful or needed alerting and evacuation practices, while also stressing the difficulty of funding and maintaining such systems in small rural counties. Members asked detailed questions about the timeline of the flood response, low-water crossings, communications failures, sirens, bridges, and whether regional consolidation or additional infrastructure could improve future preparedness.
LA

Louisiana 2026 Regular Session

CPRA Jan 21st, 2026

Transcript Highlights:
  • If you look, it's a buffer for the storm surge from White Lake, which is on the southern end, all right
  • So this is what it looked like immediately after the storm. Prior to the storm.
  • And then this is another look at what this looked like immediately after the storm.
  • in like February of 2022, a few months after the storm.
  • I won't say the shoreline was fairly stable in advance of the storm, correct? Olivia.
Keywords: 965, house, all
Summary: The board met at the State Capitol and approved the agenda and prior minutes after brief motions and no public comment. Executive Director Michael Hare then gave a CPRA implementation update, describing a large portfolio of active projects and highlighting several that are under construction, nearing bid, or recently awarded, including Port Fourchon shoreline protection, Caernarvon marsh creation, Schooner Bayou saltwater barrier rehabilitation, Cain Bayou marsh creation, West Shore river reintroduction work, Morganza to the Gulf, Raccoon Island restoration, Chenier-O-Tig ridge restoration, Bayou Pigeon and Dismal Swamp boat launches, Grand Bayou marsh creation, Highway 1 terracing, and several National Coastal Resilience Fund projects. He also noted the annual plan public meetings had concluded, with comments accepted through February 17, 2026, and answered board questions about the Rockefeller shoreline project, saying CPRA and the Corps were working through geotechnical and environmental issues and trying to move it forward. The board then received a joint presentation from CPRA and the Louisiana Department of Wildlife and Fisheries on the White Lake Conservation Area and Management Plan. Speakers described White Lake as a 72,000-acre property in Vermilion Parish with major freshwater marsh, wildlife habitat, hunting and fishing opportunities, and aging infrastructure that currently operates on limited self-generated revenue. The plan, finalized in October 2025, focuses on habitat protection, maintaining wildlife, supporting revenue generation, expanding controlled public access, and strengthening partnerships. Proposed priorities include GIWW shoreline protection, Unit 2/Caddo levee stabilization, and north shoreline protection, with about $30 million secured for engineering and design and total costs estimated around $120 million to $130 million. Officials also discussed a possible lodge revitalization funded only with private dollars, broader landscape-level habitat management, conservation incentives for private landowners, and potential land acquisition for additional public access. Board members and agency leaders emphasized the importance of White Lake to waterfowl habitat and public recreation, and one member urged similar management attention for Sabine, Lacassine, and Cameron Prairie refuges. The final major presentation covered CPRA’s marsh creation design guidelines. Staff explained that marsh creation remains a major share of the coastal master plan and current project pipeline, and reviewed how projects are built using dredged sediment, containment dikes, and pipeline systems. They said the 2017 design guidelines were intended to standardize minimum design and construction practices, but are now being updated to reflect lessons learned, current survey standards, geotechnical practices, construction methods, and issues such as oil and gas infrastructure and land rights coordination. Board members asked about reducing unnecessary geotechnical costs, improving land-rights timing, considering unconfined marsh creation where appropriate, and accounting for why marsh areas are failing in the first place. Staff said they would consider those suggestions as part of the guideline update and then moved into a follow-up presentation on safety, access, and logistics for marine construction in the coastal zone.
LA

Louisiana 2026 Regular Session

CPRA Jan 21st, 2026

Transcript Highlights:
  • If you look, it's a buffer for the storm surge from White Lake, which is on the southern end, all right
  • So this is what it looked like immediately after the storm. Prior to the storm.
  • And then this is another look at what this looked like immediately after the storm.
  • in like February of 2022, a few months after the storm.
  • I won’t say the shoreline was fairly stable in advance of the storm, correct? Olivia.
Summary: The board met on January 21, 2026, approved the agenda and minutes, and received a CPRA implementation update from Executive Director Michael Hare. Hare reported about 103 active projects, with work focused on completing existing projects and moving more into construction. He highlighted several projects, including Port Fourchon shoreline protection, Northwest Little Lake marsh creation, Sugar Ridge Pump Station, a large RESTORE-funded marsh creation project, Schooner Bayou saltwater barrier rehabilitation, Cain Bayou marsh creation redesign, West Shore river reintroduction work, Morganza to the Gulf reaches, NERDA Raccoon Island restoration, and Chenier-O-Tig ridge restoration. He also reviewed recreation and partnership projects such as Bayou Pigeon and Destrehan boat launches, Grand Bayou Marsh Creation, Highway 1 terracing, and four Louisiana projects funded through the National Coastal Resilience Fund. Hare noted the annual plan public meetings were complete and the comment period remained open through February 17, 2026. Board members asked about the Rockefeller shoreline project, and Hare said the Corps and state agencies were working through geotechnical and environmental issues and that leadership remained committed to moving it forward. The board then heard a joint presentation from CPRA and the Louisiana Department of Wildlife and Fisheries on the White Lake Conservation Area and Management Plan. Officials described White Lake as a 72,000-acre property in Vermilion Parish with major habitat, recreation, and revenue functions, but said aging infrastructure, levee erosion, limited water control structures, and maintenance costs made a master plan necessary. The plan, finalized in October 2025, recommends coastal restoration projects, lodge and facility revitalization using private dollars, revenue-generation improvements, and long-term partnerships. Proposed work includes GIWW shoreline protection, Unit 2/Caddo levee stabilization, and north shoreline protection, with about $30 million already secured for engineering and construction and total needs estimated at roughly $120 million to $130 million. Officials also discussed broader habitat management, conservation incentives for private landowners, possible land acquisition in southwest Louisiana, and coordination with federal partners and other state agencies. Members praised the White Lake effort as a model of interagency collaboration and emphasized its importance for waterfowl habitat, public access, and tourism. Questions focused on funding sources, oil and gas revenue, and whether other agencies such as economic development and tourism should be involved. Several members also urged the state to apply similar management approaches to other refuges, including Sabine, Cameron Prairie, and Lacassine, where they said federal management has lagged. The discussion underscored a broader shift toward landscape-scale habitat management and public recreation investment. The final major presentation covered CPRA’s marsh creation design guidelines and related construction logistics. Staff explained that marsh creation makes up a large share of the coastal master plan and that the agency is updating its 2017 design guidelines after nearly a decade of use. The updates will address survey standards, geotechnical methods, dredge production estimates, construction monitoring, and oil and gas infrastructure conflicts. A second presentation reviewed safety, access, and logistics for marine construction, including equipment access routes, pipeline identification and coordination, cultural resources, private landowners, oyster resources, and permitting. Board members asked about reducing geotechnical costs, improving land-rights coordination, considering uncontained marsh creation where appropriate, and managing pipeline impacts; staff said they would consider those suggestions as part of the guideline updates.
FL

Florida 2025 Regular Session

House in Session May 2nd, 2025

Florida House Floor Meeting

Transcript Highlights:
  • Installs storm windows, remove the provision those cannot be considered as an improvement.
  • Many of us had districts that were devastated over the past summer by storms that were unimaginable.
  • She showed me where she had to crawl on top of furniture to survive the six-foot storm surge.
  • You lived through these storms.
  • Which I didn't think was possible so far away from the storm.
Bills: HJR 138, HB 42, HB 104, HB 129, HB 677, HB 426, HB 668, HB 1699, HB 2017, HB 2128, HB 2038, HB 3783, HB 3717, HB 2316, HB 3686, HB 2563, HB 3883, HB 4021, HB 2788, HB 2663, HB 3305, HB 3173, HB 3474, HB 1105, HB 3531, HB 3490, HB 3597, HB 1295, HB 3512, HB 3010, HB 3112, HB 4215, HB 3223, HB 3464, HB 3120, HB 4214, HB 4511, HB 3704, HB 4081, HB 4783, HB 4063, HB 2783, HB 4937, HB 5085, HB 2510, HB 3426, HB 4361, HB 1169, HB 2516, HB 2347, HB 4034, HB 4700, HB 3560, HB 5150, HB 3860, HB 3146, HB 3924, HCR 98, HCR 92, HB 1520, HB 1545, HB 5265, HB 1887, HB 1914, HB 2402, HB 2306, HB 2350, HB 3000, HB 3237, HB 3326, HB 3211, HB 1056, HB 2081, HB 2187, HB 3092, HB 3308, HB 3526, HB 3750, HB 4219, HB 4230, HB 4290, HB 5238, HB 4804, HB 4749, HB 245, HB 1465, HB 294, HB 793, HB 809, HB 3928, HB 334, HB 2037, HB 1973, HB 285, HB 4341, HB 1043, HB 1234, HB 1193, HB 1729, HB 2498, HB 1314, HB 1353, HB 3960, HB 3923, HB 2221, HB 2517, HB 2518, HB 2213, HB 5092, HB 3748, HB 5246, HB 4344, HB 1482, HB 4044, HB 2702, HB 4264, HB 2807, HB 2898, HB 3181, HB 3250, HB 2091, HB 2115, HB 2542, HB 2768, HB 3349, HB 4406, HB 1593, HB 1899, HB 3133, HB 3133, HB 4960, HB 3214, HB 2145, HB 1201, HB 5061, SB 29, SB 879, SB 65, SB 1745, SB 412, SB 412, SB 1746, SB 1238, SB 1341, SB 522, SB 1532, SB 1378, SB 1062, SB 2066, SB 1963, SB 2204, SB 1366, SB 2077, SB 1967, SB 1151, HB 1618, HB 2156, HB 2615, HB 2615, HB 2349, HB 1926, HB 569, HB 1762, HB 38, HJR 138, HB 42, HB 104, HB 104, HB 129, HB 677, HB 426, HB 668, HB 1699, HB 2017, HB 2128, HB 2038, HB 3783, HB 3717, HB 2316, HB 3686, HB 2563, HB 3883, HB 4021, HB 2788, HB 2663, HB 2663, HB 3305, HB 3173, HB 3474, HB 1105, HB 3531, HB 3531, HB 3490, HB 3490, HB 3597, HB 1295, HB 3512, HB 3010, HB 3112, HB 4215, HB 3223, HB 3223, HB 3464, HB 3120, HB 4214, HB 4511, HB 3704, HB 4081, HB 4783, HB 4063, HB 2783, HB 4937, HB 5085, HB 2510, HB 3426, HB 4361, HB 1169, HB 2516, HB 2347, HB 4034, HB 4700, HB 3560, HB 5150, HB 3860, HB 3146, HB 3924, HCR 98, HCR 92
TX

Texas 89th Regular

Water, Agriculture, and Rural Affairs May 19th, 2025

Water, Agriculture and Rural Affairs

Transcript Highlights:
  • skyrocketing input costs, low commodity prices, and the loss of agricultural land has created a perfect storm
  • skyrocketing input costs, low commodity prices, and the loss of agriculture land has created a perfect storm
  • agriculture has endured a relentless series of disasters: droughts, floods, hurricanes, and severe storms
  • At the same time, the cost of essentials like feed, fertilizer, and fuel has surged.
Summary: The Senate Committee on Water, Agriculture, and Rural Affairs met with only four members initially present, so quorum was not established until later in the hearing. The committee heard several agriculture-, wildlife-, and food-labeling-related bills, including HB 3479 on expanding the Rio Grande vegetative management program beyond carrizo cane to other noxious vegetation, SB 823 on shrimp origin labeling and restrictions on misrepresenting imported shrimp as Texas or Gulf shrimp, HB 3088 on giving Texas Parks and Wildlife more flexibility to procure resale goods for park gift shops, HB 1275 on permits for non-bovine dairy farms in certain TB-affected areas, HB 519 on honey production and packaging rules, HB 609 on cleaning oyster cages in-bay with bay water only, HB 1592 on a voluntary AgriLife pest and disease alert system, HB 2842 on targeted urban deer depredation permits, and HB 4163 on limiting city requirements that agricultural operators maintain roadside rights-of-way. Testimony generally came from industry groups, agency resource witnesses, and affected producers, with most witnesses supporting the bills and several bills drawing questions about enforcement, labeling responsibility, and the scope of local authority. The most extensive discussion centered on SB 823, where Vice Chair Hancock and others questioned why wholesalers would be covered if they cannot relabel products. The bill author and restaurant association witness said the measure was intended to improve transparency and allow enforcement against intentional mislabeling, while preserving a good-faith defense and clarifying that the bill does not create a private cause of action. HB 519 also drew supportive testimony from beekeepers and a family farm, who argued that current rules treat honey extraction and bottling too much like food manufacturing and burden small operations. HB 609 was presented as a way to save time and resources for cultivated oyster mariculture by allowing cage cleaning in the bay without soaps or chemicals, and HB 1592 was described as a voluntary opt-in alert system for pests and diseases coordinated through AgriLife and other state agencies. HB 43 generated the most detailed policy debate. The bill would restructure and expand the Texas Agricultural Finance Authority, update grant and loan programs, and create a pest and disease control depredation program. The committee substitute reduced some funding caps, changed references from predators to depredating animals, and made the financial provisions contingent on appropriations. Supporters from Texas Farm Bureau, cotton growers, grain and feed interests, and young farmers described severe drought, inflation, land loss, rising input costs, and shrinking infrastructure as major threats to agriculture, while one witness urged preserving priority for young farmers. After testimony, the committee adopted the committee substitute and reported HB 43 favorably. The committee also voted HB 519, HB 609, HB 1275, HB 1592, HB 3088, HB 3479, HB 2842, and HB 4163 favorably, with several recommended for the local and uncontested calendar. SB 823 was reported from committee on a 6-2 vote after adoption of the committee substitute. The meeting ended with notice that the committee would tentatively reconvene Friday morning and then recessed subject to the chair's call.
MA

Massachusetts 2025-2026 Regular Session

Joint Committee on Environment and Natural Resources Jun 21st, 2026 at 01:00 pm

Joint Committee on Environment and Natural Resources

Transcript Highlights:
  • These are events where, with a very heavy storm, the combined sewer and stormwater systems discharge
  • .cheap, but it's a way to hold in the stormwater during storms.
  • This only applies to the MWRA sewer service area and would require 25-year storm level of control.
  • This only applies to the MWRA sewer service area and would require 25-year storm level of control.
  • On its east, excuse me... ...into the brook during storms. Four of the CSOs belong to Cambridge.
Keywords: 995, all
Summary: The Joint Committee on Environment and Natural Resources held a hybrid hearing with testimony on a range of environmental bills. Early testimony focused on H. 1018, which would update management of the Commonwealth’s water resources and limit new conditions on historic water registrations. Water officials from Wellesley and the Springfield Water and Sewer Commission supported the bill, arguing that drought-related restrictions on registered withdrawals are difficult to administer, create customer confusion, and can undermine utility revenue needed for infrastructure upgrades. A Massachusetts Waterworks Association representative also backed the bill, saying registered systems have long operated within their allocations and should not have those withdrawals conditioned by regulation. A major portion of the hearing centered on H. 1040, which would ban tire-derived materials on playgrounds and playing fields. The bill’s petitioner, environmental advocates, and an environmental chemist testified that crumb rubber and other tire-derived infill can release chemicals into soil and water and may pose risks to aquatic life and public health. Committee members asked about alternatives and costs; witnesses said natural grass and some organic infills are available, though more research is needed on some substitutes. Rep. Schwartz also testified on CSO-related bills, describing combined sewer overflows as a public health and environmental problem and saying the bills set deadlines but leave implementation methods to local and regional officials. Rep. Chacolo supported H. 909, a grant program for low-noise, low-emission landscape equipment, citing worker health, noise, and emissions concerns, and Sen. Cyr testified for bills addressing coastal and environmental acidification and nutrient pollution. The hearing also included extensive testimony on H. 4040, which would prevent discharge of radioactive materials from the Pilgrim decommissioning process. Speakers including a Sierra Club representative, a physician, and the Massachusetts Lobstermen’s Association opposed Holtec’s plan to dispose of radioactive wastewater through evaporation or discharge, citing public health, transparency, and economic risks to fisheries and coastal communities. Another large block of testimony addressed CSO legislation, especially H. 1046 and related bills for the MWRA service area. Environmental groups, residents, and river users described sewage overflows into the Charles, Mystic, and Alewife Brook, impacts on health and recreation, and the need for a timeline to eliminate or sharply reduce overflows. Industry representatives opposed the CSO and waste bills, arguing they would be costly, duplicative, and disruptive, while waste facility operators said they already use continuous emissions monitoring and comply with existing regulations. No votes were taken during the hearing.
MA

Massachusetts 2025-2026 Regular Session

Joint Committee on Ways and Means Jun 21st, 2026 at 12:00 pm

Joint Committee on Ways and Means

Transcript Highlights:
  • ensuring that the Commonwealth is well positioned to navigate the uncertain road ahead and weather the storms
  • We saw a huge surge in the state's labor force last year, almost entirely attributable to immigration
  • . ...a huge surge in the state's labor force last year, almost entirely attributable to immigration,
  • They surge 20.3% in fiscal year 26, but the liability is reflected in tax revenues mainly in fiscal year
Keywords: 995, all
Summary: The Senate and House Ways and Means chairs opened the FY 2027 consensus revenue hearing by emphasizing the need for a balanced, fiscally responsible budget amid federal funding cuts, health care cost pressures, and uncertainty around the federal tax law changes referred to as OB3. They also noted the state’s current revenue performance is slightly above benchmark and paid tribute to the late Representative Anne Margaret Ferranti. Secretary of Administration and Finance Matthew Gorkowitz echoed the call for caution, saying Massachusetts has protected core services while building reserves and that the FY27 budget process begins with a careful revenue estimate. Department of Revenue Commissioner Jeff Snyder, along with DOR staff, presented FY26 and FY27 tax forecasts and identified major drivers and risks: OB3’s negative impact on state revenue, surtax collections, labor market conditions, capital gains, and corporate/business excise taxes. DOR estimated OB3 would reduce FY26 revenue by about $664 million and FY27 by about $282 million, while surtax and capital gains were expected to remain strong in FY26 but soften in FY27. Members questioned the outlook for surtax, capital gains, and the potential fiscal effect of a ballot question reducing the income tax rate from 5% to 4%; DOR said that proposal could cost roughly $4.2 billion to $4.8 billion annually, with a smaller but still significant impact in FY27 because of phase-in timing. Treasurer Deb Goldberg testified next on the stabilization fund, lottery, PRIM, unclaimed property, and the Alcoholic Beverages Control Commission. She reported the rainy day fund at about $8.1 billion, said the lottery was on track for $1.5 billion in FY26 net profit and projected $1.25 billion in FY27, and highlighted that iLottery is expected to launch in summer 2026 with revenue beginning in FY27 and dedicated to child care initiatives. She also described strong PRIM performance and record unclaimed property returns, while members asked about the child care use of iLottery revenue, multilingual outreach, and the economic impact of expanded liquor licensing. Mass Taxpayers Foundation President Doug Howgate and Tufts’ Evan Horowitz then offered differing revenue outlooks and policy warnings. Howgate projected modest growth, cautioned against overusing reserves for ongoing obligations, and urged caution on federal tax conformity changes and health care spending pressures. Horowitz projected higher FY26 and FY27 revenues than other witnesses, warned that the surtax and capital gains make the tax system more volatile, and said a 4% income tax ballot question could reduce FY27 revenues by roughly $800 million to $1 billion. He also flagged the rent control ballot question as a potential risk to municipal finance and suggested the state consider giving a permanent home to the independent revenue model used by Alan Clayton-Matthews.
TX
Transcript Highlights:
  • How effective would they be in a storm?
  • You've got a late night storm.
  • During major storm events. Every minute counts.
  • talked about on this storm that we just had?
  • I've seen some interesting technology looking at storm surges, where you basically can do a three-dimensional
Keywords: 1185, senate, all
US

US Federal 2025-2026 Regular Session

US House Floor Proceedings (Thursday, June 25, 2026)

US Federal House Floor Meeting

Transcript Highlights:
  • On June 14th, there was a storm surge for the ages.
  • demonstrated by his leadership in recent years through the challenges of the pandemic and during devastating storms
WA

Washington 2025-2026 Regular Session

Senate Transportation Jan 20th, 2026 at 04:00 pm

Transportation

Transcript Highlights:
  • And investments in this infrastructure could reduce price surges impacting consumers, businesses, and
  • For the December storms, they put a heavy load on our geotechnical engineers.
  • I would like to say that our crews saw these storms coming.
Keywords: 904, all
Summary: The Senate Transportation Committee met on January 20, 2006, for two work sessions: one on aircraft fuel pipeline resiliency after the Olympic Pipeline outage and one on flooding impacts to the state highway system. On the fuel topic, BP/Olympic Pipeline, the Port of Seattle, Alaska Airlines, and a renewable fuels consultant described the pipeline system, the Everett leak, and the response to keep Sea-Tac supplied. Witnesses said the leak was very small and below the pipeline’s detection threshold, prompting questions from senators about why a farmer found it first and whether the monitoring systems were adequate. BP described the pipeline’s operations, inspections, emergency response, and cleanup, while the Port and Alaska Airlines explained how they expanded truck offloading, issued notices to airlines, reduced fuel use, and diverted flights to preserve supply. The renewable fuels presentation argued that Washington’s dependence on a few pipeline routes creates a major vulnerability and that regional sustainable aviation fuel production and additional storage and delivery options could improve resilience. Committee members pressed witnesses on leak detection, the amount released, pipeline pressure, and the need for better safeguards near waterways and farmland. BP said the release volume would be determined later through soil and recovery calculations, and that both lines remained operational through the flooding that followed the spill. Port and airline representatives said the outage exposed a lack of redundancy and that Sea-Tac cannot meet daily fuel demand by truck alone, though emergency trucking and airline conservation helped avoid worse disruptions. The Port said it was studying additional fueling capacity and resilience measures, including sustainable aviation fuel infrastructure. The second work session focused on WSDOT’s response to major flooding and storm damage. WSDOT emergency management staff and regional administrators described statewide preparedness, emergency operations center activations, and the use of emergency declarations to speed repairs and contracting. They reported about 50 damaged sites, 16 emergency contracts, and a preliminary damage estimate of $40 million to $50 million, with federal reimbursement still being assessed. Specific examples included emergency repairs on US 2, I-90, SR 12, SR 410, SR 542, and US 101, with some roads reopened quickly through temporary stabilization and others requiring later permanent work. Senators thanked WSDOT crews and asked about the 30-working-day emergency contracting limit, federal funding, and whether emergency repair authority could be used to speed ordinary projects; WSDOT said the main delays in normal projects are environmental review and engineering requirements. The committee then adjourned.
CA
Transcript Highlights:
  • projection of climate projection that suggests that that storm, which was considered the great storm
  • , the great flood... ...that suggests that that storm, which was considered the great storm, the great
  • Many of those provide flood control and help reduce the peak surge coming down the system.
  • We're one storm away from disaster.
  • So how long is the storm event coming in over a period of time on the bottom?
Summary: The committee held an informational hearing on flood risk and flood management in California, with opening remarks emphasizing that flooding is a statewide and growing threat due to climate change, including the possibility of extreme losses in a worst-case event. Members noted recent flooding in places such as San Diego, the Tulare Basin, and Pajaro, and framed the hearing as a way to better understand prevention, response, and how to capture excess water for later use. Jeffrey Mount of PPIC gave the main overview, describing California’s high flood exposure, the different flood types the state faces, and the mix of structural and non-structural tools used to manage them. He stressed that levees, dams, bypasses, land-use planning, flood insurance, and emergency response all matter, but that risk is rising because current standards are based on past hydrology rather than future climate conditions. He also warned that flood management is underfunded, that the National Flood Insurance Program is weak, and that federal support is increasingly uncertain. Members asked about groundwater recharge, permitting, NOAA and federal cuts, and which communities are most at risk; Mount said recharge can help but does not eliminate flood risk, and that small Central Valley communities and heavily developed floodplains are especially concerning. State officials Laura Hollander of the Department of Water Resources and Jane Dolan of the Central Valley Flood Protection Board described the state’s role in forecasting, emergency response, grants, planning, and the Central Valley Flood Protection Plan. They highlighted aging infrastructure, the need for better coordination, and the state’s special liability in the Central Valley after the Paterno decision. Dolan reviewed the history of major floods and said the plan calls for about $1 billion per year over 30 years to meet current needs, while Hollander said the state works with local and federal partners on preparedness, response, and subventions projects. Both emphasized that floodplain planning, regional coordination, and faster permitting are important, but that more consistent funding is needed. A later panel from local flood agencies and districts reinforced those points, arguing that the state’s annual flood funding is below identified needs and that a proposed statewide flood and dam safety bond was reduced substantially in the broader climate bond package. Witnesses urged more routine maintenance funding, support for regional flood planning, and continued federal-state-local partnerships to reduce risk and maintain eligibility for federal assistance. No formal votes or legislative actions were taken during the informational hearing.
TX

Texas 89th Regular

Energy Resources Apr 14th, 2025

Energy Resources

Transcript Highlights:
  • You are registered with Government Affairs Manager Storm Fisher, and you're registered for the bill,
  • During winter storm Uri, my power went out in my house.
  • Some facilities are equipped to endure winter storms. ...while others may be vital during summer heatwaves
  • when demand surges.
  • Following winter storm Uri, pretty much the entire natural gas industry was registered as critical.
KY

Kentucky 2026 Regular Session

Interim Joint Committee on Economic Development & Workforce Investment (7-16-26)

Economic Development & Workforce Investment

Transcript Highlights:
  • a few days ago is um 2021 was this chart a few days ago is um 2021 was this huge<00:17:04.480><c> surge
  • </c> huge surge in venture capital activity. huge surge in venture capital activity.
  • when you have one industry take a hit, you have other industries around that can help weather those storms
  • when you have one industry take a hit, you have other industries around that can help weather those storms
  • Take a hit, you have other industries around that can help weather those storms.
CA
Transcript Highlights:
  • as we're aware, climate change continues to impact California's coast, generating sea level rise, storm
  • surge and flooding, coastal erosion, and habitat loss.
  • improve public safety, including shoreline resilience projects designed to address coastal flooding, storms
  • also done significant LIDAR mapping, and what we're hoping comes of this is the ability to forecast storm
  • would be working with NOAA and having their radar technologies focus so that the radar is watching storms
Keywords: 988, house, all
KY
Transcript Highlights:
  • we see surges in the population<01:43:34.080><c> with</c><01:43:34.400><c> female</c><01:43:34.800><
  • and uh we noticed algorithms with surges and uh we we<01:43:43.119><c> we</c><01:43:43.760><c> have<
  • I have asked Chairman Elliott and Chairman Storm both to help me with this, to help us put together a
  • I have asked Chairman Elliott and Chairman Storm both to help me with this, to help us put together a
  • I have asked Chairman Elliott and Chairman Storm both to help me with this, to help us put together a
Summary: The committee opened with roll call, welcomed a new member, approved the July meeting minutes, and then took up testimony on the statewide emergency responder voice system, also described as the state police radio system replacement project. John Hicks, secretary of the governor’s executive cabinet and state budget director, testified that the project is unusually complex because it combines multiple IT replacements, land acquisition, and tower construction. He said the existing system dates to the early 1970s and that the administration is treating the project as a priority, with work proceeding in phases and weekly coordination among the Justice Cabinet, Kentucky State Police, and Finance and Administration Cabinet. Hicks said the project has already spent about $110 million, with nearly 1,900 portable radios acquired, microwave replacement completed at 56 sites and underway at 76 more, and routers, switches, and network upgrades addressed. He explained that because the State Police are not set up to handle real property work, the administration brought in outside real property consulting vendors through an RFP, and three vendors are now qualified to help identify and negotiate sites. He said the goal is to speed up land acquisition and tower construction while the State Police continue the technology work, and he emphasized that the project is intended to close coverage gaps for state police first and later benefit local governments and other first responders. Members of the committee expressed concern about the project’s cost and pace. Representative Petri noted that about $218.8 million has been authorized since 2018 and questioned whether the project could stretch into 2030 or later, asking what more the General Assembly could do to help. Representative Blandon also raised concerns about the long timeline and the risk of the project becoming another costly, delayed infrastructure effort, while asking when the vendor RFP was completed and whether any sites had been acquired since then. Representative Sharp asked whether there was a detailed plan and timeline, and Hicks responded that the technology side is well defined but the property acquisition side must proceed site by site because each location depends on ownership, access, power, and other factors. Hicks said the west-to-east phasing has been a smart approach and that the executive branch should improve performance to beat the current timeline expectations.
CA

California 2025-2026 Regular Session

Assembly Emergency Management Committee Apr 28th, 2025

Emergency Management

Transcript Highlights:
  • As you know, Californians live with floods, fires, earthquakes, atmospheric storms, and more natural
  • The surge in demand for construction materials is anticipated to drive up costs by a staggering 15 to
  • You know the list the other items include things like air pollution, fire, flood, storm. Yeah, so.
Keywords: 988, house, all
TX

Texas 89th Regular

Intergovernmental Affairs Apr 8th, 2025

Intergovernmental Affairs

Transcript Highlights:
  • Imagine if Austin had been able to close its portion of the Fayetteville power plant before winter storm
  • Most of the change was due to natural variation, like the Saharan dust storm that summer, which created
  • This surge is overwhelming our water infrastructure, leading to rising demand and consequently stressing