New York 2025-2026 Regular Session

New York Senate Bill S04902

Introduced
2/14/25  
Refer
2/14/25  

Caption

Requires cell towers to be equipped with a back-up power source in case of a power outage.

Summary

This bill would amend New York’s General Business Law to require owners or operators of macro cell tower sites in the state, to the extent practicable, to equip those sites with an emergency back-up power source. The back-up system must be capable of keeping the site operating during a power outage and must provide at least 72 hours of power. The bill specifies that the back-up source should use a renewable energy system, fuel cell electric generating equipment, or an energy storage system. The bill also creates a phased-in approach for existing towers. If a macro cell tower site already has a back-up power source before the bill takes effect, the owner or operator would not have to immediately replace it. However, when that existing system needs to be replaced, the new back-up power source would have to meet the bill’s requirements. The measure defines “macro cell tower site” broadly for wide-area wireless service infrastructure, but excludes rooftop sites, small cell sites, and distributed antenna system sites.

Impact

The bill would add a new section to the General Business Law governing wireless telecommunications infrastructure and would impose a new equipment standard on macro cell tower sites statewide. It would affect cell tower owners and operators by requiring them to plan for outage resilience and, over time, to use renewable, fuel-cell, or energy-storage-based back-up systems that can sustain operations for at least 72 hours. Existing compliant or noncompliant back-up systems would be grandfathered until replacement is needed, limiting immediate retrofit costs.

Sentiment

No committee transcripts or recorded votes were provided, so there is no direct evidence of debate or formal support/opposition in the available record. Based on the bill text alone, the measure appears aimed at improving telecommunications reliability and emergency preparedness, which suggests a generally public-safety-oriented purpose. The absence of recorded discussion means the overall sentiment cannot be assessed beyond the bill’s stated policy goals.

Contention

The main potential points of contention are likely to be cost, feasibility, and the scope of the mandate. Tower owners and operators may object to the expense of installing or replacing back-up systems that meet the 72-hour requirement, especially where renewable energy, fuel cell, or energy storage solutions are not easily deployed. Another possible issue is the bill’s “to the extent practicable” language, which may raise questions about enforcement and what qualifies as practical compliance. The exclusion of rooftop, small cell, and distributed antenna system sites also suggests the bill is targeted at larger macro towers, which may limit opposition from smaller wireless infrastructure providers.

Companion Bills

NY A02670

Same As Requires cell towers to be equipped with a back-up power source in case of a power outage.

Previously Filed As

NY A00088

Requires cell towers to be equipped with a back-up power source in case of a power outage.

NY S02996

Requires cell towers to be equipped with a back-up power source in case of a power outage.

NY A02670

Requires cell towers to be equipped with a back-up power source in case of a power outage.

OR HB3743

Relating to emergency backup power for radio towers.

NJ A4516

Requires electric public utilities to pre-place repair equipment in areas with frequent power outages.

HI SB1648

Relating To Power Outages.

HI SB1648

Relating To Power Outages.

OR HB2723

Relating to backup power sources.

WV SB942

Modifying requirements for diesel-powered equipment in mines

MO HB2046

Requires utilities to reimburse customer losses due to power outages

Similar Bills

No similar bills found.