Maryland 2025 Regular Session

Maryland House Bill HB1296

Introduced
2/7/25  
Refer
2/7/25  
Report Pass
3/15/25  
Engrossed
3/17/25  
Refer
3/17/25  
Report Pass
3/27/25  
Enrolled
4/2/25  
Chaptered
5/13/25  

Caption

Preliminary Subdivision and Site Plans – Safe School Route Reports – Requirement

Summary

HB1296 establishes a Managed Aquifer Recharge Pilot Program within the Maryland Department of the Environment to test whether treated reclaimed water can be safely injected underground to augment groundwater supplies. The bill generally prohibits groundwater augmentation unless it is carried out under the pilot program and through a managed aquifer recharge permit. It authorizes the Department to review, permit, and regulate a single demonstration project that uses highly treated reclaimed water from an advanced water treatment facility. The bill sets detailed eligibility, treatment, monitoring, reporting, and public-notice requirements for any permit applicant. Those requirements include demonstrating a groundwater supply or quality need, showing site suitability, meeting stringent water-quality and pathogen-removal standards, evaluating alternatives, identifying potentially affected wells and industrial discharges, conducting hydrogeologic studies, and providing mitigation and alternative drinking water if needed. The Department may impose additional permit conditions, deny or revoke permits for noncompliance or public-health risk, and must report annually to the Governor and General Assembly on the pilot’s results and whether it should be extended or made permanent.

Impact

The bill amends the Environment Article to add a new permitting category for managed aquifer recharge pilot permits and to place those permits within the Department’s existing permit framework. It also defines key terms such as reclaimed water, groundwater augmentation, demonstration facility, and PFAS chemicals, and it creates a temporary, limited authorization for one pilot project only. The act takes effect October 1, 2025, runs for 11 years, and is scheduled to sunset on September 30, 2036 unless later changed by the General Assembly.

Sentiment

The voting record suggests the bill was generally supported, with the House and Senate both passing it by substantial margins. The final House vote was 103-35, and the Senate vote was unanimous at 47-0, indicating broad bipartisan acceptance of the concept of a tightly regulated water-reuse pilot. The rejection of a floor amendment also suggests that, while the bill was supported overall, some members sought changes that did not gain enough backing.

Contention

The main points of contention appear to center on environmental and public-health safeguards versus the desire to test a new water-supply strategy. The bill’s detailed treatment standards, monitoring requirements, well-owner notice provisions, and authority for the Department to deny or revoke permits reflect concerns about contamination, drinking-water safety, and impacts on nearby wells. Opponents or skeptics likely focused on the risks of injecting reclaimed water underground, while supporters emphasized the need to address groundwater shortages, land subsidence, and saltwater intrusion through a carefully controlled pilot program.

Companion Bills

MD SB930

Crossfiled Environment - Managed Aquifer Recharge Pilot Program - Establishment

MD HB1131

Carry Over Environment - Managed Aquifer Recharge Pilot Program - Establishment

Similar Bills

No similar bills found.