Video & Transcript Research : 'water quality'
Page 1 of 500
TX
Transcript Highlights:
- trust to support in-stream flows, water quality, fish and wildlife habitat, and bay and estuary inflows
- these water rights to the Texas Water Trust.
- , and the water we save is, again, the cheapest water that we get in this state.
- Can't live without water. Can't live without water.
- Can't live without water. Can't live without water.
Keywords:
water rights, Texas Water Trust, water bank, environmental conservation, water quality, instream flows, aquifer, water injection, Edwards Aquifer, environmental regulation, groundwater, Texas Commission on Environmental Quality, water conservation, drought, utility regulation, water use restrictions, Public Utility Commission, civil penalties, drought contingency, environmental protection
Summary:
The Committee on Natural Resources met with a quorum present and first took up several pending bills for reconsideration and committee substitute adoption. House Bill 2692, relating to codification and clarification of local laws concerning the San Antonio River Authority, was reported favorably to the full House and sent to the Committee on Local and Consent Calendars by an 11-0 vote. House Bills 1407, 1520, 1535, 2970, 4153, 291, 3663, and 3915 were also reconsidered or laid out as pending business, with committee substitutes adopted where needed and each bill reported favorably, generally by unanimous vote, to the full House and then to Calendars or Calendars/Calendars-related referral as applicable.
The committee then heard House Bill 4530, which would expand the Texas Water Trust framework to include groundwater rights, require Texas Water Development Board review and approval of groundwater dedications, and notify local groundwater districts when groundwater rights are placed in the trust. The bill’s author and witnesses from the Environmental Defense Fund, The Nature Conservancy, and Chispa Texas supported the measure as a conservation tool and a way to create a clear process for voluntary donations; a Texas Water Development Board witness testified neutrally. The bill was left pending.
House Bill 4931, relating to an aquifer storage and recovery project in Medina County, drew support from the author, the Medina County judge, and a regional water alliance witness, who described severe stress on the Edwards Aquifer, low levels at Medina Lake, and the need for a local water-supply tool. The bill was left pending. House Bill 5559, which would clarify enforcement of drought contingency plans for investor-owned water utilities and involve the PUC in model plan development, received support from groundwater district representatives but also concerns from water company and utility witnesses about enforcement authority, approval procedures, and potential conflicts with existing obligations to provide continuous service; the committee substitute was withdrawn and the bill was left pending. House Bill 5560, which would raise the maximum civil penalty for certain groundwater conservation district enforcement actions from $10,000 to $25,000 per violation, prompted debate over whether current law is already sufficient; supporters said the higher cap would better deter overpumping, while opponents argued existing penalties are already severe. That bill was also left pending, and the committee adjourned subject to call of the chair.
TX
Transcript Highlights:
- water and sewer services.
- within the Texas Water Bank and is administered by the Texas Water Development Board.
- To support in-stream flows, water Representative Romero: quality, fish and wildlife habitat, and bay
- these water rights to the Texas Water Trust.
- and the water that we save is, again, the cheapest water that we get in this state.
Keywords:
water rights, Texas Water Trust, water bank, environmental conservation, water quality, instream flows, aquifer, water injection, Edwards Aquifer, environmental regulation, groundwater, Texas Commission on Environmental Quality, water conservation, drought, utility regulation, water use restrictions, Public Utility Commission, civil penalties, drought contingency, environmental protection
TX
Transcript Highlights:
- So we'll probably be able to understand very quickly, soon, what is water, what's not water, and what
- To control discharges of pollutants to surface waters including treated produced water in the oil and
- Produced water is waste water generated during oil and gas extraction and is most commonly.
- The uses of treated produced water must meet water quality standards established by the Commission to
- Quality Act. standards, which are surface water quality standards.
Keywords:
Texas Commission on Environmental Quality, water regulation, environmental protection, pesticide management, natural resources, LP-gas, property owner notice, gas installations, safety notification, petroleum theft, task force, oil and gas, law enforcement, economic impact, environmental regulation, water permits, water quality, land application, 1185, senate
TX
Transcript Highlights:
- water and sewer services.
- and the trust to support in-stream flows, water quality, fish and wildlife habitat, and bay and estuary
- beyond surface water.
- these water rights to the Texas Water Trust.
- water use even after reaching their authorized annual water production limits.
Keywords:
election, bonds, authorization, financial governance, public funding, HB 143, bond election, debt authorization, November uniform election date, Texas Election Code, emergency election, voter approval, municipal bonds, local government finance, public debt, school bonds, special election, uniform election date, bond issuance, water rights
TX
Transcript Highlights:
- The, uh, quality of treatment of water that's being discharged into our receiving streams is essential
- So major issues for Texas water quality based on these small package plants.
- TCQ does not have a sliding scale for quality or water pressure and it's very expensive.
- to TCQ standard, pressure or water quality.
- Everybody wants water, needs water.
Keywords:
water audit, water loss, water loss mitigation plan, municipally owned utility, municipal utility, water conservation, Texas Water Development Board, TCEQ, Texas Commission on Environmental Quality, water leakage, leak detection, billing data accuracy, utility validation, water audit validation, water scarcity, water management, infrastructure, public utility, conservation plan, administrative penalty
TX
Transcript Highlights:
- It impacts water quality and... Not near enough work has been done on subsidence.
- It's a lot of water.
- and water failures.
- Additionally, water saved contributes to better water security.
- . ...water quality or unreasonable impacts on other holders of groundwater rights.
Keywords:
water audit, water loss, water loss mitigation plan, municipally owned utility, municipal utility, water conservation, Texas Water Development Board, TCEQ, Texas Commission on Environmental Quality, water leakage, leak detection, billing data accuracy, utility validation, water audit validation, water scarcity, water management, infrastructure, public utility, conservation plan, administrative penalty
TX
Transcript Highlights:
- All of the wastewater treatment plants that are being designed today exceed the water quality standards
- We can talk about that probably, but I think that is to exceed the water quality in the receiving stream
- Does the water system have to report to the Public Utility Commission regarding quality and whatnot?
- And so once that quality for the water system is determined to be poor, or had failed tests a certain
- TCEQ does not have a sliding scale for quality or water pressure. And it's very expensive.
Keywords:
water audit, water loss, water loss mitigation plan, municipally owned utility, municipal utility, water conservation, Texas Water Development Board, TCEQ, Texas Commission on Environmental Quality, water leakage, leak detection, billing data accuracy, utility validation, water audit validation, water scarcity, water management, infrastructure, public utility, conservation plan, administrative penalty
TX
Transcript Highlights:
- Lastly, the bill requires permit holders to annually report water data, um, water quality data instead
- Water utilities, both large and smaller, laser focused on ensuring water quality and customers have those
- availability and water quality impacts, OK.
- water quality.
- Right now, when the TCQ receives a water quality complaint.
Bills:
HB 937, HB 2078, HB 2080, HB 3322, HB 3350, HB 4212, HB 4630, HB 4896, HB 4951, HB 5348, HB 5675, SB 565, SB 971, SB 1662, SB 2124
Keywords:
special districts, notice requirements, Water Code, government transparency, public meetings, meeting notice, transparency, public engagement, notice, elections, groundwater management, water conservation, joint planning, environmental impact, desired future conditions, groundwater, conservation district, environmental quality, regulatory review, water utility
TX
Transcript Highlights:
- Lastly, the bill requires permit holders... ...to annually report water data and water quality data instead
- Water availability and quality. The committee substitute makes two changes to the bill.
- availability and water quality impacts.
- water quality.
- Right now, when the TCEQ receives a water quality complaint, they notify the water provider 14 days before
Bills:
HB937, HB2078, HB2080, HB3322, HB3350, HB4212, HB4630, HB4896, HB4951, HB5348, HB5675, SB565, SB971, SB1662, SB2124
Keywords:
special districts, notice requirements, Water Code, government transparency, public meetings, meeting notice, transparency, public engagement, notice, elections, groundwater management, water conservation, joint planning, environmental impact, desired future conditions, groundwater, conservation district, environmental quality, regulatory review, water utility
TX
Texas 89th Regular
Senate Committee on Water, Agriculture, and Rural Affairs Apr 7th, 2025
Water, Agriculture and Rural Affairs
Transcript Highlights:
- Some communities, such as Flores... in my district have experienced ongoing water quality concerns, including
- A key concern, however, is that when residents file complaints with TCEQ about water quality, public
- Generally then, Senate Bill 1662 would strengthen water quality oversight by authorizing TCEQ to notify
- , water supply, drainage, as well as water users and those who support the water industry.
- water troughs and our water wells.
Bills:
SB863, SB1190, SB1261, SB1413, SB1624, SB1662, SB1663, SB1855, SB1967, SB2124, SB2204, SB1623
Keywords:
Edwards Aquifer, water conservation, reclaimed water, aquifer storage, environmental protection, water loss, municipally owned utilities, Texas Water Development Board, administrative penalties, water audit, water infrastructure, water supply, state water plan, water management strategies, water financing, municipal bonds, revenue bonds, public debt, obligations, TWDB
TX
Texas 89th Regular
Water, Agriculture, and Rural Affairs Apr 7th, 2025
Water, Agriculture and Rural Affairs
Transcript Highlights:
- Some communities, such as Floresville in my district, have experienced ongoing water quality concerns
- A key concern, however, is that when residents file complaints with TCEQ about water quality, public
- Generally, Senate Bill 1662 would strengthen water quality oversight by authorizing TCEQ to notify public
- We established a Texas Water Bank in 1993 to facilitate the transfer, sale, and lease of water and water
- get water.
Bills:
SB863, SB1190, SB1261, SB1413, SB1624, SB1662, SB1663, SB1855, SB1967, SB2124, SB2204, SB1623
Keywords:
Edwards Aquifer, water conservation, reclaimed water, aquifer storage, environmental protection, water loss, municipally owned utilities, Texas Water Development Board, administrative penalties, water audit, water infrastructure, water supply, state water plan, water management strategies, water financing, municipal bonds, revenue bonds, public debt, obligations, TWDB
Summary:
The Senate Committee on Water, Agriculture, and Rural Affairs heard several water-related bills, with testimony focused on drinking water quality, groundwater contamination notice, flood infrastructure funding, water rights conservation, and utility service areas. SB 1662 would limit TCEQ’s advance notice to public water systems to no more than 24 hours before testing after a consumer complaint, to reduce the chance of temporary treatment affecting results. SB 1663 would allow TCEQ to notify private well owners, groundwater conservation districts, and nearby residents by direct means about known groundwater contamination, rather than relying mainly on first-class mail and annual reporting. SB 2124 would move the deadline for publishing the Texas Groundwater Protection Committee’s annual report from April 1 to June 1. Witnesses on the first two bills described long-running water quality problems and delayed notice in their communities and supported the measures. No opposition was recorded, and each bill was left pending for a later vote.
The committee also heard SB 1967, which would expand eligibility for Flood Infrastructure Fund financing to multipurpose projects that both reduce flooding and create water supply. Senator Hinojosa and Hidalgo County representatives described the Delta Reclamation Project as a shovel-ready example that would capture flood and drainage water, treat it, and produce new potable supply while also providing detention and flood mitigation. A Sierra Club witness also supported the bill, saying such projects could help manage floodwaters and reduce polluted discharges to bays and estuaries. The bill was left pending.
A lengthy and divided discussion followed on SB 1413, which would expand the streamlined expedited release process for landowners seeking removal from a water or sewer CCN in additional counties. Senator Nichols said the bill was a property-rights measure aimed at legacy monopolies and bad actors who use CCNs to hold landowners hostage, while supporters described cases where developers could not get timely service, including fire flow, or were asked to fund infrastructure without reasonable recoupment. Opponents from rural water corporations and utility associations argued the bill would undermine investment in water infrastructure, strand debt, and weaken the return on planned expansion. PUC and TCEQ resource witnesses explained that compensation is handled case by case through appraisal and can include stranded costs, planning, design, construction, and some legal fees, but members noted the statute is unclear and discussed possible committee substitute language. Public testimony was closed with the bill left pending.
Later, SB 1624 would allow the Texas Water Trust within the Texas Water Bank to hold donated water rights for conservation purposes and protect them from use-it-or-lose-it cancellation, and SB 863 would address Edwards Aquifer utilities that straddle the aquifer boundary by allowing them to continue using Edwards water within their certificated areas under specified conditions. Both bills were laid out, received no public opposition in the hearing, and were left pending.
TX
Transcript Highlights:
- systems have access to safe drinking water when persistent quality issues go unresolved.
- However, it will not address the cause of most water quality issues, which is a line break.
- The majority of water quality issues are caused by line breaks, where the line breaks and the negative
- Uh, my background is in San Antonio Water System, Water Quality division.
- Um, uh, with these different certification standards, do y'all see any particular impact on water quality
Keywords:
water filtration, public drinking water, health and safety, well maintenance, water quality, Edwards Aquifer, water conservation, reclaimed water, aquifer storage, environmental protection, public utility agency, dissolution, local government, regulatory framework, municipal authority, Texas Water Bank, Texas Water Trust, water rights, water banking, instream flow
TX
Transcript Highlights:
- systems. of access to safe drinking water when persistent quality issues go unresolved.
- The cause of most water quality issues is line breaks.
- The majority of water quality problems are caused by line breaks, which allow bacteria to enter the system
- My background is with the San Antonio water system's water quality division.
- Do y'all see any particular impact on water quality?
Keywords:
water filtration, public drinking water, health and safety, well maintenance, water quality, Edwards Aquifer, water conservation, reclaimed water, aquifer storage, environmental protection, public utility agency, dissolution, local government, regulatory framework, municipal authority, Texas Water Bank, Texas Water Trust, water rights, water banking, instream flow
TX
Keywords:
water infrastructure, Texas Water Development Board, financial assistance, water supply projects, rural municipalities, water access assessment, aquifer storage, Edwards Aquifer, water injection, environmental regulations, groundwater management, San Antonio River, pollution control, flood management, water quality, conservation district, bonds, utility rates, ratemaking, water services
TX
Keywords:
water infrastructure, Texas Water Development Board, financial assistance, water supply projects, rural municipalities, water access assessment, aquifer storage, Edwards Aquifer, water injection, environmental regulations, groundwater management, San Antonio River, pollution control, flood management, water quality, conservation district, bonds, utility rates, ratemaking, water services
TX
Transcript Highlights:
- We haven't talked about quality of life in that if you recruit rural students who like to hunt and fish
- hours in traffic in the urban areas, and they do like a little slower pace and do appreciate the qualities
- I mean, we all collectively have to create a high tide to enhance quality of life, to your point.
- number one, to Representative Johnson's excellent question and point, ensuring that we produce high-quality
- number one, to Representative Johnson's excellent question and point, ensuring that we produce high quality
Keywords:
special prosecutor, state law, criminal justice, accountability, law enforcement, stormwater management, counties, regulation, environment, water quality
Summary:
The Committee on Higher Education met to hear several bills and first corrected the minutes from its April 1, 2025 meeting to reflect that a committee substitute for HB 271 had been adopted before the bill was reported favorably. The committee then heard HB 3326, which would help Texas higher education employees, especially adjunct faculty, qualify for federal Public Service Loan Forgiveness by counting classroom hours toward full-time status, requiring institutions to verify employment within 60 days, and requiring annual notice to eligible employees. No witnesses testified against the bill, and it was left pending.
Members then heard HB 2853, authorizing UTEP to phase in a student union fee increase to fund demolition and reconstruction of its aging student union. Representative Perez and UTEP student and university witnesses said the current facility is outdated and insufficient for a campus of more than 25,000 students, while some members raised concerns about the size of the fee increase and its impact on low-income students. UTEP representatives said most students receive aid, the fee would be phased in over time, and the project was student-approved; the bill was left pending. The committee also heard HB 4066, a one-line bill to abolish the Texas Research Incentive Program after the state cleared its backlog of matching obligations, with the author saying the program was no longer needed in light of newer research funding approaches. The bill was left pending.
The committee spent substantial time on HB 125, which would create the Tarleton State University College of Osteopathic Medicine. Supporters, including Tarleton leadership, the founding dean, a rural hospital CEO, and a feasibility consultant, argued the school would address severe rural physician shortages by recruiting Texas and rural students, training them in rural settings, and developing new residency slots rather than competing for existing ones. Members asked about affordability, residency placement, and whether the school would draw students from rural Texas; Tarleton said it would seek to keep tuition and debt low, had already raised private donations, and would request $25 million in state support over the biennium. The bill was left pending.
Finally, the committee heard HB 42, which would increase the annual Higher Education Fund appropriation and adjust its allocation methodology. The chair and university witnesses described rising deferred maintenance, inflation, cybersecurity needs, and enrollment growth at HEAF-eligible institutions, with witnesses from Texas Tech, Sam Houston State, and UNT saying the additional funding would help address aging facilities and technology needs. After testimony, the committee left HB 42 pending and recessed.
TX
Keywords:
concrete plants, environmental regulation, permit process, air quality, Texas Commission on Environmental Quality, SB 1061, uranium mining, production area authorization, TCEQ, Water Code, groundwater, groundwater conservation district, restoration table value, restoration values, contested case hearing, Chapter 2001, mineral rights, surface owners, notice requirements, environmental permitting
TX
Texas 89th Regular
Water, Agriculture, and Rural Affairs Mar 17th, 2025
Water, Agriculture and Rural Affairs
Keywords:
water management, bond issuance, eminent domain, regional authority, fee structures, local governance, environmental quality, oyster cultivation, coastal management, natural resources, marine ecosystems, Texas Parks and Wildlife, Texas Water Development Board, guidance principles, flood plan, state water plan, rule review, infrastructure, water discharge, general permit
NM
New Mexico 2026 Regular Session
House - Agriculture, Acequias And Water Resources Feb 3rd, 2026 at 09:03 am
House Agriculture, Acequias And Water Resources
Transcript Highlights:
- But today, I sit here as Vice Chair of Water Trust Board.
- So The story of water in 2017, our distribution of the Water Trust Board was zero.
- The Water Trust Board, NMFA, NMFA Oversight, we all get our job completed by December.
- But what I might add to this is that all the water and wastewater projects that go through the Water
- quantity or quality.
Keywords:
insects, ecosystem, education, public awareness, wildlife conservation, state agency involvement, New Mexico, equine welfare, animal rescue, shelter funding, trust fund, veterinary care, water project fund, water project finance act, New Mexico Finance Authority, water infrastructure, water grants, water loans, regional water planning, water rights adjudication
TX
Transcript Highlights:
- When setting watershed monitoring practices and water quality standards, it requires plastics facilities
- In 2022, TCEQ had the language that would regulate pre-production plastic pollution and water quality
- This ensures that water quality standards are protective and workable.
- TCEQ already does a phenomenal job in evaluating and updating the surface water quality standards and
- That's one of the programs under the Water Quality Division. Yes, so I guess I appreciate it.
Keywords:
hydrogen sulfide, public health, environmental regulation, Texas Commission on Environmental Quality, ground level concentrations, emissions limit, emissions limits, ground-level concentrations, air quality, PFAS, agriculture, environmental protection, health risks, criminal offense, chemical regulation, preproduction plastic, water quality, pollution control, industrial waste, emissions