  • in buildings, for example, that they're renting, but they can't get all the permits to get started.
  • I want to be clear that the, the bill does not apply, um, for the permits or licenses.
  • So complaints were that the permitting was too costly, took too long, and the application requirements
  • Um, for small businesses, time is money, and every day that a business waits on a permit is a day of
  • Package stores, distillers, breweries, brew pubs, holders of mixed beverage permits or bars, holders
Bills: SB 28
TX

Texas 89th Regular

Water, Agriculture, and Rural Affairs May 5th, 2025

Water, Agriculture and Rural Affairs

Transcript Highlights:
  • Texas before issuing or amending groundwater permits.
  • Texas before issuing or amending groundwater permits.
  • Currently, when considering an application for a groundwater permit, GCDs must consider several criteria
  • Or amending groundwater permits.
  • And the groundwater district in Gonzales has already permitted over 92,000 acre-feet, which exceeds the
Summary: The Senate Water, Agriculture, Rural Affairs Committee heard several bills focused on groundwater management, water infrastructure, and agricultural land conservation. SB 612 would limit certain water districts in Hidalgo, Cameron, and Willacy counties from charging developers pipeline construction fees above actual, documented costs; the committee substitute removed a developer challenge mechanism to preserve district discretion over construction standards. HB 1633 would require groundwater conservation districts to consider registered exempt wells when reviewing or amending permits, and testimony from landowners, district representatives, and advocacy groups largely supported the bill as a way to protect domestic and livestock wells from drawdown caused by large export projects. HB 1689 would clarify that export fee revenues may be used for well operability, alternative water supplies, and aquifer monitoring, including through interlocal cooperation, and HB 3058 would give the Post Oak Savannah Groundwater Conservation District authority to use export fees for county road improvements and environmental programs tied to well inspection and groundwater management. HB 2018 would clarify that the Texas Farm and Ranchland Conservation Program is intended to purchase conservation easements only on working agricultural lands, with support from cattle raisers and Farm Bureau representatives. The committee also considered HB 29, which would require large water systems to validate water loss audits and submit mitigation plans; a committee substitute removed the water-loss threshold and adjusted the timeline for more detailed validation. Public testimony on the bills was generally supportive, with several witnesses describing declining well levels, road damage from export projects, and the need to preserve agricultural land and local water supplies. The committee adopted committee substitutes and voted favorably on HB 29, HB 1689, HB 2018, SB 612, and SB 3058, recommending several of them for the local and uncontested calendar; HB 1633 was left pending awaiting a committee substitute.
TX

Texas 89th Regular

Senate Committee on Water, Agriculture, and Rural Affairs May 5th, 2025

Water, Agriculture and Rural Affairs

Transcript Highlights:
  • in Texas before issuing or amending groundwater permits.
  • When considering an application for a groundwater permit, groundwater conservation districts (GCDs) must
  • holders. and groundwater quality.
  • permits or permit amendments.
  • and the management of groundwater. or by those groundwater districts.
TX

Texas 89th Regular

Licensing & Administrative Procedures May 6th, 2025

Licensing & Administrative Procedures

Transcript Highlights:
  • People are sitting in buildings, for example, that they're renting, but they can't get all the permits
  • The complaints were that the permitting— was too costly, took too long, and the application requirements
  • For small businesses, time is money, and every day that a business waits on a permit is a day of lost
  • And by asking political subdivisions to issue these permits within a specified timeline, this bill would
  • So, I mean, if you can get your permit from the city in 14 days, you're still going to sit there for
MN

Minnesota 2025-2026 Regular Session

House Environment and Natural Resources Finance and Policy Committee 3/24/26

Environment and Natural Resources Finance and Policy

Transcript Highlights:
  • allows for timely transfer of permits. allows for timely transfer of permits.
  • to that permit.
  • look at all of the permits. look at all of the permits.
  • Refunding permit fees with the permit.
  • they use the permit? they use the permit? >> Mr.<01:39:55.840> M. Mr.
TX

Texas 89th 2nd C.S.

Natural Resources Apr 23rd, 2025

Natural Resources

Transcript Highlights:
  • by exempting from groundwater conservation district, or GCD, permitting requirements groundwater wells
  • We are opposed to allowing brackish groundwater of any TDS level to be exempt from permitting.
  • that brackish groundwater projects have been slowed or inhibited by the permitting process in any way
  • , the fresh groundwater, of those that are permitted.
  • The fresh groundwater of those that are permitted, and they're going to have to answer to that in the
Summary: The Committee on Natural Resources heard House Bill 2109, which would remove certain long-proposed reservoir projects from the state water plan after 50 years without progress. Chairman Van Deaver and many landowners, local officials, timber interests, and conservation advocates testified in support, arguing that the Marvin Nichols Reservoir has burdened Northeast Texas landowners for decades with the threat of eminent domain, depressed property values, and uncertainty over homes, farms, ranches, schools, churches, and cemeteries. Supporters also said the project would flood tens of thousands of acres, require extensive mitigation, harm timber and agriculture, and that Texas now has better alternatives such as conservation, reuse, aquifer storage and recovery, and desalination. Several members expressed sympathy for the affected families and questioned whether a project could remain in the plan indefinitely without progress. Opposition came from North Texas water interests, including the North Texas Commission, Tarrant Regional Water District, and the Texas Water Association, who argued that the bill would interfere with the state’s long-term water planning process and remove needed future supply options for a fast-growing region. They said Region C faces major projected shortages by 2070, that conservation and reuse have already delayed the need for new supplies, and that reservoirs remain one tool in the state’s water-planning toolbox. TWDB staff explained the existing inter-regional conflict process and noted that the substitute would affect several unique reservoir sites, not just Marvin Nichols. After testimony, Chairman Van Deaver closed by urging passage of the bill, but the committee withdrew the substitute and left HB 2109 pending. The committee then took up House Bill 5188, a brackish groundwater bill. The author said the bill would reduce permitting burdens for wells in designated brackish groundwater production zones, and the committee substitute added requirements on monitoring, groundwater-rights ownership, and allocation of pumpage limits while removing some exclusions and export-fee provisions. Texas Wildlife Association testified against the bill, warning that the exemptions could weaken groundwater conservation districts’ ability to protect freshwater resources and surface-owner rights. San Antonio Water System testified in favor, saying brackish groundwater is a key future supply and that the substitute would help speed development of desalination and brackish projects. The Texas Alliance of Groundwater Districts testified neutrally but raised concerns about reduced district oversight, especially around injection-well exclusions and the loss of export fees, and said discussions on the bill were ongoing.
TX

Texas 89th Regular

Natural Resources Apr 23rd, 2025

Natural Resources

Transcript Highlights:
  • House Bill 5188 addresses brackish groundwater as a water supply source by exempting the permitting requirements
  • permitting requirement.
  • that brackish groundwater projects have been slowed or inhibited by the permitting process in any way
  • , and achieve the same outcome. a more attractive brackish groundwater permitting with far less risk.
  • A project using the brackish groundwater to take the permitting process out of it, I think is very, very
TX

Texas 89th Regular

Natural Resources Apr 23rd, 2025

Natural Resources

Transcript Highlights:
  • In closing, it is of utmost importance to our groundwater this that groundwater resources be protected
  • ongoing future groundwater projects, permitting, infrastructure development, and financial processes
  • Under current law, the North Texas ground water conservation district issues permits for groundwater
  • does it automatically deny any permits or permit amendments.
  • This category now represents the second largest permitted groundwater volume in our region and it shares
TX

Texas 89th 2nd C.S.

Natural Resources Mar 26th, 2025

Natural Resources

Transcript Highlights:
  • , uh, permitting conversation, but we could deal with this more efficiently if TCEQ had some clearer
  • And so I think there's existing safeguards both within the permitting requirement in Representatives.
  • Almost every permit we do today, we're already meeting Type 1 reuse standards.
  • Uh, it's, um, not, um, not often that we see permits that, uh, abut our certificated service area or
  • If it's groundwater versus surface water, the groundwater is going to have more pollutants in it naturally
TX

Texas 89th Regular

Natural Resources Mar 26th, 2025

Natural Resources

Transcript Highlights:
  • If a municipality has a permit for taking and transporting groundwater, and they don't fix their problem
  • are to groundwater resources.
  • One permit.
  • Graphic that would come with a permit application because they would do a basic groundwater availability
  • model on just that permit alone.
TX

Texas 89th Regular

Natural Resources Mar 26th, 2025

Natural Resources

Transcript Highlights:
  • If it's uneconomical, they don't pursue it. to have to grant that permit.
  • Almost every permit we do today, we're already... Meeting type one reuse standards.
  • TCEQ has granted these permits even where the city had the ability and the willingness to serve.
  • Should economics even have a place as long as the permit quality is met, the discharge permit?
  • Groundwater versus surface water; the groundwater is going to have more pollutants in it naturally occurring
OK

Oklahoma 2026 Regular Session

Energy REVISED Mar 5th, 2026 at 09:30 am

Energy

Transcript Highlights:
  • We've got some measuring requirements that are put in on all of those permitted users.
  • So there's a Lot of people that aren't going to be affected by this, but those that are permitted, I'm
Bills: SB1928, SB259
TX

Texas 89th Regular

Senate Committee on Water, Agriculture, and Rural Affairs Apr 28th, 2025

Water, Agriculture and Rural Affairs

Transcript Highlights:
  • Requiring temporary permits for very small projects and requiring a full permit for major projects adds
  • Under current law, the North Texas Groundwater Conservation District issues permits for groundwater production
  • such permits.
  • This category of use now represents the second largest permitted groundwater volume in our region, and
  • Groundwater development, correct? Correct. The groundwater district, right. Yeah, okay. Thank you.
TX

Texas 89th 2nd C.S.

Natural Resources May 7th, 2025

Natural Resources

Transcript Highlights:
  • The sand mine upstream repeatedly violating its permit, harming our land and water.
  • Groundwater Conservation District. you, Mr.
  • Groundwater Conservation District.
  • The Southeast Texas Groundwater Conservation District consists of four counties.
  • It's estimated to be the 11th largest groundwater district in the state.
Summary: The Committee on Natural Resources heard testimony on a series of water, utility, and groundwater-related bills. Early items included HB 5693, which would let Drainage District 7 hold board elections in November of odd-numbered years when a countywide election is occurring, and HB 5671, which would update the Johnson County Special Utility District by clarifying board eligibility, allowing bond issuance, and removing redundant TCEQ approval language to reduce costs and delays. Both bills were left pending after brief testimony from bill sponsors and local witnesses. The committee also heard SB 1504, which would update the Gulf Coast Authority to allow video-conference participation in meetings, and SB 1302, aimed at closing a TCEQ permitting loophole that allowed dischargers with prior denials or suspensions to reapply through an automated process without meaningful review. SB 2692 drew substantial discussion: it would change the signature threshold for outside-city-limits customers appealing municipal utility rates to the PUC by customer class. Valero supported the bill as a way to avoid requiring large-volume users to gather signatures from unrelated residential customers, while the City of Corpus Christi opposed it, arguing that lowering the threshold to one customer could trigger expensive appeals costing $500,000 to $1 million. A PUC witness said such cases are increasing and that the agency would need additional staff under the fiscal note. SB 790, creating a simplified PUC complaint process for small water and wastewater billing disputes, and SB 1663, expanding TCEQ notice requirements for nearby residents when groundwater contamination is discovered, were also heard and left pending. Additional bills included HB 3115, clarifying that the Cow Creek Groundwater Conservation District cannot require meters on exempt domestic or livestock wells; SB 1055, raising the Southeast Texas Groundwater Conservation District’s production fee cap from 1 cent to 7 cents per 1,000 gallons; and SB 1625, requiring private water and wastewater utilities to report cybersecurity incidents to TCEQ and DIR. The committee then took up pending business and adopted a substitute for SB 7, which made several changes to water fund use, eminent domain coordination, and EDAP-related provisions, and voted 10-0 to report it favorably. The committee also adopted a substitute for HB 2347, a county water conservation program bill, and reported it favorably 9-1. HB 5675 and SB 2476 were each reported favorably 10-0. The meeting concluded with adjournment.
TX
Transcript Highlights:
  • First, TACA requested the standard permits.
  • Air Permits Division at the Texas Commission on Environmental Quality.
  • Could change some of the conditions of a permit, however, one of the conditions to to a standard permit
  • This permit determines pre-mining low and high. values of groundwater quality to measure post mining
  • groundwater restoration.
TX

Texas 89th 2nd C.S.

Natural Resources May 21st, 2025

Natural Resources

Transcript Highlights:
  • We'll rely on groundwater for this water supply.
  • I'm the general manager of the Upper Trinity Groundwater Conservation District.
  • We are ground zero for groundwater wells being drilled.
  • In other words, just to cut to the quick of it, a lot of groundwater being used.
  • support essential infrastructure tied to groundwater conservation and district operations.
AZ

Arizona 2026 Regular Session

03/10/2026 - House Natural Resources, Energy & Water

Natural Resources, Energy & Water

Transcript Highlights:
  • The recharge permit statute contains the requirements for the department.
  • The recharge permit statute contains the requirements for the permits. Okay, DWR is here, so...
  • Okay, they could change your permit. Any other questions?
  • Van Buffam explained: a constructed underground storage facility permit allows a permit holder to operate
  • So it's not groundwater. There's no replenishment obligation.
Summary: The Committee on Natural Resources, Energy and Water held a brief meeting and considered several water and energy measures. Senate Bill 1202, which would require the Arizona Department of Water Resources director to include additional information about each groundwater basin in the five-year water supply and demand assessment, was described as similar to a bill vetoed in a prior session. After a motion for a do pass recommendation, the committee approved it on a 6-3 vote with one absence. The committee then heard Senate Bill 1418, which limits county regulation of small modular nuclear reactors in certain circumstances, expands the definition of “plant” for siting purposes, and allows replacement of existing thermal units with SMRs without a new certificate of environmental compatibility in specified cases. Members noted that parts of the bill were similar to previously vetoed measures. The committee passed the bill 6-3 with one absence, with some members explaining their votes and one member saying they would support it for now but might reconsider on the floor. Senate Concurrent Memorial 1007 urged Congress to divest the Bureau of Indian Affairs of the San Carlos Irrigation Project Electric System and fund a system study and improvements. Supporters said the system is old, unreliable, and difficult for the federal government to manage, and that local public power entities could do a better job if divestiture were authorized. The memorial passed unanimously, 9-0 with one absence. Finally, Senate Bill 1785, which would codify a one-mile area-of-impact safe harbor for certain recovered stored water wells unless a separate hydrologic study is submitted, received testimony from a water attorney and an ADWR representative describing it as a codification of long-standing department policy. The committee passed SB 1785 on a do pass recommendation by a 9-3 vote with one absence.