Video & Transcript : 'upgrades' :
Page 9 of 188
ND
North Dakota 2025-2026 Regular Session
House Appropriations - Government Operations Division Apr 8th, 2025 at 02:30 pm
Appropriations - Government Operations Division
Transcript Highlights:
- one-time funding change, and that is funding for some legislative chamber and legislative chamber upgrades
- and some systems upgrades.
- And that is funding for some legislative chamber and legislative chamber upgrades and some systems upgrades
- Okay, John, the system upgrade I can understand, but are we going to actually do a remodel or more a
Summary:
The House Appropriations Government Operations Division met to consider House amendments to Senate Bill 2001, the budget for the Legislative Council and Legislative Assembly. Representative Meyer and Legislative Council staff reviewed the House changes, which included higher lodging funding tied to a prior bill, an increase for North Dakota legislators’ forum dues, a transfer of $290,000 for public printing from the Secretary of State to Legislative Council, a $650,000 reduction tied to the nuclear energy study because that funding was already provided elsewhere, and a new section allowing legislative space on the 15th floor of the Capitol to be used for additional Legislative Council employees. John Bjornson explained the 15th-floor space proposal and said staff would work with Facility Management and CTE to address relocation needs and timing, with CTE’s move potentially delayed until after its busy school-year period if necessary.
The committee then reviewed the Senate version of the bill in more detail. Staff walked through the Legislative Assembly budget items, including per diem and compensation adjustments, lodging and mileage estimates, IT and audio/video funding, and dues increases for national and state legislative organizations. Members asked about mileage assumptions and the emergency clause, and staff said the emergency language is standard and allows flexibility for transfers, carryovers, and other budget actions. The committee also reviewed the Legislative Council budget, including funding for 25 new FTEs, interim travel, IT costs, professional services, public printing, and one-time items such as equipment and term limits consulting, while the advanced nuclear energy consulting item was removed in the House version.
After discussion, the committee adopted the House amendment to Senate Bill 2001 and then voted to do pass the bill as amended. Both motions passed on roll call, and the amended bill was sent to the full Appropriations Committee. Near the end of the meeting, Representative Paula gave notice that she would bring a separate amendment later on the Industrial Commission budget related to homelessness grant funding, noting it would not use SIF or general fund dollars.
NH
New Hampshire 2026 Regular Session
House Finance Division I (04/20/2026)
Transcript Highlights:
- So bringing someone on who can really help us through the process of making the choices of what to upgrade
- So bringing someone on who can really help us through the process of making the choices of what to upgrade
- Making the choices of what to upgrade and when and how much that's all going to cost, and to make sure
- </c><00:22:52.920><c> are</c><00:22:53.000><c> needed</c> more infrastructure upgrades are needed more
- infrastructure upgrades are needed and<00:22:54.240><c> the</c><00:22:54.320><c> pressure</c><00:22:
Summary:
The committee held a work session on House Bill 592, which concerns regional conservation and energy resources planning for habitat strongholds and wildlife corridors, and a commission to study transferring ownership of the Winnipesaukee River Basin Program to another authority. Jason Stock of the New Hampshire Timberland Owners Association said his group was fine with the bill as printed, especially after Senate language clarified that habitat stronghold designations are for information gathering and not regulatory purposes. Ted Diers of the Department of Environmental Services strongly supported the bill’s Winnipesaukee River Basin provisions, saying the state’s role in operating the wastewater system is outdated and that the communities are now capable of taking more control; he also supported creating a higher-level engineering/director position to oversee aging infrastructure and help manage a possible transition. Committee members asked about the facility’s location, capacity, costs, staffing, the possibility of private operation, the commission’s membership, and whether the six-month study timeline was realistic. Diers said there would be no state savings beyond administrative time, that the communities already pay the costs, and that a report in six months should provide useful next steps even if it would not resolve everything. The chair closed the work session on HB 592 and announced a brief recess before later action, while a member indicated interest in proposing an amendment to change the commission’s membership.
TX
Transcript Highlights:
- Currently our IT upgrade is on time and within budget.
- Well, it's GIS cloud upgrade. Yeah. Oh, yes, sir. So are GIS is our mapping system. Obviously.
- When we did this and when we upgraded IT, we just left it on mainframe.
- We'd like to make sure that we upgrade all of it into the cloud.
- Our building is nearly 50 years old and is in dire need of repair, renovations and upgrades.
Committee:
Senate Finance
MA
Massachusetts 2025-2026 Regular Session
Senate Committee on Climate Change and Global Warming May 27th, 2026
Senate Committee on Climate Change and Global Warming
Transcript Highlights:
- There are electricians that are coming in for panel upgrades. There are...
- There are electricians that are coming in for panel upgrades.
- Residents receive affordable upgrades, which leads to lower utility bills.
- So landlords have lacked financial motives to upgrade, especially small landlords.
- And in return, landlords in these specific neighborhoods are receiving energy efficiency upgrades.
WY
Wyoming 2026 Regular Session
Joint Corporations, Elections & Political Subdivisions, May 22, 2026 - PM
Corporations, Elections & Political Subdivisions
Transcript Highlights:
- Our proposed upgrade, the entire upgrade was I believe 2.
- $10 million to upgrade what was it?
- ><c> upgrade</c><00:24:19.080><c> was</c><00:24:19.560><c> I</c> upgrade, the entire upgrade was I upgrade
- </c> have a login if if we do this upgrade. have a login if if we do this upgrade.
- </c><01:12:59.440><c> our</c> costs 3 million dollars to upgrade our costs 3 million dollars to upgrade
MN
Minnesota 2025-2026 Regular Session
House Floor Session 3/23/26 - Part 2
Minnesota House Floor Meeting
Transcript Highlights:
- Under the current law, these line upgrades would require a whole new certificate of need, despite the
- This bill removes the requirement for a new certificate of need when upgrading a line with a capacity
- </c><00:26:30.840><c> a</c> new certificate of need when upgrading a new certificate of need when upgrading
- There is no difference when you upgrade the lines, and therefore, I would recommend a green vote.
- As you can see, they are are upgraded.
HI
Transcript Highlights:
- . $8 million for upgrades and improvements to National Guard Youth Challenge facilities and Kyle Law.
- And in economic development, diversification, and tourism, $36 million for repair and upgrades of the
- </c><00:52:56.079><c> and</c> statewide. 8 million for upgrades and statewide. 8 million for upgrades
- </c><00:53:08.000><c> of</c><00:53:08.160><c> the</c> for repair and upgrades of the for repair and upgrades
- $30 million for the new Oahu community correctional facility, $10 million for security perimeter upgrades
FL
Florida 2025 Regular Session
February 11, 2025 - 09:00 AM
Transcript Highlights:
- implement case management systems, customer relationship management system, business application upgrades
- The department launched the motorist modernization project in 2014 to upgrade and modernize critical
- chairman mentioned, the Motorist Modernization Program is a multi-year, multi-phase initiative to upgrade
- Um, are we keeping up with tech debt and upgrading to the next level of whatever it is that your code
- So you're looking at upgrading your phone system.
Summary:
The subcommittee heard updates on several state technology modernization efforts, beginning with the Florida Division of Emergency Management’s Enterprise Business Solution (DEMS). FDEM said DEMS is about 50% complete, with some grants and finance functions already live, and is intended to replace manual disaster and grants processing with a cloud-based system. Officials described faster reimbursement timelines after recent storms, major return-on-investment claims, and a planned final phase focused on design, testing, communications, data governance, and additional functionality. Members asked about the total cost, the role of Florida Digital Service, deliverables-based contracting, and how much of the system is live; FDEM said the project is expected to cost about $16 million to $16.8 million and finish by June 2027, with some follow-up information to be provided.
The Department of Legal Affairs presented its Office of Attorney General Modernization Program, a follow-up to an earlier effort that failed after spending about $26 million. Acting Attorney General John Gard said the department has now moved to an off-the-shelf case management product, LawBase, and is in development and testing, with the Office of Statewide Prosecution already live and full implementation expected by the end of the fiscal year. The request includes funding for staff augmentation, cloud storage, the LawBase license, redundancy through a backup site in Orlando, and OnBase support. Members questioned the prior failure, the use of Florida Digital Service standards, data location and cloud migration, and the redundancy plan; Gard said lessons learned included better scoping and that the current effort is on track.
The Department of Highway Safety and Motor Vehicles then updated the committee on Motorist Modernization, including the Orion system and the MyDMV portal. Officials said Phase 1 and Phase 2 have modernized driver license and motor vehicle services, with Phase 2 statewide rollout scheduled to begin in April 2025 and Phase 3 proposed at $16.5 million for dealer services, data warehouse improvements, and call center modernization. Members asked about payment options, organ donor questions, staffing, cybersecurity, cloud strategy, and the digital driver license program. The agency said the portal already allows some sanctions to be cleared online, an ACH option is being developed, the digital driver license vendor has changed with a fall go-live anticipated, and the department is using security testing and a managed security service provider. Officials also said the system is currently on an on-prem private cloud, with future workloads expected to move to public cloud where appropriate.
Finally, Florida Commerce presented on the Reemployment Assistance modernization system, Reconnect, and the FLWINS workforce system. Commerce said Reconnect is hosted in the Azure Government Cloud, has reduced claim filing time, improved fraud detection, and increased appeals capacity, and now needs $4.9 million in recurring funding to cover ongoing operations, cloud hosting, licenses, and staff augmentation. Members asked about adjudication issues, wait times, fraud prevention, and whether the system stores caller identifiers; Commerce said the average wait to speak to a representative is about 18 minutes and claims are generally processed in four to six weeks. The committee then began hearing about FLWINS, which is intended to create a “no wrong door” workforce portal under the REACH Act, but the transcript cuts off before that presentation concluded.
NH
New Hampshire 2025 Regular Session
House Public Works and Highways (03/04/2025)
Transcript Highlights:
- We are upgrading it and going through a massive upgrade to take it to the cloud, the most significant
- a massive upgrade to take going through a massive upgrade to take it<00:22:18.880><c> to</c><00:22:19.039
- </c> the process for uh upgrading the process for uh upgrading HVAC<00:44:41.280><c> uh</c><00:44:41.720
- </c> complete this security system um upgrade complete this security system um upgrade for<05:49:03.638
- Then the last one here is the Glencliff Home fuel system upgrade.
Summary:
The Department of Administrative Services presented its capital budget process and priorities, explaining how agencies assess facility needs, rank projects, and submit requests to the governor’s office. DAS described its Plant and Property division, which maintains 96 state buildings, and Public Works, which develops detailed cost estimates for selected projects. Officials said the governor’s office has traditionally narrowed requests into priority tiers, but this year all projects were estimated, creating more work and less detail. They also emphasized that the capital budget book functions as legislative intent and can be binding on how approved funds are used.
On the substance of the request, DAS highlighted several priorities: continued funding for the state ERP system upgrade to the cloud, with about $5 million requested for sustainability and related Treasury functions; emergency fund and annex renovation work; a sprinkler replacement at DMV; and elevator repairs at the main building. Karen Rocky also identified maintenance projects that rose in priority after a facility condition assessment, including HVAC work for Portsmouth Circuit Court and Coos County Courthouse, boilers and controls for Carroll County and Lebanon Circuit Court, brick repointing at the main building and annex, window replacement at Spalding, and Brown building elevator replacement. Officials noted that the governor’s proposed capital budget included fewer DAS projects than in past years and no projects for the Bureau of Court Facilities.
The committee also discussed lapses and reprogramming of prior appropriations. DAS said the first eight projects approved in 2023 remain under construction and should be extended, while many 2021 projects are delayed because of ARPA-related workload and broader construction backlogs. Members reviewed a 2019 project list and agreed to lapse project number 49, the Spalding roof project, with about $81,000 remaining. DAS also said some small 2019 balances, including courthouse generators, a boiler, cooling and controls, roof and exterior repairs, and the State House Annex elevator, could be redirected through Capital Budget Overview toward the Hillsboro County South Cell Block project. The hearing ended with questions about project schedules, ARPA deadlines, and the division of authority between DoIT and DAS for the ERP system.
WA
Transcript Highlights:
- , so irrigation or things like that where there might need to be upgrades on, say, a farm to irrigate
- For items like easements to acquire in perpetuity the protection of these lands, as well as upgrading
- , so irrigation or things like that where there might need to be upgrades on, say, a farm to irrigate
- , so irrigation or things like that where there might need to be upgrades on, say, a farm to irrigate
- I think along the way, one of the things we found was that upgrading smaller ball fields, senior league
Committee:
House Capital Budget
Keywords:
HB2470, school construction assistance, capital budget, school facilities, on-base schools, military base schools, military installations, public school construction, school plant projects, state funding assistance, superintendent of public instruction, OSPI, school capital funding, instructional space, school district construction, alternative learning experience, ALE, free and reduced-price meals, special housing burden, district growth
MN
Transcript Highlights:
- Because this is not just an IT upgrade, it is core infrastructure for how we serve people.
- , it is core not just an IT upgrade, it is core infrastructure<00:21:20.799><c> for</c><00:21:21.039>
- </c><00:26:59.600><c> this</c> will only benefit us to upgrade this will only benefit us to upgrade this
- Upgrading public IT infrastructure is a pivotal component of a fraud prevention strategy.
- </c> of projects allows you to upgrade of projects allows you to upgrade systems<01:30:18.159><c> as<
Committee:
House Capital Investment
Keywords:
emergency shelter, grant program, homelessness, capital investment, Minnesota Statutes, appropriation bonds, public funding, housing, infrastructure bonds, funding, appropriation, Minnesota constitutional amendment, public debt, state bonds, general obligation bonds, information technology, IT infrastructure, software licenses, technology modernization, capital improvements
KY
Kentucky 2025 Regular Session
Budget Review Subcommittee on Transportation (11-5-25)
Transcript Highlights:
- </c><00:43:06.560><c> equipment</c><00:43:06.960><c> and</c> gained by upgrading equipment and gained
- We're able to partner with groups like Logan Aluminum and do track infrastructure upgrades leading up
- We're able to partner with groups like Logan Aluminum and do track infrastructure upgrades leading up
- We're able to partner with groups like Logan Aluminum and do track infrastructure upgrades leading up
- We're able to partner with groups like Logan Aluminum and do track infrastructure upgrades leading up
Summary:
The subcommittee approved the October 15 minutes and observed a moment of silence for the victims of the UPS Worldport plane crash. The main presentation was from Transportation Cabinet Commissioner Bobby Joe Lewis on the Local Assistance Road Program/County Priority Projects Program (LAARP/CPP), which was implemented under House Bill 546 and now requires rehabilitation projects to restore roads to original condition, cap funding at $500,000 per project, use a new scoring matrix, include a local match, and submit one photograph per 300 feet of project length. He reported that the 2026-2027 cycle ran from June 1 to October 1 and drew 1,215 project applications from 107 counties and 106 cities, with total submitted project costs of about $121.1 million and about $102.3 million requested after local match. He also said 30% of submissions scored 10s and 22% scored 9s, and that the list of requests and required photos had been submitted to the General Assembly and LRC.
Members asked about how scores change over time, whether roads can move from lower scores to 10s, and whether the new process gives a better picture of local needs. Lewis said scores can change based on weather and road conditions, but the new system provides more information and a more standardized evaluation than before. Several members raised concerns about the volume and size of required photographs, suggesting drone footage or video as an alternative; Lewis said the photo requirement has caused confusion and large file uploads, and he was open to considering easier ways to document conditions. Members also discussed continuity in scoring across districts, and Lewis explained that district staff appointed by chief district engineers use a handbook and scoring matrix, with the scores entered into a computer system so evaluators do not see the final score while scoring.
The committee also discussed funding levels and carry-forward balances for the program. Lewis said the program began with $20 million authorized in HR92, noted underruns from completed projects, and reported a carry-forward amount that had grown to $355,432.42 available for reauthorization as of October 13. In response to questions, he said the current process concentrates applications into a short window, with 63% of applications arriving in the last few days and 417 on October 1, which created a heavy workload but was completed on time. The meeting then moved to multimodal funding priorities, with Jennifer Kersner of Kentuckians for Better Transportation introducing herself and offering condolences for the UPS aviation incident before beginning her remarks.
CA
California 2025-2026 Regular Session
Senate Budget and Fiscal Review Subcommittee No. 2 on Resources, Environmental Protection and Energy Mar 5th, 2026
Transcript Highlights:
- And so while it's a great program and districts already do as much as they can with upgrading through
- And so while it's a great program and districts already do as much as they can with upgrading through
- Upgrades are needed to improve air quality, lower long-term energy costs, reduce emissions, and benefit
- We agree that the reason the funding remains is due to the premature upgrades in schools.
- Hi, good afternoon, Chair Grushina Mohobe. beer with upgrades in schools.
Summary:
The Senate Budget Subcommittee No. 2 on Resources, Environmental Protection and Energy heard presentations on six budget-related issues and took no votes; all items were held open for a future hearing. The first item concerned funding for the California Transmission Accelerator Revolving Fund under SB 254 and Proposition 4. GoBiz and IBank requested nearly $26 million over five years and 10 limited-term positions to evaluate and finance eligible transmission projects. The LAO said the proposal was broadly consistent with Prop. 4 but noted many implementation details remain unresolved. Senators questioned how the program would lower ratepayer costs, how funds would be protected, and whether the full requested amount was necessary; the administration said the financing strategy is still being developed and that consultants are needed.
The committee then discussed trailer bill language to redirect $22 million in General Fund money from the DEPA program to DSGS for summer 2026, and to use roughly $70 million in CalSHAPE interest for ratepayer relief through ELRP or an equivalent program in 2027-28. CEC and CPUC staff said DSGS and ELRP are reliability tools, not PSPS programs, and explained that DSGS had enrolled over 1,000 MW and was expected to have about $52 million available for 2026. Senators and the LAO raised concerns about ending a successful DSGS program, the complexity of transitioning customers to ELRP, and whether CalSHAPE funds should instead continue school HVAC and plumbing projects. Public commenters largely supported extending CalSHAPE and continuing or expanding DSGS rather than shifting funds to ELRP.
The subcommittee also heard on petroleum market oversight under SBX1-2 and ABX2-1. The CEC and its Division of Petroleum Market Oversight requested about $1.67 million and a small permanent staffing increase to implement new inventory, resupply, and market analysis duties. Senators pressed the agencies on gasoline price spikes, refinery maintenance, price gouging, and the status of the transportation fuels transition plan, which staff said would be released in draft form soon. Public testimony supported DPMO’s work and called for continued oversight of gasoline pricing.
Finally, the CPUC presented three additional budget proposals: resources to implement AB 1207’s changes to the California climate credit, funding for a study of large electrical loads such as data centers under SB 57, and staffing for AB 825’s regional market participation requirements. The LAO said the AB 1207 request may go beyond the statute and urged the Legislature to decide whether it wants a simpler or more complex climate credit redesign. Senators questioned the cost of the work, the need for ongoing staffing, and how ratepayer interests would be protected. The CPUC said the work is needed to adapt to changing load patterns, electrification, data center growth, and potential regional market participation. Public commenters also supported DPMO funding, CalSHAPE, and DSGS, and some urged the Legislature to keep DSGS at the CEC rather than shift funds to ELRP.
CA
California 2025-2026 Regular Session
Assembly Local Government Committee Mar 25th, 2026
Local Government
Transcript Highlights:
- owns a water system that faces groundwater contamination issues and requires urgent infrastructure upgrades
- However, due to the system's small size, the city cannot afford to finance these upgrades without at
- However, under current law, Requires urgent infrastructure upgrades.
- However, due to the system's small size, the city cannot afford to finance these upgrades without at
- We've got literally no capital funding available for these upgrades or repairs.
Committee:
House Local Government
NH
Transcript Highlights:
- Send in your stuff, and perhaps they’ll upgrade you.
- Send in your stuff, and perhaps they’ll upgrade you.
- Send in your stuff, and perhaps they’ll upgrade you.
- Send in your stuff, and perhaps they’ll upgrade you.
- Send in your stuff, and perhaps they’ll upgrade you.
Committee:
Senate Transportation
MA
Massachusetts 2025-2026 Regular Session
Joint Committee on Revenue Jun 21st, 2026 at 01:00 pm
Joint Committee on Revenue
Transcript Highlights:
- program, where we just closed financing for a $1.29 million loan for a 200 kW solar array and roofing upgrades
- program where we just closed financing for a $1.29 million loan for a 200 KW solar array and roofing upgrades
- 2020, totaling over $650 million in retrofits for things like windows, insulation, conservation upgrades
- , solar generation and storage, and even wind. ...insulation, conservation upgrades, solar generation
- and storage, and even wind and flood resiliency upgrades.
Committee:
Joint Joint Committee on Revenue
Summary:
The Joint Committee on Revenue held a hearing on several housing-related bills, with chairs Adrienne Madaro and James Eldridge framing the discussion as part of the Legislature’s broader response to the state’s housing crisis and noting that many of the bills build on the 2024 Affordable Homes Act. The chairs reviewed hearing procedures, including the three-minute oral testimony limit, the option to submit written testimony, and the hybrid format. No votes were taken during the hearing.
Testimony began with support for H. 3278, a bill to create a graduated deed excise tax for affordable housing. Representative Worel argued that higher-end real estate transactions should contribute more to fund affordable housing production, saying the measure would not burden working families and would help address racial inequities in homeownership and displacement. Representative Soder then supported H. 3247, which would promote redevelopment of abandoned buildings through expanded tax incentives for renovating vacant properties for sale or rent, arguing that it would bring blighted units back into use and generate future tax revenue.
The committee also heard testimony on H. 3040/S. 1969, residential improvement or R-PACE legislation. Robert Giles of Home Run Financing and Nicole Steele of Amalgamated Bank described the program as a voluntary, assessment-based financing tool that could help homeowners pay for energy efficiency, resilience, and other major repairs without upfront costs, and said it could complement existing Mass Save programs while expanding access to more homeowners. In contrast, Judith Lieben of the Massachusetts Law Reform Institute opposed H. 3039/S. 1946, the Housing Development Incentive Program bill, arguing it would expand subsidies for market-rate and luxury housing in Gateway Cities instead of directing resources to low-income renters. Representative Hawkins also testified in support of H. 3121, which would end large investor control of homes in Massachusetts by imposing an excise tax on large owners of small residential properties and using the revenue for first-time homebuyer down payment assistance. After testimony and a few member questions, the chairs asked whether anyone else wished to testify and then adjourned the hearing.
LA
Transcript Highlights:
- and $24.4 million to DCFS for technology. ...MCO adjustment, $24.4 million to DCFS for technology upgrades
- to DOTD for road projects. $22.2 million for public safety expenses, including major repairs and upgrades
- safety facilities and funding for state police and regional crime labs. $15.8 million for system upgrades
- management system, $5 million for a new permitting system, and $4 million to Wildlife for system upgrades
- critical services. $3.7 million to various higher education institutions for projects like facility upgrades
Committee:
House Appropriations
Summary:
The House Appropriations Committee met on April 13, 2026, and considered the main budget bills for fiscal year 2026-27. Members heard a broad overview of House Bill 1, the general appropriations bill, including the governor’s proposed budget, major funding items for education, workforce, corrections, health, and economic development, and a plan to use surplus funds to pay down LASERS’ unfunded liability. The committee discussed a 29-page amendment set that shifted savings from retirement and other areas into one-time expenditures, including FEMA Katrina debt, LSU, firefighter pay raises, crime victim reparations, rehabilitation services, and additional school choice support. Questions focused on the MFP per-pupil adjustment, the crime victim reparations shortfall, LSU funding, waiver slots, and whether the bill remained at a standstill overall. The committee adopted the amendments and reported HB 1 favorably as amended, making it Special Order No. 1 for April 16.
The committee then took up House Bill 312, the supplemental appropriations bill, which also redirected the full $144.3 million surplus payment to LASERS and used savings from MFP, Medicaid forecast changes, and other reductions to fund statewide initiatives. Those included LED, corrections, DOTD road projects, public safety, IT modernization, school safety, firefighting equipment, community and technical college workforce programs, and DCFS shortfalls. Members raised questions about mental health funding and the retirement payment strategy; the amendments were adopted and HB 312 was reported favorably as amended and set as Special Order No. 4. House Bill 313, the funds bill, was amended to make additional deposits into the State Emergency and Response Fund, Voting Technology Fund, oil and gas regulatory funds, geological storage, reading enrichment, Imagination Library, and conservation accounts; it was reported favorably as amended and set as Special Order No. 5. House Bill 314, the revenue sharing distribution bill, received amendments inserting fiscal year 2027 distribution numbers and was reported favorably as amended and set as Special Order No. 7.
The committee also advanced House Bill 383, the ancillary expenses bill, which covers self-generated, dedicated, and federal funds for agencies such as Group Benefits, Risk Management, Prison Enterprises, and Technology Services; a technical amendment updated accounting-standard references, and the bill was reported favorably as amended and set as Special Order No. 6. House Bill 983, the judiciary budget, was amended with a technical date correction and reported favorably as amended; members discussed funding for judges, staff pay, FINS, and whether pending legislation affecting Orleans Parish judges would later change the budget. House Bill 1126, the legislative branch budget, was reported favorably without amendment after brief questions about the Law Institute increase, and HCR 3, the hospital stabilization formula resolution tied to Medicaid hospital reimbursements, was reported favorably and set as Special Order No. 8. The committee also made HB 983 Special Order No. 9 and HB 1126 Special Order No. 10 for April 16, authorized technical corrections on adopted amendments, and adjourned after the chair thanked members and staff for their work.
LA
Transcript Highlights:
- $24.4 million to DCFS for technology... ...MCO adjustment, $24.4 million to DCFS for technology upgrades
- to DOTD for road projects. $22.2 million for public safety expenses, including major repairs and upgrades
- safety facilities and funding for state police and regional crime labs." "$15.8 million for system upgrades
- management system, $5 million for a new permitting system, and $4 million to Wildlife for system upgrades
- critical services." "$3.7 million to various higher education institutions for projects like facility upgrades
Committee:
House Appropriations
FL
Florida 2026 4th Special Session
January 28, 2026 - 01:00 PM
Transcript Highlights:
- As part of the report, Florida State Parks conducted an analysis of repair and maintenance and upgrades
- Over the next 10 years, DEP identified nearly $759 million in projects to repair, maintain, and upgrade
- Every ten years, the Florida Park Service upgrades the unit management plans for each state park through
- You have 70-year-old bathrooms at one park that need to be upgraded.
- this is an opportunity to get those boots-on-the-ground reports on where there are potentials for upgrades
CA
Transcript Highlights:
- How would the HOA not have, like what's the path by which an un-upgraded electrical issue would still
- ,’ and the homeowner doesn’t do that upgrade, is that still not sufficient to mitigate the concerns of
- So my question had to do with if there was an upgrade that needed to be done with the electrical system
- , who’s responsible to upgrade that system, the electrical system within that unit?
- You know, you need to upgrade this system, you need to do this thing, your water system is going to be
Committee:
Senate Housing