Video & Transcript Research : 'large load customer'
Page 9 of 500
ND
North Dakota 2026 1st Special Session
Artificial Intelligence and Data Center Committee Jul 15th, 2026 at 09:00 am
Artificial Intelligence and Data Center Committee
Transcript Highlights:
- So all of those terms and conditions of service for any electric customer, including large loads like
- large load growth can cause rates to go up.
- I'm setting aside data centers—any large load development, new manufacturing... ...with any large load
- And you look at those large load customers and what they bring.
- Are we okay by having multiple entities regulating large load customers being allowed to come into or
MN
Minnesota 2025-2026 Regular Session
House Energy Finance and Policy Committee 4/1/25
Energy Finance and Policy
Transcript Highlights:
- from uh super integrating the new loads from uh super large<00:04:49.919>
data <00:04:50.680>< - These voluntary tariffs allow large power rate class customers to procure additional renewable energy
- And in fact, if regulated thoughtfully, the arrival of additional large customers could help pay for
- um when we're putting such a large um when we're putting such a large energy<00:47:47.839>
load - for these large for these large customers. customers. customers. will<01:15:05.600>
because
Keywords:
water appropriation, data centers, environmental review, energy conservation, permit application, carbon-free energy, geothermal energy, renewable energy, Macalester College, appropriation, sustainability, solar energy, pollinator programs, license plates, agrivoltaics, environmental sustainability, 1183, house
ND
North Dakota 2025-2026 Regular Session
Energy Development and Transmission Committee Jul 22nd, 2026
Transcript Highlights:
- But now the same group of people are creating this war on large load customers.
- load customers, whether it's a fertilizer plant at 100 megawatts or a soybean crop... ...large load
- load customer?
- But I would like to think that we're chasing all sorts of large load customers.
- the customers when you come with a new large load customer?
Summary:
The committee met at the Coteau Freedom Mine in Mercer County, approved the June 2 minutes, and heard an overview of the mine from Coteau Properties president Andrew Hawbaker. He described the Freedom Mine as the largest lignite mine in the United States, supplying coal to Dakota Gasification, Antelope Valley Station, and Leland Olds Station. He emphasized the mine’s scale, safety record, reclamation work, workforce needs, community involvement, and economic impact, including payroll, taxes, royalties, scholarships, and local hiring. Members asked about how long land stays in production, how quickly it returns to agriculture after reclamation, labor shortages, and how mining affects groundwater and water wells. Hawbaker said most tracts are mined for about three to five years, reclamation is coordinated with landowners, and the company continues to struggle to find electricians, welders, mechanics, operators, and engineers.
The committee then heard from Public Service Commission Chairman Randy Christman on coal mining reclamation and permitting. He reviewed North Dakota’s coal mining history, the state’s reclamation laws, federal Surface Mining Control and Reclamation Act primacy, bonding, permit renewals and revisions, prohibited mining areas, inspection and enforcement, and contemporaneous reclamation requirements. Christman stressed that North Dakota’s program is professional and thorough, with frequent inspections, financial assurance, and a 10-year revegetation monitoring period before bond release. He also discussed federal coal ownership issues that can delay mine plans, the treatment of prime farmland, and how reclamation differs for wind and pipelines. In response to questions, he said one challenge is sometimes releasing land too soon before long-term compaction issues are fully understood, and he noted that data centers do not currently have a comparable reclamation model because they typically own the land.
In the afternoon, the committee received an update from Lignite Energy Council president Jonathan Fortner on the lignite industry. He said North Dakota’s lignite sector supports five commercial power plants, four mines, about 12,000 direct and indirect jobs, and more than $5.5 billion in economic activity, while helping keep the state’s electricity rates among the lowest in the nation. Fortner reviewed coal severance and conversion tax revenues, the lignite research fund, federal regulatory rollbacks, carbon capture policy, and the industry’s legal costs fighting federal rules. He also highlighted a study on large-load development, saying new data centers and critical mineral processing facilities could create major local tax revenue and help justify new baseload generation. Members asked whether new gas pipelines would crowd out coal plant development and whether the economic study included jobs and broader local impacts; Fortner said the industry sees room for both and that the study did include construction, operations, jobs, and tax effects.
MN
Transcript Highlights:
- In addition to the power premium, these voluntary tariffs allow large power rate class customers to procure
- Data centers to the state, and in fact, if regulated thoughtfully, the arrival of additional large customers
- And there are several large customers, Google being one of them, that are proposing to do 24/7 tracking
- And when we're putting such a large energy load like data centers on our system at a time when we're
- We have a significant challenge in meeting this energy demand for these large customers because we need
Keywords:
water appropriation, data centers, environmental review, energy conservation, permit application, carbon-free energy, geothermal energy, renewable energy, Macalester College, appropriation, sustainability, solar energy, pollinator programs, license plates, agrivoltaics, environmental sustainability
ND
North Dakota 2025-2026 Regular Session
Artificial Intelligence and Data Center Committee Jul 15th, 2026
Transcript Highlights:
- So all of those terms and conditions of service for any electric customer, including large loads like
- So all of those terms and conditions of service for any electric customer, including large loads like
- I'm setting aside data centers, any large load development, new manufacturing, with any large load development
- And you look at those large load customers and what they bring.
- Are we okay by having multiple entities regulating large load customers being allowed to come into or
Summary:
The committee held its first meeting on artificial intelligence and data centers, established a quorum, and heard introductory remarks from Majority Leader Hogue and the chair about the committee’s charge. Members said the goal was to build a factual foundation on AI, hear from experts and stakeholders, and develop practical North Dakota-focused recommendations rather than simply produce a large volume of bills. Legislative Council also reviewed interim committee rules and procedures before the informational presentations began.
Staff and NCSL presenters then gave overviews of AI concepts and the state and federal policy landscape. The background memo and presentations covered AI categories and terms, state laws in areas such as consumer protection, algorithmic discrimination, deepfakes, chatbots, children’s safety, health, education, and government use, as well as data center siting and economic impacts. NCSL described a growing number of AI bills introduced and enacted across the states, with comprehensive laws in places like Utah, Colorado, Texas, California, and Illinois, and noted recurring issues around transparency, privacy, liability, and protections for minors.
A major focus of the discussion was federal preemption and the tension between state regulation and national AI policy. NCSL said a recent White House executive order and related federal framework seek a light-touch, innovation-friendly national standard, with possible challenges to state laws and possible funding conditions tied to compliance, though no broad federal preemption has yet been enacted. Members asked about Commerce Clause concerns, industry pushback, oversight models, and whether AI policy is bipartisan; presenters said the issue cuts across party lines, with broad agreement on child safety and deepfake restrictions but more disagreement on broader regulatory approaches. No votes or formal actions were taken at the meeting, and the committee recessed briefly for technical issues during the second presentation.
ND
North Dakota 2026 1st Special Session
Artificial Intelligence and Data Center Committee Jul 15th, 2026
Artificial Intelligence and Data Center Committee
Transcript Highlights:
- So all of those terms and conditions of service for any electric customer, including large loads like
- but large load growth can cause rates to go up.
- And you look at those large load customers and what they bring.
- And you look at those large load customers and what they bring.
- Are we okay by having multiple entities regulating large load customers being allowed to come into or
Summary:
The committee held its first meeting on artificial intelligence and data centers, establishing its purpose as a study and policy-development body rather than one aimed at producing many bills. Majority Leader Hogue urged members to move quickly, focus on federal and other states’ AI laws, consider possible federal preemption, child protections, and the siting and economic impacts of data centers. Committee leadership echoed that the goal is practical, balanced governance that protects North Dakota while allowing innovation to continue.
Legislative Council staff provided a background memo and NCSL presented a detailed overview of AI concepts and the current state legislative landscape. The presentations distinguished narrow AI, generative AI, agentic AI, and theoretical AGI/ASI, and summarized major state policy themes: comprehensive AI laws in states such as Utah, Colorado, Texas, California, and Illinois; targeted laws on deepfakes, chatbots, health, education, notifications, and digital likeness; and growing use of appropriations and agency inventories. Members asked about Colorado’s repeal and reenactment, Texas’s sandbox and training provisions, oversight structures, and whether AI regulation is bipartisan; presenters said most issues cut across party lines, with broad agreement on child safety and deepfakes but more division on broader regulatory approaches.
The federal update focused on executive orders, preemption, and congressional activity. NCSL described a White House framework favoring a single federal standard, a DOJ litigation task force, Commerce Department review of state laws, and possible funding conditions tied to state AI policy, though no formal state-law challenge had yet occurred. The presentation also covered a recent executive order creating a voluntary federal vetting process for advanced frontier models after safety concerns, and congressional proposals including a failed 10-year state moratorium, Senator Blackburn’s child-safety bills, the Kids Online Safety Act, a House-passed children’s digital safety package, a Senate data center moratorium proposal, and a House ratepayer/data-center bill. The committee took no formal action beyond receiving testimony and asking questions.
MN
Minnesota 2025-2026 Regular Session
Public utilities to develop and implement a virtual power plant program 2/24/26
Minnesota House Floor Meeting
Transcript Highlights:
- from 5,000 customer batteries and EVs. from 5,000 customer batteries and EVs.
- Sometimes for larger loads, the demand response is even someone calling someone at a large site and saying
- One challenge in meeting the energy demand of these large customers will be the ability to bring on generation
- large customers will be demand of these large customers will be the<00:10:30.320>
ability <00: - . customers. customers.
Summary:
Representative Craft presented House File 2986, as amended with the DE6, and asked that it be laid over for possible inclusion. He described the bill as an affordability measure centered on virtual power plants, explaining that aggregating distributed energy resources such as solar panels, batteries, EVs, smart thermostats, heat pumps, and water heaters can help utilities reduce peak demand and avoid costly generation and distribution investments. He said the bill would require utilities to reduce system peak through a virtual power plant program by 5% by the end of 2028 and 10% by the end of 2032, using an independent third-party RFP process, with plans incorporated into integrated resource planning and a savings clause if requirements prove infeasible.
Testimony in support came from the Department of Commerce, Vote Solar, Solar United Neighbors, Kite Rocket, and Mincia. Supporters said virtual power plants can function like grid-scale resources, lower spot-market and peak costs, improve reliability and resilience, and make better use of existing distribution infrastructure. Commerce said the approach fits an all-of-the-above strategy and noted consumer protections in the bill, including standards for contracts, disclosures, dispatch frequency, notice, opt-out, and compensation. Several supporters cited estimates of significant savings, including a national DOE estimate of 10% to 20% of peak load by 2030 and a Minnesota-specific estimate from Solar United Neighbors of about $63.5 million in savings if 10% of peak demand were met with VPPs in 2030.
Committee members raised questions about how much cheaper VPPs are than peaker plants and whether utilities, especially Xcel Energy, are already implementing similar programs. Representative Baker expressed concern that the bill could move faster than the technology or market would naturally develop and asked about the risk of forcing utilities into a mandate before the economics are fully proven. In response, a Solar United Neighbors witness pointed to a fact sheet and Brattle Group-based analysis comparing VPP costs and benefits in Xcel territory, while an Xcel representative said the company has been discussing the bill with Representative Craft for months. The bill was laid over for possible inclusion, and no final vote on the bill itself was taken in the transcript.
TX
Transcript Highlights:
- generator. and large, large loads type risk of behaviors in aggregation.
- And the definition of a large load is 75MW. So that brings in a lot of traditional industrial load.
- That includes the large load forecasting, large load interconnection standards, net metering, and transmission
- OPEC has also had some success on the large load interconnection standards.
- Yes, it should, and I think it will as we get the rules for this large load standard, large load interconnection
Summary:
The Senate Committee on Business and Commerce convened to discuss critical infrastructure and supply chain integrity, particularly focusing on Texas's power grid and associated vulnerabilities. The meeting highlighted Texas's recent ranking as 10th in electricity affordability, emphasizing the state's commitment to maintaining a reliable and resilient electric grid. New committee members introduced themselves, and the agenda included testimony from ERCOT and the Public Utility Commission regarding the implementation of the Lone Star Infrastructure Protection Act, which aims to mitigate risks posed by foreign entities to the power grid.
Chad Sealy from ERCOT presented updates on the attestation process for market participants, revealing that over 1,500 entities had submitted attestations regarding their corporate structures and affiliations with designated foreign countries. Concerns were raised about the adequacy of the current vetting process, particularly regarding indirect relationships with foreign adversaries. Testimonies from the PUC and the Attorney General's office underscored the challenges of enforcing compliance and the need for improved legislative measures to enhance oversight and security.
The committee also heard from experts, including Dr. Emma Stewart from Idaho National Laboratory, who discussed the evolving threats to the grid from foreign adversaries and the importance of securing communication systems. Recommendations included prioritizing inspections of critical components and enhancing collaboration with national laboratories to address vulnerabilities. The discussion concluded with an acknowledgment of the balance needed between ensuring grid security and maintaining affordability for consumers.
TX
Transcript Highlights:
- generator and large load type risk of behaviors.
- They'll be over the large load threshold.
- And the definition of a large load is 75 megawatts.
- That includes large load forecasting, large load interconnection standards, net metering, and transmission
- OPUC has also had some success on the large load interconnection standards.
TX
Transcript Highlights:
- generator 3058 and large, large loads type risk of behaviors in aggregation. 3059 and large, large loads
- They'll be over the large-load threshold.
- That includes the large load forecasting, large load interconnection standards, net metering, and transmission
- That includes the large load forecasting, 5573 large load interconnection standards, net metering and
- This large load standard, large load interconnection standard, is going to apply a set of requirements
Summary:
The Senate Committee on Business and Commerce held its first interim hearing on securing critical infrastructure and supply chain integrity, with a focus on Texas’s electric grid and the Lone Star Infrastructure Protection Act. The chair also highlighted Texas’s relatively low electricity prices and welcomed new committee members. ERCOT, the Public Utility Commission (PUC), and the Attorney General’s office were invited to explain how the state screens market participants and grid equipment for ties to China, Russia, Iran, and North Korea, and how the agencies respond to noncompliance.
ERCOT testified that it has implemented the requirements of three related Senate bills by requiring attestations on corporate affiliations and on critical grid equipment and services. ERCOT said it has processed thousands of attestations, used additional requests for information and third-party verification tools such as Dun & Bradstreet, and terminated nonresponsive market participants. ERCOT also said it has not seen a case requiring direct Attorney General involvement, but it does refer matters to the PUC when needed. The PUC said it can investigate suspected violations and impose penalties of up to $1 million per violation per day, and that most investigations into late or missing attestations have been resolved through compliance, market exit, or removal by ERCOT. The Attorney General’s office said its role is currently limited to audits and court involvement, and that it lacks broad independent investigatory authority under the act.
Members pressed the panel on whether the current system is too reliant on self-reporting and whether it adequately addresses indirect foreign influence, especially through supply chains for batteries, inverters, transformers, and other equipment with routable connectivity. ERCOT acknowledged that the current attestation process has gaps and said it plans to refine definitions of critical grid equipment and grid services, improve information requests, and continue stakeholder rulemaking. The panel also discussed possible legislative changes, including tying prohibitions to the Department of Defense Section 1260H list and the Texas Prohibited Technologies list, clarifying warranty and service access, and expanding the statute to cover grid services more directly. Several senators raised concerns about cost, reliability, and the extent to which foreign-sourced components remain embedded in Texas infrastructure, while others suggested incentives for domestic manufacturing and stronger verification tools, including possible work with national labs such as Sandia.
CA
California 2025-2026 Regular Session
Assembly Utilities and Energy Committee Jul 16th, 2025
Transcript Highlights:
- customers, 110% for PG&E customers.
- for SoCal Edison customers, 110% for PG&E customers.
- So there's a large part of the bill on wildfire spending.
- new customer load to be powered up sooner without overloading the distribution grid.
- that new load online.
Summary:
The committee heard several energy and water affordability bills, with extensive testimony on SB 254 by Senator Becker, SB 541 by Senator Becker, SB 453 by Senator Stern, SB 292 by Senator Caballero, and SB 473 by Senator Padilla. SB 254 was presented as a broad utility affordability package addressing short-term climate credits, a Power Fund, tighter scrutiny of rate increases and utility profits, wildfire spending, securitization of future utility costs, and streamlining. Supporters, including TURN and several environmental and public power groups, said it could lower bills and reduce long-term costs; opponents from investor-owned utilities, labor, business, and local government raised concerns about market impacts, insufficient analysis, and the breadth of the bill. The committee approved SB 254 on a 6-3 vote and placed it on call.
SB 541 focused on load flexibility and using existing grid capacity more efficiently. Senator Becker described it as a transparency and planning measure to identify cost-effective load shifting and reduce peak demand, while supporters said it could improve resiliency and save money. Several CCAs and utilities opposed the bill in print or unless amended, arguing that some language implied a mandate and that the concept needed more cost-effectiveness analysis; the author said amendments would remove language dividing the state goal among retail suppliers and clarify that the bill is not a procurement mandate. The committee passed SB 541 as amended to Appropriations on a 9-1 vote and left it on call.
SB 453 by Senator Stern would return unspent ratepayer-funded microgrid program dollars and was described as a way to keep the lights on and redirect unused funds. It drew support from local government and environmental groups, with PG&E expressing concern about how the bill would affect its ability to spend awarded funds. The committee passed SB 453 as amended to Appropriations on a 12-0 vote. SB 292 by Senator Caballero would require more granular outage and reliability reporting, including census-tract-level data, to better inform resilience planning after PSPS events; utilities opposed unless amended, citing duplicative reporting and regulatory overlap, but the bill passed 12-0 to Appropriations.
SB 473 by Senator Padilla would require or expand water utility decoupling to promote conservation and affordability. Supporters, including water utilities, labor, business, and local government groups, argued decoupling stabilizes revenue, supports conservation, and can keep rates lower for low-use customers. The Public Advocates Office opposed, saying prior pilot data showed no conservation benefit and about $1 billion in added costs, and that the CPUC had already rejected similar requests. Committee members questioned the conservation and capital-investment effects of the different rate structures; the author and supporters argued decoupling helps utilities fund infrastructure while allowing lower fixed charges for low-use customers. The transcript ends during that discussion, before a final vote on SB 473 is shown.
TX
Transcript Highlights:
- Slide number eight also looks at large loads.
- Regarding load growth, a lot of it is driven by large loads.
- We're talking about gigawatt-sized loads – 1 gigawatt, 2 gigawatts, large, large loads like that.
- It's primarily, a lot of it's large load. And Senator King is working on a large load bill.
- We're talking about gigawatt-size loads—one gigawatt, two gigawatts. Large, large loads like that.
FL
Florida 2025 Regular Session
February 5, 2025 - 09:00 AM
Transcript Highlights:
- There are processes in place for such a large load to pay for contributions in aid of construction, because
- Although data centers bring a large load and would be sales for the utility, once they are up and running
- Also, while data centers do bring a large load and would be sales for the utility, once they are up and
- Also, while data centers do bring a large load and it would be sales for the utility, really once they
- Also, while data centers do bring a large load and it would be sales for the utility, really once they
Summary:
The committee heard introductory remarks from Chair LaMarca and members, then received presentations on electric utility planning, transportation infrastructure, and broadband deployment. Public Service Commission staff explained how Florida’s utilities plan for reliability and cost through 10-year site plans, demand forecasting, and economic dispatch. The presentation emphasized Florida’s residential-heavy load, growing EV demand, expanding solar and battery storage, continued reliance on natural gas combined-cycle plants, and the role of nuclear power. Members asked about energy efficiency, rates, renewable options beyond solar, cybersecurity, grid resilience, data centers, and small modular nuclear reactors; the witness said efficiency programs are reviewed every five years, utilities must balance reliability and affordability, and large new loads like data centers generally must pay for their own infrastructure needs.
Department of Transportation Secretary Jared Perdue described FDOT’s five-year work program, decentralized district structure, and funding mix, noting that the agency is predominantly state-funded and prioritizes maintenance and preservation before expansion. He highlighted record investment levels, major congestion-relief projects, toll-road revenues, seaport and airport partnerships, spaceport investments, workforce and equipment needs, and emerging technology such as advanced air mobility. Members asked about project timing, MPO planning, rail and ferry funding, airport governance, winter storm preparedness, and flooding/sea-level rise; Perdue said faster delivery depends on resources, local governments lead transit operations with FDOT as a capital partner, and coastal and drainage projects are designed around storm surge and resiliency.
The Office of Broadband reported on six grant programs supporting infrastructure, community facilities, digital connectivity, and future digital capacity and broadband expansion. Director Leo Garcia said the office has awarded hundreds of millions of dollars across most counties, leveraged significant private investment, and focused heavily on rural areas. He noted that broadband efforts are intended to support telehealth, education, workforce development, and economic growth, and said the state has reduced the number of unserved locations from more than 400,000 to a projected 170,000 after current awards are completed. He also said the office needs additional budget authority for the upcoming digital capacity program and that the larger federal/state broadband deployment program will be used to reach remaining unserved and underserved areas.
KY
Kentucky 2025 Regular Session
Interim Joint Committee on Natural Resources and Energy (11-6-25)
Transcript Highlights:
- not so much of a large data center, but if you're over 250 megawatts in load, what you need to do is
- that goes with large industrial loads and what it can mean to lose those loads.
- we<01:07:12.480>
certainly large industrial loads and we certainly large industrial loads - Big Rivers experienced that with the loss of a large smelter load.
- Uh also upfront large smelter load.
Keywords:
Meeting Start 00:00:00
Attendance Roll Call 00:00:10
Approval of Minutes 00:01:19
Helping Power Kentucky's Growth (LG&E/KU) 00:01:39
Update from Kentucky's Electric Cooperatives 00:47:35, 958, all
Summary:
The committee met with a quorum, approved the minutes from the previous meeting, and then heard a presentation from LG&E and KU representatives Caroline Clark and John Bevington on economic development, energy demand, and the utility’s role in supporting Kentucky’s growth. Bevington described the company’s service territory, generation fleet, and recent economic development activity, including 76 projects supported in 2024, more than $2.8 billion in private investment, and over 3,000 new jobs. He emphasized that data centers are now the dominant driver in the pipeline, with 22 data center projects representing about 8.7 of the 9.7 gigawatts of potential demand, alongside other manufacturing and commercial projects.
A major focus was how data centers choose sites and how utilities respond. Bevington explained that hyperscale data centers typically approach utilities first because they need transmission-level access, and that utilities then conduct internal analyses, estimate infrastructure needs, and require financial security before proceeding. He said the company is working through formal transmission studies and long-lead infrastructure planning, and noted that Kentucky’s sales tax exemption for data centers helped attract interest. He also outlined the economic benefits of data centers, citing an announced Louisville project of 525 megawatts and about $11 billion in investment, with an estimated $500 million in new tax revenue over 10 years, plus broader job and GDP impacts.
Members asked about whether data centers could generate their own power, the reliability of the pipeline numbers given confidentiality and nondisclosure agreements, and cybersecurity concerns. Bevington said the company does not assume all pipeline projects will materialize in Kentucky and instead assigns probabilities to avoid overbuilding. He also said he was not the right person to address cybersecurity in detail but offered to return to a committee focused on IT or security. In response to questions about future supply, he said LG&E and KU are adding generation through a 120-megawatt solar facility in Mercer County, a 120-megawatt solar purchase in Marion County, and a 645-megawatt natural gas combined-cycle plant in Louisville, with PSC approval recently granted for additional generation and related system upgrades.
CA
California 2025-2026 Regular Session
Assembly Utilities and Energy Committee Jun 24th, 2026
Utilities and Energy
Transcript Highlights:
- And so you're not looking to assign the cost of new transmission to these new large load users.
- load demand customer we're talking about.
- We look at large load consumers, and that's why we set out that framework.
- , to that single customer who’s going to be the large user here.
- There's just one customer, but it's as large as one of our largest cities in the country.
CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 4 on Climate Crisis, Resources, Energy, and Transportation Apr 9th, 2025
Transcript Highlights:
- for incremental load reduction.
- customers for reducing incremental loads.
- Basically, we provide incentives to electricity customers to reduce their load during these key times
- They have increased costs, but they also have new customers. Customers come online.
- So residential customers today with batteries can't.
Summary:
The hearing was an informational budget session on energy agency proposals, with no votes taken. Early discussion focused on Proposition 4 climate bond implementation, including funding for demand-side grid support, offshore wind development, and transmission financing. The Department of Finance said the budget includes allocations for demand-side grid support and offshore wind, but not yet for the $325 million transmission financing piece pending a required study. The Legislative Analyst’s Office urged the Legislature to consider whether to wait on offshore wind funding, whether to keep shifting funds into demand-side grid support, and how to direct future transmission financing. Members also raised concerns about local technical assistance for offshore wind, Salton Sea priorities, and the need for more information before final decisions.
The California Energy Commission and CPUC then reviewed the broader energy package. The CEC highlighted the demand-side grid support program’s growth, distributed energy backup assets, long-duration storage, hydrogen grants, and the SIRP clean energy reliability program. CPUC testimony emphasized affordability, wildfire mitigation costs, rooftop solar cost shifts, and efforts to reduce rates while maintaining reliability and clean energy goals. Members questioned CPUC staffing, delays in proceedings, coordination with the CEC and CAISO, and the impact of rate increases on customers. The agencies also discussed the AB 3264 transmission financing study, with CPUC saying work on the study had already begun and was on track for the July 1 deadline.
Several trailer bill and implementation items were also discussed. The committee reviewed a proposal to extend the Deaf and Disabled Telecommunications Program surcharge, with members split over whether it should be handled in budget trailer bill language or policy legislation; the administration said the surcharge supports a critical program serving about three-quarters of a million Californians. The committee also heard a CPUC data-sharing proposal to allow nondisclosure agreements for transmission and reliability data, which members generally supported as a technical fix. DWR explained a proposal to clarify language for the Electricity Supply Strategic Reliability Reserve so it can potentially sell three gas-fired units it owns, and the CEC presented a federal transmission grant proposal tied to grid-enhancing technologies and ratepayer cost recovery. Finally, the committee discussed California Lifeline and possible broadband pilot reforms in light of uncertainty around federal Universal Service Fund support, with CPUC saying it is exploring a statewide standalone broadband option for eligible customers.
NH
New Hampshire 2025 Regular Session
House Science, Technology and Energy (04/07/2025)
Science, Technology and Energy
CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 4 on Climate Crisis, Resources, Energy, and Transportation Apr 9th, 2025
Transcript Highlights:
- for incremental load reduction.
- The program success in offering incentives to customers for reducing incremental loads.
- Incentives to customers for reducing incremental loads. Okay, so the success of the program so far.
- We provide incentives to electricity customers to reduce their load during these key times.
- to reliably serve their customers.
CA
California 2025-2026 Regular Session
Assembly Utilities and Energy Committee Jun 24th, 2026
Transcript Highlights:
- And so you're not looking to assign the cost of new transmission to these new large load users.
- load demand customer we're talking about.
- We look at large load consumers, and that's why we set out that framework.
- , to that single customer who’s going to be the large user here.
- There's just one customer, but it's as large as one of our largest cities in the country.
Summary:
The committee first heard SB 804, the Hydrogen Pipeline Safety Act, from Senator Arreguín. He said the bill would designate the State Fire Marshal as the safety regulator for intrastate hydrogen pipelines and require hydrogen-specific standards, while not mandating any pipeline construction or bypassing environmental review. Supporters included labor groups, utility employees, and the City of Burbank, while Air Products opposed unless amended, citing concerns about the bill’s specificity, fee structure, and the need for a hydrogen-specific rulemaking process. The committee discussed safety, fees, and regulatory certainty, and later passed SB 804 on a 9-0 vote to Emergency Management with commitment to take amendments.
The committee then took up SB 905 by Senator Becker, aimed at reducing electricity rates by changing utility incentives. The bill would tie part of executive compensation to keeping rates below inflation, require more performance metrics, and allow the CPUC to consider lower returns on equity for certain lower-risk investments and alternative financing options. Support came from consumer, environmental, agricultural, and large energy user groups, while Southern California Edison, CalChamber, PG&E, and utility labor groups raised concerns that the bill could reduce investment, create regulatory uncertainty, and raise borrowing costs. After extensive discussion about utility affordability, wildfire costs, and capital markets, the committee passed SB 905 on a 7-1 vote to Appropriations.
SB 913, also by Senator Becker, would create a clearer pathway for distributed energy resources such as batteries and smart thermostats to participate in the resource adequacy market and compete with utility-scale resources. Supporters said the bill would better use existing grid capacity, lower costs, and build on the state’s Demand Side Grid Support Program; PG&E opposed unless amended, saying the use case was not yet proven and was already being addressed in other rulemakings. After the committee accepted amendments, one opposition group moved to neutral and another said it might do so after reviewing the changes. The bill passed 8-0 to Appropriations and was placed on call.
Several other measures were heard and advanced, including SB 1196 on faster utility hookups for small energization projects such as ADUs and EV chargers, SB 931 reauthorizing the Diablo Canyon Essential Services Mitigation Fund through 2028, SB 1158 reducing the frequency of joint reliability assessments from quarterly to twice yearly, and SB 1245 directing further study of California’s gasoline market and potential use of non-CARBOB fuel during supply disruptions. SB 1196 and SB 931 both passed with broad support and no opposition after amendments, SB 1158 passed without testimony, and SB 1245 drew strong support from consumer and environmental advocates but opposition from fuel industry and business groups concerned about costs, confidentiality, and fuel standards.
CA
California 2025-2026 Regular Session
Assembly Utilities and Energy Committee May 7th, 2025
Transcript Highlights:
- Absorb the load, or do we want to have the load meaningfully show up to absorb, to build out?
- amount, megawatts, large amounts of load can help put downward pressure so everybody else.
- This load growth offers an opportunity to reduce rates for all customers.
- So load management for EVs.
- So load management for EVs.
Summary:
The committee first heard AB 1026 by Assembly Member Wilson, which would require investor-owned utilities to provide clearer front-end information and follow more consistent timelines for post-entitlement energization applications tied to housing projects. The author and supporters from the Housing Action Coalition and Mission Housing said utility delays can hold up approved housing, add costs, and create uncertainty, and they argued the bill would align utility processes with recent state efforts to streamline local permitting. PG&E and Southern California Edison opposed the bill, saying existing CPUC timelines and the ongoing energization rulemaking already address the issue, that the bill could be duplicative or premature, and that some proposed timelines were too short. The committee discussed the bill’s relationship to the CPUC’s September 2024 decision, and AB 1026 was ultimately approved on a 15-0 vote, with the consent calendar also passing.
The second half of the hearing was the committee’s annual oversight hearing on electric reliability. Representatives from the CPUC, CEC, CAISO, and DWR reviewed lessons from the 2020 and 2022 heat emergencies, emphasizing that California has since added significant resources, improved planning, and created backstop programs such as the strategic reliability reserve. They said the summer 2025 outlook is cautiously optimistic, with no expected shortfalls under traditional planning conditions and a projected surplus, though wildfire and extreme heat remain risks. The agencies also described major changes in planning and operations, including more battery storage, updated resource adequacy rules, expanded transmission planning, and reforms to the interconnection queue.
Members asked about data center load, Diablo Canyon’s future, the strategic reliability reserve, demand response, wildfire mitigation costs, affordability, and regional market expansion. Witnesses said data center demand is a major variable but can be managed through better forecasting, flexible service arrangements, and siting in areas with existing capacity; they also said firm clean resources remain valuable while planning continues around Diablo Canyon’s scheduled retirement. On affordability, they said the agencies try to balance reliability with least-cost procurement, and that new resources can lower market prices even as they require upfront investment. CAISO also highlighted the value of the Western Energy Imbalance Market and the planned day-ahead market, saying regional coordination improves both reliability and cost savings.