Video & Transcript Research : 'Committee'

Page 76 of 500
KY
Transcript Highlights:
  • Uh the first committee studying it now.
  • I infrastructure committee at the ads.
  • I'm looking at the committee<01:15:20.400> members.
  • Uh we're just getting committee members.
  • So, uh, through your committee, Senator.
Summary: The Information Technology Oversight Committee met with a quorum, approved the prior meeting minutes, and then heard a presentation from Leadcore representatives Jimmy Bird, Mike Murray, and Rebecca Moss on the Kentucky Wired network. Leadcore described its role as the design-builder and service provider under the KCNA contract, saying the network was built with roughly 13,200 feet of fiber, mostly aerial, and that the use of non-armored cable was a Kentucky-side decision made to reduce cost. They also said aerial construction and non-armored cable increase maintenance challenges, including storm damage and squirrel-related damage, and reported FY25 service activity of 104 break-fix events, 30 maintenance replacements, 64 storm-damage events, and nearly 13,000 feet of fiber replaced to date. Committee members questioned whether the original project anticipated this level of replacement and whether any forecast existed for maintenance under non-armored cable. Leadcore said it did not do a formal forecast and could not say whether the replacement rate was above or below norms, though it acknowledged the decision not to use armored cable came from the Kentucky side of the contract. Members also asked about whether replacements caused network degradation; Leadcore said it tries to replace cable at existing splice points to avoid degradation and, where needed, uses armored cable for replacement sections going forward. The committee then explored Leadcore’s relationship with Excel and KCNA. Leadcore said it has a service-level agreement for KCNA-related fibers but not for dark fibers used by Excel, and that Kentucky Wired fibers get priority on service requests. It said outages are reported through a 1-800 number and that it was not aware of any access problems to the huts. On the tech refresh, Leadcore said its understanding is that maintaining the network is its responsibility, but the technology refresh is not; it said only a very limited amount of refresh has occurred and that this did not match the original contract intent. Leadcore also said it had not been asked to defer maintenance. The chair closed by saying the testimony would inform a committee report and that he intended to recommend clawing back or withholding some previously authorized Kentucky Wired and refresh funding until an audit is complete, with the committee to vote on a report later.