Video & Transcript Research : 'facility construction'
Page 68 of 500
ND
North Dakota 2026 1st Special Session
Budget Section Human Resources Division Jun 24th, 2026 at 01:00 pm
Transcript Highlights:
- We have McCarthy Construction on site.
- The space in its entirety is fully encapsulated by the construction team.
- McCarthy Construction initiated that demo, as I just touched on, last Monday.
- This is where we are with construction to show you that vantage point.
- So we start with an assessment of each facility.
Summary:
The committee was called to order, the roll was taken, and the March 18 minutes were approved. Members then received several project and program updates, beginning with CHI St. Alexius’s behavioral health buildouts in Bismarck, Williston, and Grand Forks. St. Alexius reported that the Bismarck project remains on track for June 2027 completion, with demolition underway and final design work nearing completion. Williston reported construction is progressing, staffing recruitment is underway for psychiatrists and other staff, and an air handler replacement is creating a roughly $750,000 unbudgeted barrier that will slightly delay the timeline. Grand Forks reported its expansion is about 30% complete, with no major barriers beyond weather, and leaders said the project should be substantially complete in the first quarter of 2027.
The Department of Health and Human Services then presented a series of budget and program updates. Donna Ockland explained several recent line-item transfers as technical corrections that net to zero and do not require new spending, then reviewed salaries, wages, and FTE counts, noting the department remains within its authorized staffing levels. Pat Rainer followed with an update on the Rural Health Transformation Program, saying 12 opportunities have been posted, 422 applications received, and $8.4 million obligated so far, with a goal of obligating the full $199 million by September. He described grants for workforce retention, rural rotations and housing, community gardens, school wellness, behavioral health promotion, safety net services, equipment, technology, EMS, and other initiatives, emphasizing that the program is intended to be transformational and tied to metrics.
Members asked extensive questions about how rural eligibility is defined, how grants will support both rural facilities and hub hospitals, and how future years of funding will build on current awards. The committee also heard an update on certified community behavioral health clinics from Elena Zeller, who said North Dakota has been accepted as a demonstration state, implementation is underway in Williston, North Central/Minot, Fargo, and Dickinson, and care coordination and service counts are increasing. Rebecca Askins then reviewed SNAP payment error rates, saying the 2025 rate was finalized at 9.89%, with the state aiming to get below 6% through policy updates, training, data tools, and a quality assurance team. Members pressed her on the causes of the error rate, the role of the SPACES software system, and the need for accountability and improvements. Finally, Dirk Wilkie reported the state laboratory project reached substantial completion on June 12 and is on budget at about $69.95 million, though a service elevator had to be redesigned because it was too small for equipment.
KY
Kentucky 2026 Regular Session
Senate Standing Committee on Appropriation and Revenue. (1-28-26)
Transcript Highlights:
- And then typically in every budget there is an authorization for the School Facilities Construction Commission
- <00:19:56.960>
construction for the school facilities construction for the school facilities - And so, working with KCTCS to construct and program the facility there at North Point to become a model
- . facility. facility.
- national highway cost construction national highway cost construction index. index. index.
Summary:
The committee met to hear a presentation from Dr. Hicks on the governor’s recommended budget for the next biennium. He reviewed the revenue outlook, noting modest general fund growth, a large rainy day fund balance, and the impact of recent income tax reductions. He said the budget was built around recurring reductions, lower debt service and retirement contribution rates, and the use of excess restricted funds, while protecting K-12 education, Medicaid, postsecondary education, public safety, and pension obligations.
Dr. Hicks outlined several major spending and reserve proposals, including $350 million from the Department of Insurance’s excess restricted funds to support Medicaid in the first year, $150 million for the affordable housing trust fund, $125 million for rural hospitals, $100 million to offset lost federal ACA premium tax credits, $75 million for utility assistance, and $50 million for food assistance. In education, the proposal included a phased pre-K for all plan funded by sports wagering tax revenue, a 3% annual salary increase for full-time school personnel, continued full funding of teacher pensions, a 2.5% annual increase in SEEK base funding, and additional support for career and technical education and school facilities.
He also discussed Medicaid cost pressures, including higher managed care, pharmacy, behavioral health, and nursing facility costs, and explained the expected effects of federal HR1 changes on Kentucky’s Medicaid program. Those changes include work and community engagement requirements and more frequent eligibility redeterminations for expansion members, which the administration estimated would reduce enrollment by about 4,300 in the first year and 28,000 in the second year. No votes or formal committee actions were taken during the meeting, which was limited to the budget presentation and member questions.
NM
New Mexico 2025 Regular Session
IC - Legislative Finance Nov 21st, 2025
Transcript Highlights:
- It was also created when construction costs were much more affordable.
- costs, adequacy standards, and best practices of building our facilities.
- By 2023, the average cost to construct school facilities was 695 per square foot, with some projects
- And we can't afford to replace facilities.
- We have to think about facilities.
ND
North Dakota 2026 1st Special Session
Government Finance Committee Jun 25th, 2026
Government Finance Committee
Transcript Highlights:
- Fall of '27, we're opening up the women's facility.
- The state laboratory was constructed. Since that 2020 plan, the state laboratory was constructed.
- When state facilities do not participate in the local building process, permitting, When state facilities
- For the other facilities, the schools, the facilities that are 50-plus people, bars, restaurants, daycares
- They inspect state facilities as hundreds of thousands of square feet of state facilities around the
Summary:
The committee first received a general fund and revenue update from the Office of Management and Budget. Staff reported that the state started the biennium about $176 million above prior estimates, but year-to-date revenues were now running below legislative forecast, mainly due to lower individual income tax and sales tax collections. The budget stabilization fund was above its cap, the legacy fund continued to grow, and oil revenues were slightly above forecast overall. Members also asked about federal funding uncertainty and mineral leasing variability, and OMB said agencies would be asked to address potential federal reductions case by case during budget preparation.
The committee then reviewed compliance reports and trust fund analysis materials, followed by a bill draft for a fixed-route city transportation grant program. Testimony from transit officials in Fargo and Minot supported the proposal, saying state aid would help match federal transit funds and support operations, but members raised questions about the funding source, fare structures, and whether the program should be limited to the current four fixed-route cities or allow future eligible cities. Several members asked for more time to study the formula and possible funding options before moving the bill forward.
Next, the committee approved a bill draft repealing obsolete language related to a proposed North Dakota-South Dakota bi-state authority. Staff explained the provision had been unused for about 30 years and that existing law likely already allowed joint powers agreements without the specific language. The committee voted to adopt the repeal bill draft.
The Department of Commerce and the Northern Plains UAS Test Site then provided an update on uncrewed aircraft system initiatives, including the Vantis radar data enclave, the drone replacement program, and future revenue models. Officials said North Dakota had received FAA approval to operate the radar data pathfinder, had begun replacing non-compliant drones from restricted foreign sources, and was working on phased procurement and cost-recovery plans. Members asked about deadlines, funding, supply-chain issues, and how the system would be used; staff said the federal restrictions were already in effect and that Vantis was being positioned as infrastructure for future beyond-visual-line-of-sight operations.
Finally, the Department of Corrections and Rehabilitation presented on the design of a new minimum-security prison and on a reentry housing task force. The new facility is planned for the penitentiary grounds, with a reduced estimated cost of about $263 million, 600 beds initially, possible expansion to 732 beds, and completion projected around 2031 if funded in 2027. The reentry housing task force described a data-driven effort to identify housing needs for people leaving incarceration, with the goal of reducing homelessness and recidivism through targeted housing support and possible subsidies. Members asked about staffing, site selection, housing duration, and whether employment and transportation needs would be included in the assessment.
KY
Kentucky 2025 Regular Session
Capital Projects and Bond Oversight Committee (2-25-25) - Upon Adjournment of both Chambers
Transcript Highlights:
- containers to serve as the facility containers to serve as the facility kitchen<00:11:59.279>
- replacing the aging facilities in Priority Area 3.
- replacing the aging facilities in Priority Area 3.
- replacing the aging facilities in Priority Area 3.
- system and the design and construction system and the design and construction components<00:18:20.679
Keywords:
00:01 Call to Order and Roll Call
00:30 Approval of Minutes
00:59 Information Items
03:34 Finance and Admin Cabinet
12:31 KY Infrastructure Authority
21:47 Office of Financial Mgmt
23:27 Adjournment, 958, all
Summary:
The committee first handled informational reports on several bond and lease matters, including school district and board of education debt-service items, upcoming revenue bond issues in Henderson and Jessamine counties, and three advertised lease-space requests for state agencies. Members also reviewed prior lease transactions that had not been approved in November and December; the Finance and Administration Cabinet later canceled and rebid the Harlan County lease and moved ahead with the Perry County lease modification. Additional information items included a Kentucky Communications Network Authority quarterly capital projects report and Eastern Kentucky University asset preservation revisions.
The committee then heard from Deputy State Budget Director Janice Thomas on four action items. She reported a $2.85 million USDA-funded renovation at Kentucky State University’s Betty White Building, a $294,000 increase for the Kentucky School for the Deaf’s Middleton Hall renovation, and a $6.1 million restricted-funds scope increase for the KCTCS Science Building Expansion in Elizabethtown. Members asked about how often the statutory 15% increase authority is used for school dormitory and cottage projects and about the competitiveness of construction bids; Thomas said bids are typically competitive but recent estimates have been difficult because of higher material and equipment costs. The committee approved the three action items unanimously and also received a no-action report on a $3.918 million Corrections project to repair and replace the KCIW kitchen drain line.
Next, the Kentucky Infrastructure Authority presented seven loans and grants, all of which the committee approved unanimously. The package included sewer and water projects for Frankfort, Sturgis, Scottsville, Morganfield, Western Pulaski County Water District, and Springfield, plus an emergency $5.487 million Kentucky Waters grant for Eddyville after a catastrophic sewer plant failure and weather-related emergency declarations. The projects covered wastewater interceptor and treatment upgrades, sewer collection rehabilitation, water transmission main installation, and planning/design work, with loan terms ranging from five to 30 years and interest rates from 0.5% to 2.25%.
Finally, the committee considered a $38.4 million Kentucky Housing Corporation conduit issuance for a 322-unit multifamily rental project in Jefferson County. A member asked how the committee participates in the transaction, and staff explained that it is a conduit issuance and not state debt. The committee then moved to approve the issuance.
TX
Transcript Highlights:
- Strategic facilities planning, asset management, design, construction, operation, maintenance. and leasing
- projects we also support and maintain minor construction and renovations to ensure existing facilities
- The one under construction or one that's already built? Yes, the one under construction.
- The major cost, sir, is really the construction.
- Is that executed, however, by the Facilities Commission?
ND
North Dakota 2026 1st Special Session
Budget Section Human Resources Division Jun 24th, 2026
Transcript Highlights:
- We have McCarthy Construction on site.
- The space in its entirety is fully encapsulated by the construction team.
- McCarthy Construction initiated that demo, as I just touched on, last Monday.
- Construction to show you that vantage point.
- So we start with an assessment of each facility.
Summary:
The committee met with a quorum, approved the March 18 minutes, and then received a series of updates on major health-related projects and programs. CHI St. Alexius representatives reported progress on behavioral health buildouts in Bismarck, Williston, and Grand Forks, including demolition and construction milestones, staffing plans, and timelines. The Bismarck project remains on track for completion in June 2027 with about $346,500 spent to date. Williston reported construction underway, a $750,000 unbudgeted air handler replacement, active recruitment for psychiatrists and other staff, and a projected substantial completion in early 2027. Grand Forks reported about 30% completion, weather-tight status expected in August, and continued staffing ramp-up as the facility expands from its current 24-bed operation.
The Department of Health and Human Services then reviewed a set of technical line-item transfers, emphasizing that they were administrative corrections with no net change in funding. The department also walked through the Salaries and Wages Block Grant and FTE counts, noting overall staffing remained within appropriated limits and that behavioral health staffing had increased. Members asked about vacancies, consultant use, and the mix of in-state versus out-of-state expertise for the Rural Health Transformation Program. HHS said it had posted 12 funding opportunities, received 422 applications, obligated $8.4 million so far, hired 26 people, and was preparing additional grant rounds and a CMS budget submission. The department said the program is structured around workforce, prevention/healthy living, care closer to home, and technology/data, with ongoing stakeholder engagement and community forums.
The committee also heard on the certified community behavioral health clinic implementation plan, SNAP payment error rates, and the state laboratory project. HHS said CCBHC certification is being implemented in four regions—Williston, Minot/North Central, Fargo/Southeast, and Dickinson/Badlands—with care coordination expanding and baseline data still being collected. On SNAP, the department reported a 2025 payment error rate of 9.89%, acknowledged cost impacts under HR1, and said it is using training, system changes, and pre-authorization quality checks to reduce errors toward a 6% target over the next 6 to 12 months. Finally, Public Health reported the state laboratory reached substantial completion on June 12, with total costs at $69.95 million of the $70 million budget, though a service elevator issue will require a new lift to be added using contingency funds.
MN
Transcript Highlights:
- Not much money considering the age and number of facilities with today’s construction costs.
- The good news is the state never has to pay 100% of our facility construction and maintenance costs.
- Not much money considering the age and number of facilities with today’s construction costs.
- <00:36:21.680>
construction pay 100% of our facility construction pay 100% of our facility - To complete construction of facilities.
Summary:
The committee first approved the March 3, 2026 minutes by voice vote. It then heard a presentation from the Minnesota Zoo on its aging facilities and bonding needs. Zoo staff highlighted the zoo’s economic and educational role, its 1.4 to 1.5 million annual visitors, and its Free to Explore program, while stressing that many of its 50-year-old buildings are in poor condition, with more than $78 million in backlog and safety concerns for visitors, staff, and animals. The zoo said the governor recommended $4 million for critical life-support systems and asked for an additional $6 million in asset preservation to renovate the original animal hospital building so a new hospital wing can function properly. Testimony emphasized that the renovation is necessary for staff space, storage, code compliance, asbestos removal, and safe animal care, and described recent injuries and close calls tied to outdated facilities.
Members asked questions about porcupine quills, natural predators, and the meaning of the zoo’s incident rate. Zoo staff explained that quills are not poisonous but are barbed and can be difficult to remove, and that predators include larger cats, owls, and fishers. On incidents, staff said they include close calls and injuries linked to aging infrastructure, such as a tiger reaching farther through a wall after fencing shifted over time, and staff injuries during animal procedures in older spaces. Members also confirmed that the hospital project has shifted from a standalone building to a wing attached to the existing hospital because of rising construction costs.
The committee then heard from Perpich Center for Arts Education. Perpich described its statewide role as both a public high school and an arts education resource center, serving students and educators across Minnesota. It said it hosted 313 events last year for nearly 2,000 educators and administrators and worked with 275 school districts across all 67 Senate districts. Perpich emphasized that nearly seven in 10 students rely on its residential programs because there are no comparable arts high school options in greater Minnesota, and noted strong student outcomes including a 100% graduation rate and national recognition as an exemplary school. For capital needs, Perpich said it received $1.26 million last year for HVAC and building automation work, is grateful for the governor’s recommended $1.3 million this year, and requested $6 million to create a secure, accessible main entrance and upgrade outdated restrooms to ADA compliance.
MN
Transcript Highlights:
- Phase one encompassed the north, east, and south portions of the facility with the design and construction
- But 25 years post-construction of this facility, we simply cannot afford to stand still.
- But 25 years post construction<01:28:38.000>
of <01:28:38.320>this <01:28:38.560>facility - ,<01:28:39.440>
we <01:28:39.679>simply construction of this facility, we simply construction - And beyond construction, the workers who maintain these facilities will be paid family-sustaining wages
KY
Kentucky 2025 Regular Session
Capital Projects and Bond Oversight Committee (9-23-25)
Transcript Highlights:
- current military unified facilities current military unified facilities criteria<00:05:34.639>
facility construction commission bonds. facility construction commission bonds.facilities. - We have the four school facility construction commission bonds.
- We have the four uh school facility<00:39:19.119>
construction <00:39:19.680>commission
Keywords:
00:01 Call to Order and Roll Call
01:49 Approval of Minutes
02:06 Information Items
03:48 Project Rpt from Finance and Admin Cabinet
14:38 Lease Rpt from Finance and Admin Cabinet
18:50 OFM – Ky Infrastructure Authority
26:40 OFM – Cabinet for Economic Development
31:50 Office of Financial Management
40:40 Remaining 2025 Meeting Dates
41:25 Adjournment, 958, all
Summary:
The meeting opened with prayer and a quorum call, then the committee approved the prior meeting minutes. Staff reported several informational items, including University of Kentucky medical and research equipment purchases, school district debt issues, leasehold improvements, and Kentucky Community and Technical College System bond allocations.
The committee then approved a line-item appropriation increase of $350,000 in federal funds for the Department of Fish and Wildlife Resources’ Cumberland Forest Conservation Program, along with two Department of Military Affairs projects: the Ashland Readiness Center window replacement and the MATES HVAC replacement at Fort Knox. It also approved four larger maintenance-pool projects without further action: HVAC and smoke evacuation work at the Kentucky State Penitentiary, HVAC and hot water tank replacements at Oakwood, a Green Bank energy-savings performance project across state facilities, and roof replacement at Lake Barkley Lodge. Members asked about the prison project, the roof procurement process, and whether minority-owned firms receive special bidding preference; staff said capital projects are awarded through open low-bid procurement with qualification and warranty requirements, and that minority participation is preferred but not a bidding criterion.
Two lease modifications were approved for Franklin County agencies: an expansion and renovation for the Auditor of Public Accounts and a downsizing and renovation for the Kentucky Workers Compensation Funding Commission. The committee also approved Kentucky Infrastructure Authority items, including a Monticello sewer loan, several Cleaner Water Program grants and reallocations, and a House Bill 1 water grant that required no action. Members questioned engineering costs and were told the KIA board reviews technical details and anomalies before approval.
Finally, the committee approved six economic development grants: one EDF grant for V Simple in Jefferson County and five KPDI EDF grants for projects in Breckinridge, Erlanger, Todd, and Washington counties. The last action item was approval of Western Kentucky University’s up-to-$10 million general receipts revenue bond issue for athletic facilities. An informational Kentucky Housing Corporation multifamily bond item prompted concern from members about rising per-unit costs for affordable housing, and they requested further explanation from the housing corporation at a future meeting.
WA
Washington 2025-2026 Regular Session
JLARC – Joint Legislative Audit & Review Committee Jul 15th, 2026
Transcript Highlights:
- to a community facility.
- First is to encourage new construction of data centers and encourage refurbishment of existing facilities
- First is to encourage new construction of data centers and encourage refurbishment of existing facilities
- In terms of encouraging new construction and refurbishing existing facilities, the Department of Revenue
- And on construction jobs, it's a little bit better. It's $186,000 per construction job.
Summary:
The committee met on July 15, 2026, but initially lacked a quorum, so it could not adopt prior minutes. Chair Jerry Pollett welcomed new member Senator Victoria Hunt and new JLARC staff, and noted national recognition for recent JLARC reports. The meeting then moved into a series of preliminary audit presentations and an agency strategic management update, with committee members asking questions after each item.
JLARC presented a preliminary audit of DCYF’s Juvenile Rehabilitation programs. Staff concluded that crowding, staffing shortages, weak risk assessments, and inconsistent programming combine to create unsafe conditions. The report found that most youth are housed in two large secure facilities operating near or above capacity, incidents rise as population rises, 47% of frontline staff leave within a year, current assessment tools are not valid for the population, and program access depends more on facility than individual need. JLARC made one recommendation to the legislature to address crowding and seven to DCYF, including improving retention, training, incident response procedures, validated assessments, program alignment, and data quality. DCYF Secretary Ross Hunter said the agency agreed overcrowding is a serious problem, described ongoing efforts to improve staffing and safety, and said a detailed response would be provided later. Committee members raised concerns about education access, retaliation against staff or youth who participated in the audit, and whether JR-25 has helped or worsened conditions.
JLARC then presented a preliminary audit of Labor and Industries’ enforcement of farm worker labor laws. The audit found that L&I generally meets inspection timelines for health and safety complaints, but not for wage and hour or retaliation complaints, where delays are driven largely by time before assignment to an investigator. Staff said complaint volume exceeds capacity, though the agency has added staff, created screening processes, and reorganized workloads, and 2026 legislation now allows prioritization of complaints and broader investigations. JLARC recommended that L&I report back in December 2026 and December 2027 on backlog reduction and implementation of the new law. An L&I representative said the agency is hiring additional staff and will provide a formal response later. The committee also received a JLARC overview and Department of Health strategic management plan update on hospital data reporting, inspections, complaints, and adverse event reporting. DOH reported measurable progress on inspection compliance, new staffing and licensing systems, translated complaint forms, and plans for future work on language access, adverse event reporting, and financial data dashboards.
After lunch, JLARC began its 2026 tax preference performance reviews. The first review covered the Main Street tax credit, which JLARC said has helped increase the number of Main Street communities and businesses, with positive growth near designated districts; JLARC recommended continuing the preference and improving business-count data. The second review covered the equitable access to credit program, which JLARC said appears to support underserved communities by funding loans through CDFIs; JLARC recommended continuing the preference beyond its 2027 expiration. The committee began questions on the program mechanics and the role of the Community Reinvestment Act, and the presentation was still underway when the transcript ended.
MN
Transcript Highlights:
- Min Minneapolis Sports Facilities Min Minneapolis Sports Facilities Authority.<00:00:57.120>
- , charged with the design, construction, charged with the design, construction, and<00:03:10.319>
- Bank Stadium. facilities, US Bank Stadium is the only facilities, US Bank Stadium is the only facility
- think uh this is a stateowned facility. think uh this is a stateowned facility.
- long-term maintenance of the facility. long-term maintenance of the facility.
MN
Minnesota 2025 1st Special Session
House Energy Finance and Policy Committee 2/13/25
Energy Finance and Policy
KY
Kentucky 2025 Regular Session
Capital Projects and Bond Oversight Committee (2-25-25) - Reupload
Transcript Highlights:
- kitchen while the uh permanent facility kitchen while the uh permanent kitchen<00:11:56.440>
is - project the original loan was facility project the original loan was approved<00:13:35.720>
by - replacing the aging facilities in Priority Area 3.
- replacing the aging facilities in Priority Area 3.
- rental facility of approximately 322 units located in Jefferson County, Kentucky.
Summary:
The committee first approved the January minutes and then received several informational reports on school district tax levies, revenue bonds, lease advertisements, and previously rejected lease transactions. Members were told that one rejected lease for the Cabinet for Health and Family Services in Hardin County would be canceled and rebid, while a Perry County lease modification for the Energy and Environment Cabinet would proceed. The Kentucky Communications Network Authority also submitted its quarterly capital projects report, and Eastern Kentucky University reported revisions to asset preservation projects.
Janice Thomas, Deputy State Budget Director, presented four capital project action items. These included a Kentucky State University Betty White Building renovation funded by USDA grant money, a Department of Education state schools dormitory and cottage renovation appropriation increase because bids exceeded estimates, a restricted-funds scope increase for the Elizabethtown CTC science building expansion, and a pool project report for the Department of Corrections’ KCIW kitchen drain line repair and replacement. Representative Petrie asked about how often the statutory authority for midstream project increases is used and whether bids are typically competitive; Thomas said the increases are used often when bids come in above estimates and that bids are generally competitive, though construction costs have been difficult to gauge. The committee unanimously approved the first three action items, and the KCIW project was reported with no action required.
H. Sandy Williams of the Kentucky Infrastructure Authority then presented six loans and one emergency grant. The items included loans for Frankfort’s East Frankfort Interceptor wet weather facility project, Sturgis wastewater improvements, Scottsville inflow and infiltration work, Morganfield wastewater treatment plant planning and design, Western Pulaski County Water District transmission improvements, and Springfield water system planning and replacement work, plus an emergency Kentucky Waters grant for Eddyville following a sewer treatment plant failure and local emergency declarations. After no questions, the committee unanimously approved the seven KIA transactions.
Chelsea Couch then presented a Kentucky Housing Corporation conduit issuance for $38.4 million to finance a multifamily rental project in Jefferson County; members asked how the committee participates and were told it was a conduit issuance rather than state debt. The committee approved that item. Finally, the committee heard an informational Turnpike Authority refunding issuance of about $53 million for present value savings, then approved four SFCC debt issues for Henderson, Pulaski, Scott, and Trimble counties to finance school renovations and construction. The meeting ended with notice of the next meeting date and location.
WY
Wyoming 2026 Regular Session
Select Committee on School Facilities Interim Topics Meeting, March 5, 2026
Transcript Highlights:
- Welcome to the Select Committee on School Facilities.
- <00:02:27.920>
department with the state construction department with the state construction - student be able to use these facilities. student be able to use these facilities.
- <00:05:14.880>
out <00:05:15.120>there facilities out there facilities out there um<00: - um, in inappropriate facilities as well. um, in inappropriate facilities as well.
Summary:
The Select Committee on School Facilities met to satisfy its quarterly statutory requirement and to discuss interim priorities. Staff from LSO reviewed the committee’s duties: monitoring K-12 school facilities statewide, prioritizing needs for the interim, and preparing a budget request due by November 1. They also noted the ongoing litigation related to the Chapter 3, Section 8 exception process and said the committee would move forward with securing a consultant to study that issue, as previously authorized by Management Council.
A major topic was school funding formulas, especially how average daily membership (ADM) affects routine and major maintenance funding and how excess square footage is treated. Members revisited an earlier proposal to fund 135% of allowable square footage, which did not advance this session, and discussed whether some schools should instead be funded at a minimum percentage of their actual square footage. Staff explained that some districts have buildings larger than their formula allowance, and that the issue is complicated by older buildings, pools, and other unique facilities. They also noted that recent changes to the major maintenance multiplier increased funding and that some districts are still not fully covered by the formulas.
Safety and security funding was another focus. The State Construction Department reported that $10 million was appropriated this year for safety and security upgrades, with some funds expected to go toward vestibules, bollards, and design work, and the rest through a district application process. Officials said the last comprehensive safety assessment was done more than 10 years ago and suggested a new consultant-led study to update priorities, since technology and building conditions have changed. Members also discussed the role of school resource officers and whether the committee should continue leading this work rather than handing it off to the recalibration committee.
The committee also examined declining enrollment and excess capacity across the state, citing examples such as Newcastle, Shoshoni, Casper, Campbell County, and Fremont County. Officials said some districts are right-sizing by taking schools offline, while others cannot easily reduce capacity because the buildings are essential to the community. Charter school leasing was raised as a related concern, including the Mills charter school and the fact that the state pays lease costs based on ADM and allowable square footage. No formal votes were taken, but the committee agreed to continue studying these issues, likely including site visits and further data requests during the interim.
HI
Hawaii 2025 Regular Session
FIN Info Briefing - Mon Jan 6, 2025 @ 9:00 AM HST
Hawaii House Floor Meeting
Transcript Highlights:
- The first one is construction.
- good shape the first one is Construction good shape the first one is Construction Construction<00
- Then our plans get pushed back, and the cost of the facility due to construction escalation costs are
- facility due to construction<04:46:18.480>
exhalation <04:46:19.120>costs <04:46:19.920 - , two to the small facilities, one to the larger facilities.
Summary:
The Committee on Finance held its first informational briefing for 2025, beginning with member introductions and then hearing an economic outlook presentation from Dr. Eugene Tian of the Department of Business, Economic Development and Tourism. Dr. Tian said Hawaii’s economy was in relatively good shape in several areas, especially construction, which he described as at a historical high, with construction employment above 40,000 monthly and building permit values and contracting tax base both up sharply. He also noted real estate sales had rebounded in 2024, the labor market had stabilized with unemployment around 2.9%, and initial unemployment claims were below 2019 levels. At the same time, he highlighted challenges including inflation running above the national rate, a shrinking labor force, lower employment compared with 2023, and continued weakness in visitor spending and arrivals. He said future growth would likely come from health care, professional services, construction, tourism recovery, and diversified sectors such as renewable energy, aquaculture, creative industries, and technology.
Dr. Tian also discussed Hawaii’s economic structure and recovery, saying the state remains more concentrated in a few industries than the U.S. overall, with government and hospitality making up larger shares of the economy. He said non-tourism sectors had recovered, but tourism-related jobs and output were still below pre-pandemic levels, with Maui and the visitor industry still affected by the wildfire and COVID-19 impacts. He projected tourism and non-agricultural wage and salary jobs would not fully recover until 2027, and said population trends remain a concern because of aging, the likelihood of deaths outpacing births in coming years, and reliance on in-migration. After his presentation, the chair said questions would be taken later and the committee took a short break.
After the break, Dr. Carano of the Hawaii Executive Director’s office presented a second outlook, saying Hawaii’s economy in 2025 looked better than 2024 overall, though he emphasized substantial uncertainty tied to the incoming federal administration. He said possible changes to tariffs, tax policy, immigration, and federal spending could raise inflation and keep interest rates higher than previously expected, which would affect housing, consumer debt, the dollar, and Hawaii’s visitor industry. He noted that U.S. visitors account for roughly three-quarters of visitor spending in the state, making federal policy especially important. He also said deregulation could be a long-term positive but would not likely have much effect in 2025 or 2026. As an additional risk, he pointed to bird flu and its effect on livestock, poultry, and egg prices. No votes or formal actions were taken during the briefing.
MS
Mississippi 2026 Regular Session
Appropriations - Room 216, 20 January, 2026; 2:30 PM
Appropriations
Transcript Highlights:
- Construction is underway.
- <00:16:08.240>
Construction hallin facility for cattle. - Construction hallin facility for cattle. Construction is<00:16:09.120>
underway. - Uh, phase one is a cattle handling facility. So it's a handling facility.
- the construction process? the construction process?
Summary:
Mississippi State University officials testified in support of the university’s separately funded agricultural, forestry, and veterinary units, emphasizing their economic impact, research output, and need for continued state support. Keith Cobalt, vice president for the Division of Agriculture, Forestry and Veterinary Medicine, said the division generates a $1.7 billion impact on Mississippi, but warned that state and local funding has not kept pace with federal dollars or inflation. He argued that global competition, especially from China and Brazil, is hurting row crop and forestry producers, and highlighted a Vision 2030 study finding about $10 billion in agricultural and forestry value leaves the state through value-added processing. He also raised concerns about rural depopulation and proposed rural innovation hubs to help retain population and jobs.
Nick Frank, dean of the College of Veterinary Medicine, said state appropriations make up about 25% of the college’s operating budget and are needed to support salaries, staffing, and service capacity. He described the college’s education, diagnostic, and clinical missions, including disease surveillance and responses to threats such as avian influenza, screwworm, and equine herpes virus. Frank said the college is expanding facilities with $18 million in 2024 state funding for a new farm animal hospital and cattle handling facility, but still needs additional support for equine and small animal renovations. He also requested support for rural veterinary scholarships and said inflation and salary competition from other schools and private practice are making retention difficult.
In response to committee questions, Frank said the college enrolls about 118 to 119 students per class, with roughly 54 to 55 in-state students and tuition of about $29,900 for in-state and $53,000 for out-of-state students. He clarified that the “vet assistants” program is a four-year bachelor’s degree in veterinary medical technology, not a certificate. He also explained that staffing growth has largely been in the hospitals to address clinical shortages and improve care.
Dr. Westberger, dean of the College of Forest Resources and director of the Forest and Wildlife Research Center, said Mississippi’s forests support a $19 billion economic impact, 84,000 jobs, and a $4.5 billion payroll, while also providing environmental benefits. He said the college and research center are nationally recognized, including an NSF ranking placing Mississippi State 10th in natural resource conservation research expenditures for a small university. Westberger highlighted research on forest management, pest detection, mass timber, wildlife disease surveillance, and value-added bioproducts, including efforts to attract mills and manufacturing. He said Mississippi has added 10 mills or mill expansions in five years with more than $1.5 billion in investment and over 1,000 high-paying jobs, and noted the college is planning a new mass-timber annex to address capacity and showcase the material. No votes or formal committee actions were taken in the portion provided.
KY
Kentucky 2025 Regular Session
Legislative Oversight & Investigations Committee (8-29-25)
Transcript Highlights:
- As required, the design and construction of this facility was contingent on the complete transfer of
- The design and construction of this facility was contingent on the complete transfer of property and
- The<01:30:43.040>
Lynen <01:30:43.600>facility The Lynen facility The Lynen facility uh - South Carolina is constructing currently a high-acuity facility, uh, almost exactly resembling what we
- South Carolina is constructing currently a high-acuity facility, uh, almost exactly resembling what we
Keywords:
Call to Order and Roll Call- 00:00:03
Approve Minutes from July 10, 2025- 00:02:41
Statewide Emergency Responder Voice System Testimony- 00:03:38
Investment of State Funds- 00:46:13
Department of Juvenile Justice Update- 1:11:34
Adjournment- 1:54:08, 958, all
Summary:
The committee opened with roll call, welcomed a new member, approved the July meeting minutes, and then took up testimony on the statewide emergency responder voice system, also described as the state police radio system replacement project. John Hicks, secretary of the governor’s executive cabinet and state budget director, testified that the project is unusually complex because it combines multiple IT replacements, land acquisition, and tower construction. He said the existing system dates to the early 1970s and that the administration is treating the project as a priority, with work proceeding in phases and weekly coordination among the Justice Cabinet, Kentucky State Police, and Finance and Administration Cabinet.
Hicks said the project has already spent about $110 million, with nearly 1,900 portable radios acquired, microwave replacement completed at 56 sites and underway at 76 more, and routers, switches, and network upgrades addressed. He explained that because the State Police are not set up to handle real property work, the administration brought in outside real property consulting vendors through an RFP, and three vendors are now qualified to help identify and negotiate sites. He said the goal is to speed up land acquisition and tower construction while the State Police continue the technology work, and he emphasized that the project is intended to close coverage gaps for state police first and later benefit local governments and other first responders.
Members of the committee expressed concern about the project’s cost and pace. Representative Petri noted that about $218.8 million has been authorized since 2018 and questioned whether the project could stretch into 2030 or later, asking what more the General Assembly could do to help. Representative Blandon also raised concerns about the long timeline and the risk of the project becoming another costly, delayed infrastructure effort, while asking when the vendor RFP was completed and whether any sites had been acquired since then. Representative Sharp asked whether there was a detailed plan and timeline, and Hicks responded that the technology side is well defined but the property acquisition side must proceed site by site because each location depends on ownership, access, power, and other factors. Hicks said the west-to-east phasing has been a smart approach and that the executive branch should improve performance to beat the current timeline expectations.
MA
Massachusetts 2025-2026 Regular Session
Continuing Care Retirement Communities Jun 21st, 2026 at 10:00 am
Transcript Highlights:
- The pre-construction prices average 41% of the home value and post-construction 46%.
- The pre-construction prices average 41% of the home value and post-construction 46%.
- The post-construction is $440 to $1 million, and the monthly fees post-construction go from $1,900 to
- A day in a skilled nursing facility. All right. Thank you. Thank you.
- And obviously, long-term care facilities are subject to DPH as well they should be. facilities are subject
Summary:
The commission meeting focused on continuing care retirement communities (CCRCs), beginning with a presentation from Two Life Communities on its Opus Newton model, which is opening in the fall. Two Life described Opus as a middle-income, modern CCRC built around affordability, care coordination in residents’ apartments rather than separate care buildings, and resident-driven community life. Commissioners asked about financing, home care arrangements, affordability, Medicaid/MassHealth access, and the role of resident councils versus board representation. Two Life said it wants to remain within the CCRC framework, but expressed concern about proposals that would require multiple discrete care levels, impose deadlines on entrance-fee refunds, or require resident board seats.
The commission then discussed possible recommendations. There was broad support for Senate Bill 478, which would require clearer disclosure of entrance-fee refund terms in a separate document for prospective residents. On refund timing, members were divided: some favored a one-year deadline or a deadline with waivers, while others opposed a fixed deadline because of financing risks and the potential impact on new development and current residents. Several members suggested keeping the status quo but adding better data collection and reporting on refund timing. On the CCRC definition and marketing, members debated whether the current statutory definition is too vague and whether the commission should recommend clearer standards or a certification-like process, while also noting resource limits for state oversight.
Members also discussed the Age CCRC Consumer Guide, with general agreement that it should be updated and made more useful to consumers, possibly with clearer questions to ask and more information about facilities, though some cautioned against adding subjective financial-risk statements that would be hard to administer. On resident representation, several commissioners strongly supported requiring resident voting members on boards, while providers argued that strong resident associations and regular meetings with boards may be preferable and that communities should retain flexibility. The meeting ended with a request for written comments by July 11, draft recommendations to be circulated July 18, and a possible final meeting on July 21, with the commission aiming to finish by August 1.
ND
North Dakota 2025-2026 Regular Session
Budget Section Human Resources Division Jun 24th, 2026
Transcript Highlights:
- We have McCarthy Construction on site.
- The space in its entirety is fully encapsulated by the construction team.
- "Construction to show you that vantage point.
- So we'll start with an assessment of each facility.
- So we start with an assessment of each facility.
Summary:
The committee met with a quorum, approved the March 18 minutes, and then received a series of updates on health-related projects and Department of Health and Human Services budget matters. Representatives from CHI St. Alexius in Bismarck and Williston, and Altru in Grand Forks, reported progress on behavioral health expansion projects, including demolition and construction milestones, updated timelines, funding status, staffing plans, and barriers such as an unbudgeted air handler replacement in Williston. Members asked about original completion dates, use of telehealth, recruitment of psychiatrists and other staff, and whether the new beds might reduce the need for patients to travel to Jamestown State Hospital. The projects were described as on track overall, with completion expected in 2027 for the larger builds and earlier openings for some phases in Williston.
The committee then heard from HHS leadership on technical line-item transfers and the Salaries and Wages Block Grant. Donna Ockland explained that recent transfers were administrative corrections to place spending in the proper budget lines and did not involve new spending, and she reviewed FTE counts and vacancies across the department. Questions focused on behavioral health staffing changes and the use of consultants in the Rural Health Transformation Program. Pat Rainer outlined the rural health program’s first-year grants and priorities, including workforce retention, rural rotations and housing, community wellness initiatives, behavioral health promotion, safety net services, hospital equipment, suicide prevention training, technology, and EMS support. He said North Dakota’s plan was drawing positive national attention, but the department still needed to obligate roughly $199 million by September and was working with CMS on timing and compliance.
The committee also received an update on certified community behavioral health clinics from Elena Zeller. She said North Dakota had been accepted as a demonstration state, with certification efforts underway in Williston, North Central, Fargo, and Dickinson. Members asked about care coordination, service growth, staffing, and whether certification would expand to all clinics; the department said it was still collecting baseline data and evaluating impacts before making future recommendations. Finally, Rebecca Askins reviewed SNAP payment error rates, explaining that the 2025 rate was finalized at 9.89 percent and that the department is working on training, system changes, and quality assurance steps to get below 6 percent. Members pressed on the causes of monthly variability, the performance of the SPACES system, and accountability for ongoing errors, and the department said it expects improvement over the next 6 to 12 months.