OK
Oklahoma 2026 Regular Session
House of Representatives Second Regular Session of the 60th Legislature Day 49 - Morning Session Apr 29th, 2026 at 10:30 am
Oklahoma House Floor Meeting
Bills:
HR1055, SB2170, SB1833, SB1198, HR1056, SB1730, SB563, SB1379, SB1645, SB2155, SB1280, SB1455, SB1456, SB1461, SB1457, SB1463, SB1465, SB1466, SB1344, SB1309, HR1054, SB2159, SB1948, HB1371, SB1365, SB1976, SB1975, SB2026, SB1565, SB1621, SB237, SB933, SB1427, SB1642, SB171, SB1873, SB2067, SB1623, SB1771, SB1805, SB1826, SB2072, SB444, SB2184, SB1966, SB1812, SB2117, SB2135, SB330, SB1239, SB1428, SB1531, SB1484, SB1405, SB3
LA
Louisiana 2026 Regular Session
Ways and Means May 11th, 2026
Transcript Highlights:
- properly bidding state work.
- properly bidding state work.
- The project may be bid over budget, the design may be late.
- We expect reaches one through three to go to bid this year.
- So in order for us to go out to bid for the project and actually let the project bid, we use this $150
Summary:
The committee met for an informational hearing focused largely on the state capital outlay process and House Bill 2. Roger Husser and Matt Baker of the Division of Administration/Facility Planning and Control described how the office prepares and administers the capital outlay bill, said the bill has grown substantially over five years, and argued that recent changes in culture, staffing, project management, cash-flow analysis, and use of third-party support have more than doubled project expenditures and improved delivery. Members asked about the use and cost of third-party project managers, delegation of smaller projects to agencies, hiring difficulties, and whether the changes represented better interpretation of existing law versus statutory changes. Husser said some statutes were amended, some internal customs were removed, and the office would provide a list of those changes. He also explained that the office is trying to move away from overly rigid practices and toward faster project completion while still following public-bid and oversight rules.
A major portion of the discussion centered on the size and structure of the capital outlay bill, especially the gap between Priority 1 cash capacity and the much larger Priority 5 backlog. Husser said the current annual Priority 1 limit is tied to construction inflation and is about $574 million, with additional surplus funds also available, but that the bill contains far more Priority 5 funding than can realistically move in a five-year plan. He and members discussed dormant projects, scope creep, legacy projects that have sat in the bill for years, and the problem of false expectations for non-state entities. Proposed solutions included limiting Priority 5 to five times Priority 1, requiring annual re-endorsement by members, setting district or project caps for non-state projects, requiring time limits and reporting for grant-like non-state projects, placing matches in escrow, requiring design readiness before submission, and consolidating the many existing reporting requirements into one clearer report. Members also discussed bundling multiple projects under one agency project, which the House had begun piloting for LSU, UL Lafayette, Southern, and DOTD, and which Husser said could improve flexibility, reduce overappropriation, and better reflect actual spending.
Baker then explained cash-flow management and the commitment process, saying FPC now analyzes projects annually to estimate what can actually be spent in the next fiscal year and uses commitments to allow projects to proceed when future-year funding is expected. He said overappropriations can result from poor cash-flow estimates, delays, dormant projects, or projects coming in under budget, and that the office is already reworking cash-flow assumptions and reappropriating savings where possible. Members also raised concerns about change orders and low bids; staff said project managers review change orders closely, require concurrence on non-state projects, and sometimes reduce scope to keep projects within budget. After FPC’s presentation, the committee heard the beginning of Louisiana Economic Development’s capital outlay discussion, where LED explained that its projects generally fall into three categories, including the Economic Development Awards Program and Site Readiness Program, both used to support targeted economic development and job creation.
TX
Transcript Highlights:
- We have aircraft in France that are operated by the French Security Civil Order. organization.
- bids per project area.
- did not receive a bid for a fiber project. that area.
- Talking about these areas that did not receive funding, fiber bids.
- But as these awards are made and the bids are higher to include anticipated.
NH
New Hampshire 2025 Regular Session
Senate Energy and Natural Resources (02/11/2025)
Energy and Natural Resources
Transcript Highlights:
- <00:06:09.160>
you as as energy and energy security you as as energy and energy security you - differences where the resource would bid differences where the resource would bid into<00:19:11.039
- to enter into contracts and secure to enter into contracts and secure Supply<00:31:43.279>
at - were strapped into the mandatory bidding were strapped into the mandatory bidding times<00:41:56.960
- <00:42:42.000>
and market and create security and market and create security and predictability
MA
Massachusetts 2025-2026 Regular Session
Joint Committee on Education Jun 21st, 2026 at 01:00 pm
Joint Committee on Education
Transcript Highlights:
- To be frank, the process of going out to bid as a way... ...and special education transportation.
- If I shopped transportation companies outside of the bidding process, would I face the consequence?
- What I do know is that until there is a legitimate bidding process in place, we will continue to pay
- top prices and have zero... ...until there is a legitimate bidding process in place, we will continue
- We have one bid, and we have no recourse. We have to accept their price. Yeah, if I could just...
Summary:
The hearing focused primarily on H. 517/S. 314, a bill to provide a sustainable future for rural schools, and H. 697, a bill to require full funding of regional school transportation. Witnesses from rural districts, school committees, superintendents, students, and local officials described chronic underfunding, declining enrollment, high fixed costs, special education and transportation burdens, and the loss of programs, staff, and extracurriculars. Several speakers argued that rural aid should be funded at $60 million annually and made non-discretionary, while others emphasized that transportation reimbursement for regional districts has repeatedly fallen short of the state’s promise and is driving budget crises and overrides. A number of students testified in support of rural aid, describing cuts to classes, counselors, and activities, and the impact on their schools and communities. Committee members also discussed whether transportation policy should be revisited to address underlying cost drivers, including bus bidding practices and whether regional districts should have more flexibility in transportation requirements.
The committee also heard H. 515, concerning Hancock Elementary School and a school choice-related exemption from a state requirement that has created a large financial burden for the district. Hancock’s superintendent and Rep. John Barrett explained that a decades-old regulation, recently enforced by DESE, would require Hancock to pay tuition for choice-in students through high school graduation even though the district only serves pre-K through grade 6 and sends its own students elsewhere for middle and high school. They said the rule creates a significant per-student shortfall and has forced Hancock to opt out of school choice. Committee members asked for clarification about how the arrangement works and how the costs fall on Hancock.
Additional testimony supported related transportation bills for non-regional districts, especially Plymouth/Carver and North Middlesex, describing high and rising bus costs, special education and McKinney-Vento transportation expenses, and the strain on local budgets. Speakers repeatedly said that state reimbursement has not matched actual costs and that communities are being forced to choose between transportation and classroom services. No votes or final actions were taken in the hearing; the committee simply received testimony and closed the hearing on the bills discussed.
AL
Transcript Highlights:
- is not more than 5% of the low bid.
- So when you say exempt, they still have to go with the low bid.
- If it's not... ...still have to go with the low bid.
- They can go up to 5% over the low bid if it's local. Yes, sir.
- I see that, yes ma'am. ...security, I see that. Yes ma'am, you can see it back.
AZ
Arizona 2026 Regular Session
01/22/2026 - Joint Legislative Audit Committee
Transcript Highlights:
- On the requirements related to system privacy and security, we evaluated vendor-provided technical security
- I think they should all be competitively bid. So I want the record...
- The third function we tested was remote access to schools' live security cameras.
- Okay, my final question is: why aren't you Homeland Security certified?
- Department of Homeland Security as a qualified anti-terrorism technology.
Summary:
The committee opened with remarks about moving JLAC to a more frequent monthly schedule and spending more time on each audit. Members also recognized Melanie Chesney of the Auditor General’s office for 32 years of service, with several members praising her work and her role in school safety and other audits. The meeting then turned to the JLAC-directed Arizona School Safety Special Audit on interoperable communication systems, with the Auditor General’s office presenting the December 2025 report.
The audit found that the state had allocated nearly $26 million to interoperable communication efforts, but implementation varied widely. Auditors said all 14 law enforcement agencies used the money for interoperable systems, yet four agencies allowed private or tribal schools to participate contrary to statute, and several agencies failed to submit required expenditure reports. The report also found procurement problems: nine of 14 agencies did not follow procurement requirements or lacked documentation, many contracts lacked accountability provisions, and some agencies had not planned for ongoing costs. The audit estimated ongoing annual costs for an average rural county could range from about $16,000 to $382,000, and recommended that agencies document costs, follow procurement rules, monitor vendors, and plan for future funding. It also recommended the legislature clarify whether non-public schools may participate and revisit statutory system requirements that were vague or inconsistently interpreted.
Members questioned the Auditor General about vendor licensing, whether systems could be built in-house, why some functions were not configured, and whether the systems were truly usable in emergencies. The presentation explained that some systems met requirements only in part, that Mutualink had a per-user licensing model affecting access to secure text and file sharing, and that some schools were unwilling or unable to install apps or keep devices logged in. The committee also discussed the difference between the separate school safety grant program administered by ADE and this interoperability fund, and several members expressed frustration with sole-source contracting and weak documentation.
In the final portion of the presentation, auditors said only two of eight observed systems demonstrated all five critical emergency functions, while four agency systems could not be tested because they were reportedly not functioning. The committee then began hearing responses from county sheriffs, starting with the Arizona Sheriffs’ Association president, who emphasized county commitment to school safety and noted that some counties had implemented systems across multiple districts, including tribal and rural schools. No votes or formal actions were taken during the portion provided.
KY
Kentucky 2026 Regular Session
House Budget Review Sub. on Economic Development, Pub. Protection, Tourism, and Energy (1-14-26)
Transcript Highlights:
- these dams are what we call design bid these dams are what we call design bid build.<00:07:13.759
- And once those construction contract bids are in, then there's a process for choosing the winning bid
- And then the bid process, there are times when you may not even get a bid that's within the ballpark
- <00:19:03.919>
You the bid phase? Did it start in 25? You the bid phase? - So in the last year it went out, and then the bid will go out. The bid has went out.
Keywords:
00:02 EEC – State-Owned Dams
21:07 EEC – Grid Resilience Grant Funds
37:24 Adjournment, 958, all
Summary:
The committee heard presentations from the Department for Environmental Protection and the Office of Energy Policy on Kentucky’s state-owned dam repair program and the electric grid resilience program. Commissioner Tony Hatton explained how state dams are defined and classified under Kentucky law, the criteria used to prioritize repairs or decommissioning, and the status of several projects funded in the last biennium. He said the department is using a design-bid-build process, with major work planned or underway at Willisburg Lake, Big Bone Lick State Park Dam, Clemens Lake Dam, Marion County Sportsman’s Dam, Chinoa Lake Creek/Canning Creek Dam, and Lake Malone, and that $0.5 million is reserved for routine repairs. He also described the timeline and cost pressures, noting that construction seasons and bid uncertainty can affect schedules and estimates.
Members asked several questions about whether the estimates were current, how accurate the bids tend to be, why the process takes so long, and whether it would be better to fund design separately before construction. Hatton said the estimates are the best current engineering estimates, that costs often stay within about 10% but can vary, and that the overall process is usually closer to two years than four, though delays can occur. He also said all of the allocated dam funds must be available before bids can be let. The committee discussed whether design work can become stale if construction is delayed.
Kenya Stump then updated the committee on Kentucky’s electric grid resilience program under federal Infrastructure Investment and Jobs Act funding. She said Kentucky has received years one through three of the five-year program and has allocated funds to state park electric systems and municipal utilities, with years four and five not yet received. She identified Ken Lake State Park and Kentucky Dam Village as the two state park projects in progress, and Owensboro, Princeton, Williamstown, and Hopkinsville as the municipal projects selected through a competitive process. She said the projects are under contract or in final negotiations, with municipal construction expected to begin in the first quarter of 2026 and finish by the end of 2026, and explained that the work includes line, pole, transformer, meter, and outage-management upgrades. Members asked about the relationship between this program and prior park appropriations, the timing of agreements with Parks, and whether the park systems could eventually be transferred to the local electric cooperative; Stump said the park agreements are imminent and that the upgrades are intended to bring the systems up to code so the cooperative can maintain them. No votes were taken, and the chair adjourned the committee until the following Wednesday, with a possible time change to avoid a scheduling conflict.
AL
Alabama 2025 Regular Session
Alabama Contract Review Legislative Oversight Committee Feb 6th, 2025
Transcript Highlights:
- Yes, sir, we solicited bids from 352 and had six respondents. Yes, any questions? Thank you.
- Next, the open bid time was for a 2-year contract with three one-year renewals. Okay, all right.
- Incorrect compared to bid law. Were incorrect compared to bid law language in the contract?
- We have awarded a bid at Little River, and we're looking at three bridge replacements at Geneva State
- Security Regulatory Board, bottom of page 17 was pulled, and that is a... ...17 was pulled, and that
NM
New Mexico 2025 Regular Session
IC - New Mexico Finance Authority Oversight Jul 9th, 2025
New Mexico Finance Authority Oversight Committee
Transcript Highlights:
- Of bidding and bids that come in higher than the funding sources that are available.
- But then the original bid—there were no bids even received.
- Chair, historically that have lost out on bidding processes or other things.
- But it makes us go out to bid.
- The contractor that bid the project doesn't return my... Phone calls.
TX
Texas 89th Regular
Appropriations - S/C on Articles VI, VII, & VIII Feb 24th, 2025
Appropriations - S/C on Articles VI, VII, & VIII
Transcript Highlights:
- So we do have a low bid process, so if you look...
- We have fraudsters that attempt to attack our system, so you move over to the cyber security. security
- My identification has my address, security license, twit card, social security. and the apartment key
- Fine Arts program and recently secured a paid internship at Austin PBS.
- Once she got off of it, she's now working full time. and has secure housing.
LA
Louisiana 2026 Regular Session
Municipal, Parochial and Cultural Affairs May 13th, 2026
Transcript Highlights:
- She's paying for additional security.
- She's paying for additional security. Why doesn't she have it? What is it?
- The conversations have been about bidding that work out to a utility contractor.
- Homeland Security didn't have any funds to pick up debris.”
- “Homeland Security didn't have any funds to pick up debris.
Summary:
The committee met on May 13 and first took up House Concurrent Resolution 89, which asks the Department of Culture, Recreation and Tourism to study, with the Louisiana State Museum and the World War II Museum, the feasibility of a Louisiana Maneuvers museum and trail. Representative Owens described the historical significance of the Louisiana Maneuvers and said the proposal would help preserve and teach that history. The committee moved HCR 89 favorably to the floor without objection.
The committee then heard House Resolution 179, which would create a study of neighborhood crime prevention and security districts and their effectiveness in reducing crime. Representative Marcel said the resolution was prompted by questions about crime data and district performance, while several members raised concerns about the number of study groups and the breadth of a statewide review. Other members supported the idea as a way to gather data on what works, including cameras and other security measures. The resolution was moved favorably to the floor.
Next, the committee considered Senate Bill 228, a constitutional amendment to allow public funds to be used to replace lead and copper drinking water service lines on private property, and Senate Bill 268, the companion implementing bill that sets out the notice and replacement process. Paul Rainwater explained that the program would use EPA and state revolving-fund money, with work focused on the line from the meter to the shutoff valve, and that the city would inventory affected homes, give notice, and then proceed with replacement. Members asked about homeowner rights, emergency entry, contractor accountability, and whether the program could expand beyond New Orleans; Rainwater said he would return with more detail on the objection/emergency process. Both SB 228, as amended, and SB 268 were reported favorably.
The committee also advanced Senate Bill 283, which creates the Boulevard at Harding Area Special District in Baton Rouge to encourage development near Southern University, and two resolutions: House Resolution 225, urging agencies and local governments in Ouachita Parish to study solid waste, debris removal, and disaster resilience services, and House Resolution 223, urging Shreveport and partners to advance the Southern Soul City Initiative. All were moved favorably to the floor, and the meeting ended with members and the chair thanking staff and noting it was likely the committee’s last meeting of the session.
MN
Minnesota 2025-2026 Regular Session
State Committee Meeting - 2026-04-14
State Government Finance and Policy
Transcript Highlights:
- So we had the three you can bid on.
- However, you have other events like the NFL draft bid with 600 to 800,000 attendees.
- You have NCAA regionals and Final Four events that you can continue to bid on.
- And there are can continue to bid on.
- standpoint from an for from a security standpoint from an IT<01:16:35.600>
standpoint.
Keywords:
electronic pull-tabs, pull-tabs, tipboards, gambling tax, Minnesota Racing Commission, Thoroughbred, horse racing, Minnesota-bred horses, breeders, owners, racing purses, industry subsidy, gambling revenue dedication, problem gambling, compulsive gambling treatment, general fund appropriation, state affiliate National Council on Problem Gambling, racing incentives, equine industry, public officers
NM
New Mexico 2025 Regular Session
IC - Legislative Finance Jun 26th, 2025
Transcript Highlights:
- additional vendors and determine why vendors haven't bid in our state previously.
- Madam Chair, Secretary of Security. That's a good point too.
- officer who's handling the cyber side of security.
- Secondly, they're looking at the Social Security number to make sure it's valid.
- Uh, they can't touch Social Security through that. That process Favors spending.
HI
Transcript Highlights:
- you did not allow Hawai an lamp to bid you did not allow Hawai an lamp to bid on<00:52:27.599>
- They are vital for water security, climate resilience, and cultural heritage.
- Food security and economic security is paramount, and that's all I have. The U.S.
- Food security and economic security is paramount, and that's all I have.
- Food security and economic security is paramount, and that's all I have. Okay, any questions?
AL
Alabama 2025 Regular Session
Alabama Senate Finance and Taxation Education Committee Apr 2nd, 2025
Finance and Taxation Education
Transcript Highlights:
- And one of the things was that through the bid process or whatever it was, Blue Cross was... process
- product, the Medicare Advantage... through a product, the Medicare Advantage plan, and that's why we bid
- lead to better rates, we're going to stick with three years because we think it's good practice to bid
- So there were no social security numbers that were compromised. numbers.
- So there were no social security numbers in there, but there was a liability.
Keywords:
sales tax, local exemption, Consumer Price Index, tax holiday, clothing tax exemption, school supplies, sales tax exemption, baby supplies, baby formula, maternity clothing, menstrual hygiene products, use tax, exemption, tax conformity, tangible personal property, Alabama Department of Revenue, retail tax, consumer use tax, nonresident, religious publications
NM
New Mexico 2026 Regular Session
House - Chamber Meeting Feb 10th, 2026 at 11:16 am
New Mexico House Floor Meeting
Transcript Highlights:
- So these people that you're referring to, they do have some type of work permit and a Social Security
- So these people that you're referring to, they do have some type of work permit and a Social Security
- Visa, you are giving a Social Security number.
- Madam Chair, DACA recipients have a work permit and a Social Security number as well.
- Any U.S. citizen has to present proper documentation as well, as well as their Social Security number
Bills:
HB111, HB103, HB109, HB128, HJM2, HJM3, HM7, HM17, HM4, HM22, HM23, HM24, HM26, HM2, HM16, HM11, HM14, HM21, HM34, HM50, HB49, HB60, HB108, HB120, HB124, HB145, HB154, HB158, HB164, HB180, HB291, HJR6, HJR7, HR1, HJM1, HM13, HM47
Keywords:
water law, state engineer, civil penalty, compliance order, water rights, overdiversion, illegal diversion, groundwater storage and recovery, well license, permit violation, water enforcement, New Mexico water code, irrigation district, conservancy district, water diversion, unauthorized water sales, measuring device, district court appeal, water resources, water compliance
MN
Minnesota 2025-2026 Regular Session
Committee on Health and Human Services - 02/26/26
Health and Human Services
Transcript Highlights:
- To do this, agencies must document bids.
- must use the competitive bid process. must use the competitive bid process.
- They BHA did not solicit multiple bids.
- citations, competitive bidding citations, competitive bidding processes,<00:47:44.240>
payment - and we uh as soon as we could secured and we uh as soon as we could secured investigative<00:52:
MN
Transcript Highlights:
- <00:45:32.319>
25 have already 60 million secured 25 have already 60 million secured 25 million - bids, and put plans in place to do the $25 million worth of work.
- bids, and put plans in place to do the $25 million worth of work.
- bids, and put plans in place to do the $25 million worth of work.
- The communities were able to solicit bids, go through design, solicit bids, and put plans in place to
KY
Kentucky 2025 Regular Session
Capital Projects and Bond Oversight Committee (5-19-25)
Transcript Highlights:
- We want to see how the bids come in for the tennis facility and then make sure that we've got enough
- We want to see how the<00:07:27.919>
bids <00:07:28.240>come <00:07:28.400>in <00 - Two estimates were secured, with a low bid from Grass Masters for a total of $139,734.
- Two estimates were secured, with a low bid from Grass Masters for a total of $139,734.
- The increase request is due to bids The increase request is due to bids coming<00:26:34.400>
Keywords:
00:05 Call to Order and Roll Call
00:34 Approval of Minutes
00:56 Information Items
05:40 Project Rpt from Postsecondary Institutions
14:00 Project Rpt from Finance and Administration Cabinet
20:40 Lease Rpt from Finance and Administration Cabinet
24:53 Rpt from OFM – Ky Infrastructure Authority
40:38 Office of Financial Management
47:39 Remaining 2025 Meeting Dates
48:05 Adjournment, 958, all
Summary:
The meeting began with routine business, including a quorum call, approval of the April minutes, and several informational reports. Those information items covered upcoming general obligation debt for Bullitt, Jefferson, and Warren counties; Kentucky Communications Network Authority updates tied to House Bill 6; Eastern Kentucky University asset preservation reallocations under House Bill 1; and School Facilities Construction Commission debt activity, including 20 prior debt issues totaling about $386 million with roughly 85% locally supported debt service and 15% SFCC participation.
Members then discussed concerns about a Kentucky Communications Network Authority project, focusing on a reported discrepancy between an appropriation of $12.927 million and an apparent payment of about $8.532 million on a project with a cost estimate of $12.449 million. Several members asked for more detailed written information before the next Capital Projects meeting, noting that a lawsuit is pending and that they wanted to better understand the basis for the request and the spending to date. The committee also heard and unanimously approved a donor-funded Northern Kentucky University project to renovate tennis courts, with possible pickleball additions, after questions about why approval was needed, the project’s estimated $3 million cost, and its expected minimal ongoing operating costs.
The committee next received Kentucky State University pool allocation reports for three projects: a $2 million McCullen Hall renovation, a $1.75 million walkway and miscellaneous repairs project, and a $2 million academic services building roof-and-window project. A member asked specifically about curb cuts and accessibility in the walkway project, and Kentucky State said existing curb cuts would be repaired and additional accessibility issues would be reviewed by engineers. The lease report from the Finance and Administration Cabinet included one lease modification requiring approval for the Attorney General’s office in Franklin County and one no-action modification for the Board of Cosmetology; the Attorney General lease was approved by roll call vote.
Finally, the Kentucky Infrastructure Authority presented five loans and 37 grants, with action taken on the loan and grant items. The loans included a Hodgenville wastewater treatment plant increase, a Grant County sewer district treatment plant loan, a Mount Sterling dam rehabilitation loan, and two Morganfield drinking water loans for granular activated carbon treatment, one with full principal forgiveness. Members asked about the Morganfield project’s purpose and were told it was a remediation effort for a water-quality concern, and they also raised questions about engineering fees, which KIA said are compared against a U.S. Rural Development fee schedule that is industry accepted. The committee also reviewed cleaner water program grant reallocations from county allocation pools.