Video & Transcript Research : 'cesspool decommissioning'
Page 18 of 27
WA
Washington 2025-2026 Regular Session
Joint Oregon-Washington Legislative Action Committee Jun 12th, 2026
Joint Oregon-Washington Legislative Action Committee
Transcript Highlights:
- start to... ...transitioning traffic over to new modern bridges while we work to then start to decommission
Summary:
The Joint Committee on Interstate 5 Bridge met remotely with Washington legislative members to receive updates on the Interstate Bridge Replacement Program, including environmental review, cost and funding, tolling, and procurement for construction. Program staff said the final supplemental environmental impact statement was published in April 2026, with a federal record of decision expected in early summer. They described the recommended design as a single-level fixed-span bridge, centered I-5 alignment, C Street ramps, one auxiliary lane in each direction, and dispersed park-and-ride parking. Members raised concerns about transparency, the closed chat function, and the decision not to include two auxiliary lanes; staff said the one-lane option was recommended through consultation with partner agencies and analysis, but the final decision would come with the record of decision. Staff also said the diversion analysis projected less than 3% traffic diversion to I-205 in 2045, though members from Oregon and Washington expressed concern about impacts to their communities and asked for more detail on mitigation and decision-making.
The committee also reviewed a major cost update. Staff said the full five-mile program is now estimated at $13.5 billion to $15.2 billion, with a likely cost of $14.4 billion, up from a 2022 estimate of $5 billion to $7.5 billion, citing inflation, schedule delays, scope changes, and more detailed risk modeling. They said the first funded phase has been reduced to a $5.68 billion package focused on the Columbia River bridge replacement, connections to I-5, Hayden Island and SR-14, bridge demolition, tolling infrastructure, and advancing light rail design. Funding for that phase was described as $5.69 billion, including $2.1 billion federal funds, $1 billion from each state, and $1.5 billion in projected toll revenue. Members asked what would happen if costs rise further; staff said the estimate includes substantial contingency, the project will use progressive design-build to manage risk, and the team will continue updating the finance plan annually.
A separate tolling and traffic-revenue presentation explained that four toll scenarios were analyzed using regional travel demand modeling, a toll diversion model, and a post-processing review. All scenarios assume pre-completion tolling beginning July 1, 2028, a 50% low-income discount for eligible users, and exemptions for tribal preemptions, emergency vehicles, maintenance vehicles, and organized militia. Staff said the low-income discount would affect about 4% to 6% of annual transactions and reduce annual revenues by roughly 2% to 3%. They said Scenario 2 was used for the financial analysis and is sufficient to support the $1.5 billion toll contribution in the funded phase. Members asked about toll collection costs, revenue impacts of the discount, and how the scenarios differed; staff said collection costs are expected to be in line with other WSDOT toll facilities, but exact costs are not yet set because toll rates are not final.
Finally, WSDOT staff outlined procurement and delivery steps for construction. They said WSDOT will be the lead contracting agency, using progressive design-build, with a request for qualifications targeted for early July 2026, a request for proposals in October, contractor selection in April 2027, construction starting in 2028, and tolling beginning in 2028. Staff said the approach is intended to consolidate scope, reduce interface risk, and allow transparent negotiation with an independent cost estimator, while preserving an off-ramp if a fair price cannot be reached. Members asked for more detail on timing, cost allocation, and the share of the first phase funded by tolls; staff estimated tolls account for about 26% of the first phase cost.
CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 5 on State Administration May 19th, 2026
Transcript Highlights:
- This will help us, like my colleague mentioned, decommission the legacy system that was implemented 25
Summary:
The Assembly Budget Subcommittee 5 on State Administration held a May Revise hearing focused on state administration proposals, with the chair noting no actions would be taken and all items would remain open. The committee heard presentations on a range of budget proposals, including technical adjustments for the Governor’s Office of Service and Community Engagement and the California Workforce Development Board, security and election-related funding for the Secretary of State, modernization and loan-backfill requests for the Department of Consumer Affairs, and multiple Employment Development Department updates covering EDD Next, UI and DI/PFL benefit estimates, workforce funding, and an EMT training reappropriation.
Several items drew discussion from the LAO and committee members. The LAO generally supported technical or modernization items such as PERB’s implementation requests, GoServe’s College Corps adjustment, the Secretary of State’s security and HAVA grant items, and the Board of Pharmacy modernization proposal, but raised concerns about the Bureau for Private Postsecondary Education’s proposed $10 million General Fund backfill and interest-free loan language. For EDD, the LAO flagged the size of the DI/PFL benefit adjustment and the unusual structure of the document management system proposal within EDD Next, while EDD said the changes reflected higher participation and benefit levels after SB 951 and ongoing modernization needs.
The Department of Industrial Relations drew the most extensive questioning. It proposed funding for legal unit reclassifications, EAMS and Cal/OSHA data modernization, a new Cal/OSHA emerging technologies unit, a COYA reappropriation, and trailer bill changes requiring electronic payment of employer assessments and adjusting the Workers’ Compensation Appeals Board timeline. Members pressed DIR on high vacancy rates, long wage theft and workers’ compensation backlogs, low collection rates for fines, and the need for clearer workload and outcome measures. DIR said the requests were intended to improve efficiency, support audits and corrective action plans, and better address emerging workplace risks, while the LAO said the workload drivers behind delays remain unclear. The hearing also included support for CalHR’s employee assistance program consolidation and CDT’s proposal to expand “Poppy,” a statewide generative AI assistant for state employees.
CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 5 on State Administration May 19th, 2026
NM
New Mexico 2025 Regular Session
IC - Legislative Finance Jul 22nd, 2025
Transcript Highlights:
- Center, we've also added in a decommissioning of the old medical school building because we have science
CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 4 on Climate Crisis, Resources, Energy, and Transportation Mar 19th, 2025
Transcript Highlights:
- that road is developed and reconnected to Monument Mesa, the old section of road is going to be decommissioned
Summary:
The subcommittee heard presentations on the administration’s Proposition 4 spending plans for extreme heat mitigation and outdoor access, then took up SB 54 implementation, SB 707 textile producer responsibility, and recovery needs related to the Los Angeles fires at state parks. For the extreme heat chapter, agencies described funding for the Extreme Heat and Community Resilience Program, urban greening, urban forestry, fairground upgrades, and technical assistance for community-based climate programs. Witnesses emphasized that these are existing programs with strong demand, that technical assistance is important for reaching disadvantaged and tribal communities, and that the proposed funding would expand outreach and implementation capacity. Members asked for more detail on where funds have gone geographically, examples of successful projects, tree-planting totals, and how fairgrounds could better support fire staging and emergency preparedness. The LAO said the timing of the administration’s proposed funding generally made sense because the programs are already established, and no votes were taken.
For outdoor access, State Parks, Fish and Wildlife, and Natural Resources described funding for new parks in underserved communities, deferred maintenance, state lands access, and several new or pending programs. State Parks said the park development program would fund roughly 48 projects and that deferred maintenance funding would address high-priority health, safety, and access needs. Fish and Wildlife said its lands program would improve visitor amenities and access on properties that often lack basic facilities. The Natural Resources Agency also outlined three newer outdoor-access proposals: expanding recreation in disadvantaged communities, enhancing natural resource values and trail access, and a nature/climate/education facilities grant program. The LAO distinguished between existing programs, which are ready to move forward, and the newer proposals, where the Legislature may want more input before funds are allocated. Members also raised concerns about park police vacancies, the need to track outcomes for accessibility investments, and whether Prop. 4 could help with wildfire-related recovery at state parks.
CalRecycle then presented on SB 54, the plastics and packaging producer responsibility law, and members pressed hard on the delay in regulations. CalRecycle said it has held workshops, formed an advisory committee, selected the producer responsibility organization, and completed required baseline and covered-material reports, but needs more time to address complex comments and novel features such as source reduction and eco-modulated fees. Members expressed frustration that a statutory deadline was missed and asked for a concrete timeline; CalRecycle said it expects regulations in place by 2026, ahead of the PRO’s January 1, 2027 plan deadline. Finance said the Beverage Container Recycling Fund is currently healthy enough to support short-term loans for implementation. The committee also reviewed SB 707, the textile EPR law, which would create the nation’s first textile producer responsibility program; staff said the proposal would add positions and loan authority, and members noted the statutory deadlines for PRO approval, needs assessment, and later regulations. The hearing ended with discussion of the January Los Angeles fires’ damage to Topanga State Park and Will Rogers State Historic Park, where State Parks described extensive losses, emergency response work, and ongoing damage assessment. Members asked about FEMA eligibility, state funding sources, and community engagement in rebuilding, and the department said it is still assessing costs and will work with the public on reimagining the parks.
NH
New Hampshire 2025 Regular Session
House Science, Technology and Energy (02/04/2025)
Science, Technology and Energy
Transcript Highlights:
- representative of Portsmouth, where the city's only seaport is located, and in particular the about-to-be-decommissioned
- representative of Portsmouth, where the city's only seaport is located, and in particular the about-to-be-decommissioned
- representative of Portsmouth, where the city's only seaport is located, and in particular the about-to-be-decommissioned
- representative of Portsmouth, where the city's only seaport is located, and in particular the about-to-be-decommissioned
- representative of Portsmouth, where the city's only seaport is located, and in particular the about-to-be-decommissioned
MA
Massachusetts 2025-2026 Regular Session
Joint Committee on Housing Jun 21st, 2026 at 01:00 pm
Joint Committee on Housing
Transcript Highlights:
- We do not have decommissioned schools, vacant malls, or hotels like other locations to redevelop, so
Summary:
The Joint Committee on Housing held its second introductory hearing to frame the session’s housing agenda. Chairs Cyr and Haggerty described the hearing as a chance to hear a wide range of perspectives on Massachusetts’ housing crisis, including underbuilding, zoning and permitting barriers, rising costs, and the need for both state and local action. The committee heard from court, municipal, advocacy, and regional housing leaders, with recurring themes of increasing supply, preserving existing housing, preventing displacement, and expanding resources for renters and homeowners.
Chief Justice Diana Horan of the Housing Court said the court is handling more than 40,000 new filings annually with only 15 judges, and estimated the court would need about 21 judges to meet demand. She described complications from RAFT-related stays, mental health and guardianship issues, aging housing stock, and the new eviction sealing law, which she said was being implemented smoothly but may require additional resources if filings continue to rise. The Massachusetts Municipal Association and MAPC emphasized that municipalities need flexibility, funding, and better tools such as MassWorks, Housing Works, H-DIP, 40R reforms, inclusionary zoning changes, and a local option transfer fee; they also said local control concerns and long permitting timelines remain major barriers. MAPC and others stressed that supply growth alone will not solve the crisis and urged continued support for subsidized housing, access to counsel, and modular/off-site construction.
Advocates and housing providers focused on displacement, preservation, and tenant protections. Homes for All Massachusetts and Mass Law Reform Institute called for rent stabilization, stronger tenant protections, foreclosure prevention, elimination of junk fees, continued funding for RAFT and HomeBASE, and expanded access to counsel. Mass Union of Public Housing Tenants said the state needs far more extremely low-income housing, more operating subsidy, and major investment to repair public housing, while also supporting tenant technical assistance during redevelopment. Franklin County’s housing authority warned that rural communities are being left out of many state programs and asked for a rural LIHTC set-aside, a permanent rural credit boost, and a review of housing choice programs. A Massachusetts Taxpayers Foundation researcher presented findings that communities that add housing generally see stronger municipal finances, and that housing growth can improve property tax and state aid outcomes.
Seasonal community representatives from Cape Cod, Martha’s Vineyard, and Nantucket described extreme affordability pressures and the need for tailored tools. Nantucket’s housing trust chair said the island has made progress through local funding, inclusionary zoning, and deed-restricted units, but still needs a real estate transfer fee and faster ways to preserve year-round housing. Across the hearing, members and witnesses repeatedly returned to the need for a mix of production, preservation, tenant protections, and local flexibility, rather than relying on any single policy solution.
MA
Massachusetts 2025-2026 Regular Session
House Committee on Federal Funding, Policy and Accountability Jun 21st, 2026 at 01:00 pm
House Committee on Federal Funding, Policy and Accountability
Transcript Highlights:
- possible between public and the private coming together to create this, this, what was going to be a decommissioned
Summary:
The hearing focused on the impact of recent federal policy and budget actions on Massachusetts libraries, humanities organizations, arts institutions, and tourism. Testimony from library leaders described the loss or jeopardy of Institute of Museum and Library Services funding, including statewide databases, local grants, staff positions, E-rate/hotspot support, and digital equity programs. Witnesses said the cuts have already forced reductions in services, canceled grants and workshops, and in some cases left schools, students, job seekers, and low-income patrons without access to key resources. Members of the committee asked for lists of affected communities and databases, and several witnesses said they would provide additional written detail.
Arts and humanities witnesses said federal terminations from the NEA, NEH, and IMLS have hit organizations across the Commonwealth, including Mass Cultural Council, Mass Humanities, Mass MoCA, and local museums and historical societies. They described canceled or rescinded grants, layoffs, reduced programming, and a chilling effect on future applications and on artistic and scholarly work, especially where federal awards had already been matched with local or private funds. Several speakers also raised concerns about executive-branch DEI conditions attached to funding and about book challenges and book banning, saying these trends threaten intellectual freedom and public access to culture and history. Committee members emphasized the economic importance of the sector and the need to publicize the impacts.
Tourism officials from Meet Boston and the Massachusetts Office of Travel and Tourism testified that federal cuts and broader geopolitical and tariff issues are hurting international visitation, especially from Canada and Western Europe, and could affect major upcoming events such as the 2026 World Cup and Sail Boston. They said reduced funding for Brand USA and Discover New England will weaken long-term marketing efforts and international partnerships, with downstream effects on hotel tax revenue, jobs, and workforce recruitment. No votes were taken; the hearing was informational, with members mainly asking questions and requesting follow-up written testimony and data.
WA
Washington 2025-2026 Regular Session
Joint Oregon-Washington Legislative Action Committee Jun 12th, 2026 at 01:00 pm
Joint Oregon-Washington Legislative Action Committee
KY
Kentucky 2026 Regular Session
Senate Legislative Session Day 52 (3-24-26)
Kentucky Senate Floor Meeting
NM
New Mexico 2025 Regular Session
IC - Water and Natural Resources Nov 18th, 2025
Water & Natural Resources Committee
Transcript Highlights:
- It was decommissioned. This Occurred between about 1955 and 1970.
CA
California 2025-2026 Regular Session
Assembly Appropriations Committee Aug 20th, 2025
Transcript Highlights:
- SB 30 prevents California public entities from selling, donating, or transferring ownership of decommissioned
Summary:
The Assembly Appropriations Committee met on August 20, 2025, and considered a large number of bills, with most of the discussion centered on election redistricting and several health, labor, environmental, and government-operations measures. The first major item was ACA 8, a constitutional amendment tied to a proposed November special election and temporary mid-decade congressional redistricting in response to partisan redistricting efforts in other states. Supporters, including Planned Parenthood Affiliates of California, a 2020 redistricting commissioner, labor groups, and allies of the measure, argued it was necessary to defend democracy, protect representation, and respond to federal actions affecting California. Opponents, including Assemblymember Tom Lackey reading a statement for Assemblymember Gallagher and Assemblymember Dixon, argued the measure would undermine the independent redistricting commission, amount to a partisan power grab, and cost taxpayers roughly $230 million. Committee members also focused heavily on fiscal questions, including litigation costs and county election funding, and Department of Finance staff said counties would be made whole and funding would be advanced. The committee ultimately voted the measure out on a B roll call.
The committee then heard SB 280, the implementing bill for the special election and related redistricting process. Supporters repeated the argument that California needed to respond to Texas and other states, while opponents again emphasized the cost, the strain on county budgets, and the state’s broader fiscal pressures. Department of Finance witnesses said the election funding would be provided in advance and that the state would work with counties and the Secretary of State. The bill was moved out on a roll call after extended debate. The committee also advanced several other bills, including SB 283 on battery storage safety standards, SB 470 extending remote participation and open-meeting flexibility for state boards and commissions, SB 697 modernizing stream adjudication procedures, SB 513 requiring more accessible employee training records, SB 30 restricting transfer of older diesel locomotives, SB 841 and SB 81 creating protections for vulnerable facilities and health care spaces from immigration enforcement, SB 358 revising traffic impact fee standards, and SB 630 streamlining state parks land acquisitions.
Other measures discussed included SB 62 expanding health coverage benefits, SB 68 requiring restaurant allergen disclosures, and the committee heard both support and opposition on SB 68 from the California Restaurant Association and consumer advocates. Supporters of the health and immigrant-protection bills emphasized patient safety, reproductive health, immigrant rights, and access to care, while opponents on the restaurant bill warned of added mandates and litigation risk for small businesses. Across the hearing, committee members frequently returned to fiscal impacts, county implementation burdens, and whether the bills would save money, cost money, or shift costs to local governments. Several bills were reported out of committee, often on A or B roll calls, with some members not voting on particular measures.
TX
CA
California 2025-2026 Regular Session
Assembly Communications and Conveyance Committee Mar 19th, 2025
Transcript Highlights:
- the fair discussion that the Cal Advocates Office has put here is if we are allowing a means of decommissioning
Summary:
The committee held an informational hearing on Carrier of Last Resort (COLR) to examine its history, current operation, and possible future changes in California. Chair Tasha Berner said the hearing was prompted in part by AT&T’s 2023 request for relief from COLR obligations and by broader concerns about public safety, affordability, universal service, and access to modern broadband and telecommunications. The first panel featured a telecommunications expert who traced COLR back to universal service principles and explained how states have handled COLR differently, including full deregulation, limited rural obligations, or transition pathways tied to competition and customer protections. Members asked about affordability, federal and state processes for service withdrawal, and whether COLR remains necessary given modern competition.
CPUC staff then described California’s COLR framework, explaining that universal service rests on access, reliability/quality, and affordability, and that COLR requires carriers to provide basic service, including voice-grade calling, 911 access, relay services, and Lifeline. Staff said AT&T’s application sought relief in nearly all of its territory, but no replacement COLR came forward during the proceeding, and public participation hearings drew thousands of comments and strong concern from rural and vulnerable customers. The CPUC outlined its ongoing rulemaking to reconsider whether the 1996 COLR rules and 2012 basic-service definition still fit current conditions, with workshops and public hearings scheduled and a proposed decision expected later in the year or into 2026. Members pressed staff on geographic outreach, wireless coverage, whether broadband can be part of basic service, public safety during wildfires, and what reporting and complaint processes currently exist.
In the final panel, industry and public-interest witnesses sharply disagreed. A U.S. Telecom representative argued COLR is outdated, costly, and copper-focused, and said reform should allow technology-neutral alternatives such as wireless, fiber, and satellite while preserving reliable voice and emergency access. The CPUC Public Advocates Office countered that COLR remains a necessary public safeguard, especially for rural and low-income customers, and argued that any transition should maintain or improve service, with public benefits such as broadband investment and continued protections for 911, disability access, and affordability. Committee members focused on the difference between an obligation to serve everyone and a mere option to serve, and on whether the Legislature should provide clearer guidance as the CPUC’s rulemaking moves forward.
MN
MN
Minnesota 2025 1st Special Session
Committee on Energy, Utilities, Environment and Climate - 02/17/25
Energy, Utilities, Environment, and Climate
NH
Transcript Highlights:
- And as you heard from the prime sponsor, in my town of Marramac, we had to decommission one of our largest
- <03:02:59.120>
we <03:02:59.359>had <03:02:59.520>to <03:02:59.760>decommission - town of Marramac, we had to decommission town of Marramac, we had to decommission one<03:03:00.800
HI
Hawaii 2025 Regular Session
FIN Info Briefing - Tue Jan 7, 2025 @ 9:00 AM HST
Hawaii House Floor Meeting
Transcript Highlights:
- Priority 28 adds funds for the data center decommission and migration of services for $1.6 million.
- 05:42:08.878>
the <05:42:09.040>data <05:42:09.280>center <05:42:09.638>decommission - <05:42:10.400>
and for the data center decommission and for the data center decommission and
Summary:
The Committee on Finance received an informational briefing from the Department of Law Enforcement on its priorities following the January 1 transfer of law enforcement assets into the department, including the sheriff’s division, narcotics enforcement, criminal investigations, homeland security, and the inspector general’s office. DLE said its goals are to improve public safety, accountability, communications, training, and standards. The department outlined planned initiatives such as stronger federal partnerships, narcotics and gun-violence enforcement, an agricultural crime unit, traffic and commercial vehicle enforcement, an explosive/fireworks enforcement section, gun buybacks, new police facilities in the airport area, Aahu, and the leeward side, a state training center, upgraded law-enforcement IT, and efforts to narrow salary gaps with county departments to improve recruitment.
A major portion of the discussion focused on illegal fireworks enforcement after the recent explosion tragedy. DLE said its current task force is small and relies on ad hoc support from HPD, the Attorney General’s office, criminal investigations, and sheriffs, which is not sustainable. The department requested eight FTEs for the effort—one administrator, two clerical staff, and six investigators—plus funding for a laboratory, equipment, storage, disposal, vehicles, safety gear, and a criminalist. DLE said the explosive enforcement section would use an existing facility and that the initial lab startup cost is about $2 million. Members asked for follow-up materials, and DLE said it would send the explosive enforcement forms and additional details to the Finance and Judiciary chairs.
Members also questioned staffing vacancies, interagency coordination, and whether new specialized units could be filled. DLE said it has about 119 vacancies and that recruitment is hindered by a roughly $28,000 starting pay gap with county police departments; academy classes are down to about 12 to 14 recruits. The department said it is streamlining hiring, using QR-code recruitment, and hopes specialized units will attract applicants. On coordination, DLE said it works closely with HPD and other agencies on operations such as fireworks enforcement and public events, and that DOCARE remains a case-by-case partner but is not currently moving into DLE. The committee also received updates on the Silver Alert program, which is nearing rollout with county MOUs and a coordinator expected later in the month, the special duty officer program, which is being moved to a web-based vendor-managed system at no cost to the department, and the SaferWatch school safety system, which is being deployed statewide with annual software costs of $3,500 per school in the first year and $2,500 thereafter. No votes or formal actions were taken.
NM
New Mexico 2025 Regular Session
IC - Indian Affairs Jul 17th, 2025
House Government, Elections & Indian Affairs
Transcript Highlights:
- After dumping it, they realized it was cesspools. They had to land their helicopters and disinfect.
KY
Kentucky 2026 Regular Session
Capital Projects and Bond Oversight Committee (2-19-26)
Transcript Highlights:
- This project has three primary objectives: the consolidation and decommissioning of four existing small
Keywords:
0:00:02 Call to Order and Roll Call
0:00:30 Approval of Minutes
0:00:49 Information Items
0:01:54 Louisville Arena Authority
0:24:50 Project Rpt from Postsecondary Institutions - MSU
0:26:35 Project Rpt from Finance and Admin. Cabinet
0:37:52 Lease Rpt from Finance and Admin. Cabinet
0:40:13 Rpt from OFM – KIA
0:56:00 Rpt from OFM – EDF Grants
0:58:45 Rpt from OFM – OFM
1:01:46 Adjournment, 958, all
Summary:
The committee first handled routine business, including a roll call, approval of the prior meeting minutes, and a set of informational reports. Those reports covered University of Louisville research equipment purchases, a Kent County school district debt issue for elementary school renovations, the University of Kentucky’s planned use of construction management risk for a new engineering building, APA certification reports for underwriter and bond counsel selection committees, and a KCNA status report on infrastructure upgrades and purchases.
The main presentation was an informational update from the Louisville Arena Authority. Board representatives said the arena was created to drive economic development and reported about $1.4 billion in economic impact from 2010 to 2013. They explained the authority’s financial structure, including arena operating revenues, TIF revenues, debt service, and a long-term capital plan for major repairs and replacements. Members questioned the low net revenue figures, the long timeline before TIF revenues are projected to exceed debt service, the size of capital expenditure spikes, and the University of Louisville revenue-sharing arrangement. The authority said the $2.42 million annual UL payment is fixed under a 2017 refinancing agreement, while other amounts vary with ticket sales and related revenues. They also said the COVID-era state and Metro funds, combined with authority cash, were used to prepay debt and reduce interest, lowering the debt service schedule.
The committee then considered and approved a new capital project for a new HVAC system for the student wellness center pool area. The project, presented by university staff, was approved by the board and required committee action. The committee took a roll call vote, and the project passed unanimously.
Finally, Janice Thomas of the state budget office presented two tourism, arts, and heritage cabinet grid resilience projects at Kincaid Lake State Resort Park and Kentucky Down Village State Resort Park. Each project costs $7,834,600 and is funded mostly by a federal grid resilience grant, with the remainder from state utility infrastructure replacement funds and energy policy funds. Staff explained that the projects will move park electrical service ownership and maintenance to regional utilities, allowing the state to exit the infrastructure-management role while continuing to pay utility bills through normal metering. The committee approved the action item by voice vote.