Video & Transcript Research : 'reliability model'

Page 13 of 453
CA

California 2025-2026 Regular Session

Assembly Communications and Conveyance Committee Mar 19th, 2025

Communications and Conveyance

Transcript Highlights:
  • So universal service principles is made up of three main pillars, access, reliability and quality, and
  • No one will lose the ability to make affordable, reliable phone calls from home.
  • All of these options offer delivery. and deliver affordable, reliable voice service.
  • The most important thing is that if you're considering alternatives that they have to be reliable.
  • Means to me that it's less efficient or reliable than a pot service.
Keywords: 988, house, all
CA

California 2025-2026 Regular Session

Senate Energy, Utilities and Communications Committee Jun 24th, 2026

Energy, Utilities and Communications

Transcript Highlights:
  • It has provided reliable, safe, grid-quality, renewable power to critical loads during 63 islanding events
  • That growth has implications for grid reliability, infrastructure planning, water use, and community
  • Second, integrate data centers into the grid in a way that ensures the reliability of the system and
  • According to our economic modeling with academics across the country, it means that if we don't make
  • The CEC study will examine safety, waste management, system costs, reliability, siting, public health
Keywords: 987, senate, all
US

US Federal 2025-2026 Regular Session

US House Floor Proceedings (Thursday, February 13, 2025)

US Federal House Floor Meeting

Transcript Highlights:
  • <03:29:35.080> and reliability and reliability and stability<03:29:37.359> third<03:29:
  • Energy security is national security. these reliable baseload power generators these reliable baseload
  • <03:48:19.199> Bas the retirement of reliable Bas the retirement of reliable Bas generators
  • the North American Electric reliability the North American Electric reliability Corporation<03:48
  • of the cost of U.S. models.
CA
Transcript Highlights:
  • Universal service principles are made up of three main pillars: access, reliability and quality, and
  • No one will lose the ability to make affordable, reliable phone calls from home.
  • All of these options offer and deliver affordable, reliable voice service.
  • Second, let's move to areas that are well served by reliable choices.
  • The most important thing is that if you're considering alternatives, they have to be reliable.
Summary: The committee held an informational hearing on Carrier of Last Resort (COLR) to examine its history, current operation, and possible future changes in California. Chair Tasha Berner said the hearing was prompted in part by AT&T’s 2023 request for relief from COLR obligations and by broader concerns about public safety, affordability, universal service, and access to modern broadband and telecommunications. The first panel featured a telecommunications expert who traced COLR back to universal service principles and explained how states have handled COLR differently, including full deregulation, limited rural obligations, or transition pathways tied to competition and customer protections. Members asked about affordability, federal and state processes for service withdrawal, and whether COLR remains necessary given modern competition. CPUC staff then described California’s COLR framework, explaining that universal service rests on access, reliability/quality, and affordability, and that COLR requires carriers to provide basic service, including voice-grade calling, 911 access, relay services, and Lifeline. Staff said AT&T’s application sought relief in nearly all of its territory, but no replacement COLR came forward during the proceeding, and public participation hearings drew thousands of comments and strong concern from rural and vulnerable customers. The CPUC outlined its ongoing rulemaking to reconsider whether the 1996 COLR rules and 2012 basic-service definition still fit current conditions, with workshops and public hearings scheduled and a proposed decision expected later in the year or into 2026. Members pressed staff on geographic outreach, wireless coverage, whether broadband can be part of basic service, public safety during wildfires, and what reporting and complaint processes currently exist. In the final panel, industry and public-interest witnesses sharply disagreed. A U.S. Telecom representative argued COLR is outdated, costly, and copper-focused, and said reform should allow technology-neutral alternatives such as wireless, fiber, and satellite while preserving reliable voice and emergency access. The CPUC Public Advocates Office countered that COLR remains a necessary public safeguard, especially for rural and low-income customers, and argued that any transition should maintain or improve service, with public benefits such as broadband investment and continued protections for 911, disability access, and affordability. Committee members focused on the difference between an obligation to serve everyone and a mere option to serve, and on whether the Legislature should provide clearer guidance as the CPUC’s rulemaking moves forward.
CA
Transcript Highlights:
  • directs the state to conduct a public study, just a study, to assess which ownership and finance models
  • A previous version of the bill included a best-value procurement model that has been removed.
  • of California's energy landscape will entertain the notion of dismantling the state's existing IOU model
  • And maybe for more fire-prone areas it’s a different model, and for metro areas it’s a different model
  • Reliability and ratepayer affordability.
Summary: The Assembly Committee on Utilities and Energy heard several bills focused on utility rates, wildfire safety, carbon capture, methane reduction, large energy users, low-income energy programs, and clean energy supply chains. Early items included SB 613, which would direct state agencies to prioritize reducing methane emissions from imported fossil fuels, and SB 614, which would allow California to move forward with carbon dioxide pipeline safety rules and potentially lift the state’s moratorium on new CO2 pipelines. Both bills drew support from advocates and industry-related witnesses, with no opposition registered at the time they were presented, and the committee indicated it would vote once quorum was established. After quorum was called, the committee took up SB 57, which would require the Public Utilities Commission to establish tariffs for large energy users such as data centers to prevent cost shifts to other ratepayers and address stranded infrastructure costs. Supporters argued the bill would protect affordability and encourage clean energy use, while opponents, including utilities and business groups, warned it could create uncertainty and interfere with existing regulatory processes. The committee also heard SB 256 on wildfire mitigation and emergency response, including undergrounding, PSPS communication, and removal of abandoned lines; supporters emphasized the need for stronger action after recent fires, while utilities raised concerns about duplicative requirements and public disclosure of sensitive infrastructure information. Both SB 57 and SB 256 were approved on roll calls. The committee then heard SB 647, which would expand and standardize oversight of low-income energy savings programs and performance metrics, with strong support from community advocates and some neutral or “tweener” positions from utilities that sought further work on data collection and implementation. SB 787 followed, proposing a state strategy to coordinate supply chains and workforce development for clean energy industries including EVs, building decarbonization, and offshore wind; it received broad support and no opposition. The committee also considered SB 332, a study bill on utility ownership models and affordability reforms, which drew strong support from consumer and climate advocates but opposition from utilities and business groups concerned about bias, investor signals, and executive compensation provisions. The consent calendar was later approved, and several bills were reported out with votes or held open for absent members to add on.
CA
Transcript Highlights:
  • Safety, system reliability, cost containment, and clean energy.
  • data needed for California's long-term grid planning and system reliability.
  • to reliably serve their customers, moving forward with clean energy.
  • We want to be able to enter into contracts quickly to support the state's reliability, excuse me, reliability
  • reliability reserve as an insurance policy hasn't changed, right?
Summary: The hearing was an informational budget session on energy agency proposals, with no votes taken. Early discussion focused on Proposition 4 climate bond implementation, including funding for demand-side grid support, offshore wind development, and transmission financing. The Department of Finance said the budget includes allocations for demand-side grid support and offshore wind, but not yet for the $325 million transmission financing piece pending a required study. The Legislative Analyst’s Office urged the Legislature to consider whether to wait on offshore wind funding, whether to keep shifting funds into demand-side grid support, and how to direct future transmission financing. Members also raised concerns about local technical assistance for offshore wind, Salton Sea priorities, and the need for more information before final decisions. The California Energy Commission and CPUC then reviewed the broader energy package. The CEC highlighted the demand-side grid support program’s growth, distributed energy backup assets, long-duration storage, hydrogen grants, and the SIRP clean energy reliability program. CPUC testimony emphasized affordability, wildfire mitigation costs, rooftop solar cost shifts, and efforts to reduce rates while maintaining reliability and clean energy goals. Members questioned CPUC staffing, delays in proceedings, coordination with the CEC and CAISO, and the impact of rate increases on customers. The agencies also discussed the AB 3264 transmission financing study, with CPUC saying work on the study had already begun and was on track for the July 1 deadline. Several trailer bill and implementation items were also discussed. The committee reviewed a proposal to extend the Deaf and Disabled Telecommunications Program surcharge, with members split over whether it should be handled in budget trailer bill language or policy legislation; the administration said the surcharge supports a critical program serving about three-quarters of a million Californians. The committee also heard a CPUC data-sharing proposal to allow nondisclosure agreements for transmission and reliability data, which members generally supported as a technical fix. DWR explained a proposal to clarify language for the Electricity Supply Strategic Reliability Reserve so it can potentially sell three gas-fired units it owns, and the CEC presented a federal transmission grant proposal tied to grid-enhancing technologies and ratepayer cost recovery. Finally, the committee discussed California Lifeline and possible broadband pilot reforms in light of uncertainty around federal Universal Service Fund support, with CPUC saying it is exploring a statewide standalone broadband option for eligible customers.
CA

California 2025-2026 Regular Session

Assembly Health Committee May 6th, 2025

Transcript Highlights:
  • It's why I think we really were requiring Kaiser to invest in innovative models.
  • This model denies patients from getting the true specialized help they often need.
  • You need that reliability. And it's normal to have to go multiple times for a while.
  • And in my model, you know, you cannot do good clinical work in 20 or 25 minutes.
  • And Kaiser doesn't have a reliable process even for having...
Summary: The Assembly Health Committee held an informational hearing on Kaiser Permanente’s behavioral health care system, focusing on Department of Managed Health Care enforcement actions, Kaiser’s corrective action work plan, and testimony from patients, advocates, and union representatives. DMHC officials reviewed a long history of complaints, surveys, fines, and settlements involving Kaiser’s access to behavioral health services, including deficiencies found in 2012 and 2016, a 2022 non-routine survey, and a 2023 settlement that imposed a $50 million penalty and required $150 million in community investments over five years. DMHC said it continues to monitor Kaiser through quarterly meetings, complaint review, follow-up surveys, and a reimbursement process for members who could not obtain timely in-network care. Committee members pressed DMHC on what “timely access” and continuity of care mean in practice, how virtual care and group therapy fit into the standards, and what triggers a non-routine survey. DMHC said initial behavioral health appointments generally should not take more than two weeks, urgent care should be within days, and follow-up care within 10 days, with out-of-network care required when plans cannot meet standards. Officials also said Kaiser’s initial corrective action work plan lacked detail, but the revised plan was accepted and will be tracked through quarterly reporting and possible additional enforcement if Kaiser fails to comply. The second panel featured testimony from a Kaiser enrollee, a behavioral health policy expert, a Kaiser therapist, and the NUHW president. The enrollee described serious delays and inadequate treatment for his daughter after a suicide attempt, while the therapist and union leader said Kaiser’s behavioral health system is understaffed, relies too heavily on short appointments, group therapy, and webinars, and treats behavioral health as less important than medical-surgical care. They argued Kaiser’s one-appointment-at-a-time scheduling rule and limited treatment time violate parity requirements and harm continuity of care. Several members criticized Kaiser for not appearing at the hearing and said the testimony underscored the need for stronger oversight, clearer metrics, and faster remedies for patients.
TX

Texas 89th Regular

State Affairs Apr 9th, 2025

State Affairs

Transcript Highlights:
  • The real-world, high-standard training model would not be accessible without them.
  • The forecast is designed to facilitate both transmission planning as well as reliability.
  • In modeling and forecasting, there's a presentation that I'm going to use as a talking point.
  • modeling and forecasting.
  • We use this in critical reliability reports every year.
MA

Massachusetts 2025-2026 Regular Session

Joint Committee on Advanced Information Technology, the Internet and Cybersecurity Jun 21st, 2026 at 01:00 pm

Joint Committee on Advanced Information Technology, the Internet and Cybersecurity

Transcript Highlights:
  • We are seeing the appearance of independent weeklies that so far haven't figured out a business model
  • We believe that this model can be successful and effective in the Commonwealth.
  • We believe that this model can be successful and effective in the Commonwealth.
  • Property owners lose reliable tenants, and communities lose their economic anchors.
  • But today I'm here to tell you our model is breaking.
Keywords: 995, all
Summary: The committee held its second hearing on a large docket of technology, internet, cybersecurity, broadband, and media bills. Early testimony focused on community media funding legislation, with lawmakers and local access advocates arguing that as cable subscriptions decline and streaming grows, revenue tied to cable franchises no longer supports community television and PEG programming. Supporters said community media remains a key source of local news, government meeting coverage, and civic transparency as newspapers disappear or consolidate. A related bill on cable contract oversight also drew support, with testimony that the Department of Telecommunications and Cable is backlogged and should more actively review municipal-provider agreements and report its workload to the committee. Another major topic was a proposal to create a Massachusetts Innovation Fund for state IT modernization. The Alliance for Digital Innovation backed the bill, saying agencies need flexible upfront capital to replace outdated systems and improve cybersecurity, and pointing to the federal Technology Modernization Fund as a model. The witness noted that funding for the state program still needs to be identified. The committee also heard strong support for a bill requiring free broadband in public housing, with Rep. Emmela Goodwin and MAPC describing internet access as essential for jobs, school, telehealth, and civic participation. They said the digital divide in Massachusetts is driven largely by affordability rather than infrastructure, though questions were raised about costs, wiring, and whether all housing sites already have broadband access available at the curb. A substantial portion of the hearing centered on bills to limit addictive social media feeds for minors. Supporters, including lawmakers, parents, teens, and advocacy groups, argued that algorithmic feeds contribute to addiction, anxiety, body image problems, and other harms, and said the bills would restrict surveillance-based curation and overnight notifications while leaving search and followed accounts available. Opponents, including FIRE, CCIA, and the Taxpayers Protection Alliance, argued the bills would require invasive age verification, threaten privacy and cybersecurity, burden adults’ anonymity, and likely face First Amendment challenges. They also warned the measures could disadvantage smaller businesses and may be unconstitutional based on recent court rulings in other states. The committee also heard support for blockchain-related bills creating a commission, a pilot program, and consumer education efforts, with testimony that Massachusetts has the talent but needs a coordinated state strategy. No votes or final actions were taken during the hearing.
DE
Transcript Highlights:
  • Renewables are great, but they're not going to solve the situation because of their lack of reliability
  • Every AI model, every student accessing a cloud-based learning platform, every small business running
  • It was modeled after the state, but a lot simpler.
  • So I think the model could work, and I think it could get things up and running a little quicker.
  • But provide reliable firm energy is the same thing as...
Keywords: 1064, all
CA
Transcript Highlights:
  • So a lot of the model developers are actually sidestepping it, and therefore the models they're building
  • Google's advanced AI and gen AI models can understand...
  • They don't have reliable child care.
  • They don't have reliable child care.
  • Predictive models in health care have been around for years.
Summary: The joint informational hearing of the Assembly Health and Privacy Committees focused on generative AI in health care, with opening remarks emphasizing both its potential to improve care and its risks around privacy, bias, liability, workforce impacts, and unequal access. Chair Bauer-Kahan and Chair Bonta framed the discussion around how California can encourage beneficial innovation while protecting patients, especially given the sensitivity of health data and the possibility that AI could worsen existing disparities if not carefully governed. The first panel featured representatives from Cedars-Sinai, Kaiser Permanente, Penguin AI, and Google, who described current uses of AI such as ambient clinical scribes, nursing documentation tools, imaging triage, maternal-fetal risk prediction, and administrative automation. Speakers said these tools can reduce clinician burden, improve patient experience, speed treatment, and in some cases improve outcomes, including a reported mortality benefit from a Kaiser predictive model and faster thrombectomy times at Cedars-Sinai. Members raised concerns about accuracy with accents and multilingual visits, whether predictive tools could reinforce bias or lead to more interventions such as C-sections, and how to ensure a human remains in the loop for important decisions. The second panel, including representatives from the California Health Care Foundation, UC Berkeley, and Stanford, focused on policy and governance challenges. Testimony highlighted examples of AI supporting homelessness outreach and community health work, but also warned that biased algorithms can encode inequities, especially when trained on data that reflect under-treatment of Black, rural, or low-income patients. Witnesses urged clearer standards for trustworthy AI, stronger monitoring and governance structures, better data access for accountability, and attention to the safety net’s limited resources. Several speakers argued that states should require health systems to have AI governance processes, clarify liability between developers and deployers, and regulate downstream uses of AI while preserving access to data for lifesaving research and oversight.
KY
Transcript Highlights:
  • We're investing in reliability investments throughout our system.
  • Uh we're<00:21:08.400> investing<00:21:08.799> in<00:21:09.039> reliability<00:21
  • :10.080> um we're investing in reliability um we're investing in reliability um investments<00
  • Keep enough spinning reserve for reliability of the system, right?
  • I would add that I think that the current regulatory model in Kentucky is one of the benefits that we
Summary: The Artificial Intelligence Task Force met with a quorum, adopted prior meeting minutes, and then focused on energy policy and economic development as they relate to AI and data centers. John Bevington of LG&E and KU, introduced by Caroline Clark of LG&E/KU and PPL, described the utility’s Kentucky-only service territory, vertically integrated system, 1.3 million customers, and about 7.5 gigawatts of generating capacity. He said the company has supported 76 Kentucky projects in 2024 totaling about $3 billion in announced investment and roughly 3,000 jobs, with a large share of statewide announcements occurring in its service area. Bevington said LG&E and KU’s current project pipeline is unusually strong, totaling about 170 projects and 8.5 gigawatts of requested power, with data centers accounting for about two-thirds of that demand. He broke the pipeline into existing customer expansions, new-to-Kentucky projects, and 20 data center projects representing about 5.6 gigawatts of potential load. He highlighted a Louisville data center project by PO Development Company and Powerhouse Data Centers that has announced a 400-megawatt facility and may expand to 525 megawatts, estimating that such a project could represent about $4 billion in investment. He also explained that large data centers generally must locate near transmission lines and that utilities must conduct studies, order long-lead equipment, and secure reimbursement commitments before proceeding so other customers are not harmed. Members asked about how Kentucky compares with other states, the size of data center projects, and whether regulatory reform is needed. Bevington said the 20 projects reflect current Kentucky interest, which he attributed in part to the state’s sales tax exemption for data centers, and noted that states like Ohio have had similar incentives for years. In response to questions from Senator Thomas, he confirmed that data centers can vary in size and said the state should have a regulatory environment that supports economic development, while emphasizing that the benefits would flow to the state, local communities, and schools rather than just the utility. He also cited national and regional data suggesting data centers generate indirect jobs and tax revenue, and said LG&E and KU are investing in transmission, reliability, solar, and gas generation projects, including proposed additional 645-megawatt natural gas units and other system upgrades, to meet expected demand.
MN

Minnesota 2025 1st Special Session

Committee on Commerce and Consumer Protection - 03/20/25

Commerce and Consumer Protection

Transcript Highlights:
  • Then the federal Telecommunications Act of 1996 changed that financial model for providing traditional
  • As a result, uh, less than 2% of model.
  • <00:25:55.440> and<00:25:55.600> in<00:25:55.840> an reliable as broadband.
  • and in an reliable as broadband. and in an increasingly<00:25:56.840> difficult<00:25:57.840><
  • threshold or isn't reliable. threshold or isn't reliable.
Keywords: 1187, senate, all
FL

Florida 2026 Regular Session

Military and Veterans Affairs, Space, and Domestic Security Nov 18th, 2025

Military and Veterans Affairs, Space, and Domestic Security

Transcript Highlights:
  • Our mission is to deliver fast, reliable internet connectivity to customers and communities beyond the
  • As many of you know, there are billions of people on Earth without access to reliable internet.
  • You know, the need for high-quality broadband reliable or it just does not exist.
  • our advantage, it's the innovation that we have, it's the efficiency that we gain in a free market model
  • It's a great business model, and we need to stay focused and support our space industry and all of our
Summary: The Committee of Military, Veterans Affairs, Space, and Domestic Security heard a series of informational presentations focused on Florida’s aerospace and space ecosystem. Blue Origin described its Florida operations at Rocket Park, Launch Complex 36, and Port Canaveral, highlighting New Glenn and Blue Moon development, recent launch activity, workforce development efforts, and major capital investment in the state. Amazon Leo (formerly Project Kuiper) outlined its low-Earth-orbit broadband network, customer terminals, satellite and gateway architecture, dark-sky mitigation efforts, and Florida investments including a payload processing facility and launch support infrastructure. Starcatcher Industries presented its concept for an orbital energy grid that would beam power to satellites, discussed demonstrations in Florida, customer interest, and plans for a first satellite launch next year. Space Florida President and CEO Rob Long gave a strategic update on the state’s aerospace industry, citing billions in private investment, growth in aerospace establishments and projects, spaceport infrastructure investments, workforce and university partnerships, and the importance of maintaining Florida’s competitiveness against other states. NASA Kennedy Space Center Director Janet Petro then emphasized Artemis II preparations, rising launch demand, aging infrastructure, and the need for stronger state-federal coordination and investment in research, workforce, and common-use infrastructure. She compared Florida’s support structure with Texas and argued that Florida must act to avoid losing aerospace leadership. Members asked questions about mobile and aviation applications for Amazon Leo, dark-sky impacts, satellite counts, Starcatcher’s power transmission losses and storage approach, and NASA’s funding and infrastructure constraints. Petro also discussed limits on commercial investment in common infrastructure under federal rules and suggested that state investment and better alignment among partners could help. No bills were considered and no votes were taken beyond adjournment; the committee concluded by adopting a motion to adjourn.
KY
Transcript Highlights:
  • Uh, we're investing in reliability investments throughout our system.
  • um we're investing in reliability um investments<00:21:14.640> throughout<00:21:15.039> our
  • <00:34:01.360> So<00:34:01.600> we reliability of the system, right?
  • So we reliability of the system, right?
  • that that are to our regulatory model that that are what<00:40:47.680> draw<00:40:47.920>
Keywords: 958, all
Summary: The Artificial Intelligence Task Force held its third meeting and adopted the prior minutes after a motion and second. The main presentation came from John Bevington of LG&E and KU, who described the utility’s Kentucky service territory, its vertically integrated operations, and its role in economic development. He said the company supported 76 projects in 2024, representing about $3 billion in announced investment and roughly 3,000 jobs, and noted that about 45% of statewide investment announcements were in its service area. He also outlined a large project pipeline of about 8.5 gigawatts, with data centers making up roughly two-thirds of that interest. Bevington explained that data center siting differs from traditional manufacturing site selection because it is driven primarily by transmission access and grid capacity rather than a process of eliminating locations. He said large data centers must locate near transmission lines, that utilities must conduct formal studies to ensure existing customers are not harmed, and that the buildout timeline for utility infrastructure is much longer than for data centers. He cited a Deloitte study and other industry data to argue that power constraints and timeline mismatches are the biggest challenges, while also emphasizing that data centers can generate significant construction activity, indirect jobs, and tax revenue. He said Kentucky’s sales tax exemption for data centers was a key enabler that increased interest in the state. Members asked about the number and size of potential data center projects, how Kentucky compares with other states, and whether regulatory reform is needed. Bevington said the 20 projects in Kentucky reflect current interest, that other states such as Ohio have had similar incentives for years, and that Kentucky is still early in the market. He also said data centers can vary in size, from 200 to 600 megawatts or more, and that they can be located anywhere with sufficient transmission capacity and, in some cases, access to workforce and roads. In response to concerns about energy supply, he said LG&E and KU are pursuing an “all of the above” strategy, including solar, batteries, and new natural gas combined-cycle units, and noted ongoing and proposed projects totaling additional capacity if approved by the Public Service Commission.
KY
Transcript Highlights:
  • <00:12:37.600> and The service is incredibly reliable and The service is incredibly reliable
  • ,<00:25:35.039> secure clean, efficient, and reliable, secure clean, efficient, and reliable
  • What was the contract, the model.
  • If they disagree with it, we can go to the secretary under the model procurement code.
  • excellent fashion and the most reliable excellent fashion and the most reliable indicator<01:28:
Summary: The Information Technology Oversight Committee met to hear a presentation from Kentucky Department of Education officials David Couch and Mike Lingham on the history and current status of Kentucky’s K-12 internet network, including its relationship to KentuckyWired. They described the original KETS design from 1995, when KDE established district internet hubs and left local districts to connect to them, and said that model helped Kentucky become a national leader in school connectivity and cloud-based services. They also emphasized the importance of E-rate eligibility, saying it has saved the state substantial money and remains central to KDE’s network contracting. Couch and Lingham said the current “next generation Kentucky K-12 internet” contract with Education Networks of America is more reliable, offers more functionality, and costs less than the prior system, including lower bandwidth and firewall costs. They explained that the transition was complicated by build-out and provisioning issues, especially the need for more “type two” connections through local providers, which pushed some implementation past the June 30, 2024 E-rate deadline. As a result, 39 sites remain on type two connections, and KDE absorbed the loss of federal discount dollars for the portion of the transition that extended into July. The witnesses also discussed home internet access for students. They said KDE has tracked home access for about 20 years and estimates about 4.5% of students still lack adequate internet at home, with roughly 3% able to reach access nearby and 1.5% having no access. They said the biggest barrier is usually cost rather than lack of available lines, and noted that temporary hotspot support during COVID helped students continue schoolwork. Senator Williams asked about the costs of the transition, the current type two sites, and the potential cost of any future transition, but the transcript cuts off before a full answer was given.
NM

New Mexico 2026 Regular Session

Senate - Tax, Business and Transportation Feb 7th, 2026 at 06:52 pm

Senate Tax, Business & Transportation

Transcript Highlights:
  • And access to affordable and reliable energy is equally critical to protecting New Mexicans.
  • Senate Bill 18 fails to balance environmental goals with affordability and reliability.
  • They go where the policy signals sustainable and reliable growth. SB 18 is that signal.
  • Energy storage is critical for grid reliability and resilience.
  • I think California is the wrong model to try to duplicate.
NM

New Mexico 2025 Regular Session

IC - New Mexico Finance Authority Oversight Nov 3rd, 2025

New Mexico Finance Authority Oversight Committee

Transcript Highlights:
  • Dispatchable capacity is what keeps the grid operating reliably.
  • . capacity to keep the grid reliable.
  • Several western states are looking at New Mexico RETA as a model.
  • Everybody was looking at our model because we have such an amazing model, so thank you, and Mr.
  • The rules for reliability are imposed on every single connection to the grid.
US

US Federal 2025-2026 Regular Session

US House Floor Proceedings (Friday, December 12, 2025)

US Federal House Floor Meeting

Transcript Highlights:
  • <00:36:46.960> costs, reliable power and lower costs, reliable power and lower costs, we've
  • <00:38:11.599> and electric grid that is less reliable and electric grid that is less reliable
  • , pipelines that provide reliable, pipelines that provide reliable, affordable<00:43:04.800> energy
  • His exact is a model of efficiency.
  • <03:53:46.800> of the exact opposite of a model of the exact opposite of a model of efficiency
KY

Kentucky 2026 Regular Session

Interim Joint Committee on Education (6-2-26)

Education

Transcript Highlights:
  • operate under a threepart funding model operate under a threepart funding model that<00:35:45.680
  • schools with our literacy coaching model schools with our literacy coaching model to<01:35:00.000
  • literacy coaching model. literacy coaching model.
  • <01:43:40.639> is that state literacy coaching model is that state literacy coaching model
  • more specific list of reliable proof? more specific list of reliable proof?