CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 6 on Public Safety May 18th, 2026
Transcript Highlights:
- I just wonder how optimistic some of these projections are.
- The spring projections are an update to the fall 2025 projections, which we provided through June 2030
- The project is scheduled to be completed and operational in 2027.
- technology projects are in terms of reporting to the Department of Technology.
- The state is on the doorstep of this project working. You're on the doorstep.
NM
New Mexico 2025 Regular Session
IC - Legislative Health and Human Services Oct 6th, 2025
Legislative Health & Human Services Committee
Transcript Highlights:
- I really think of that as being phase one of this project.
- We just recently had approval for that—a $40 million project.
- But that only represents one of our big projects.
- Thornton, who has taken over for Project ECHO, here to discuss where we are with Project ECHO.
- We do have a project in Zuni, Pueblo. We do have another.
CA
California 2025-2026 Regular Session
Assembly Budget Committee Sep 11th, 2025
Transcript Highlights:
- What is the purpose of that program, and what projects are eligible for that?
- Obviously, point-in-time projections are what we have for the budget to inform the budget.
- projects, are built in their neighborhoods or next to their homes.
- We're already seeing projects... ...projects and communities that have already had to hold these facilities
- It'll go to great projects across our state and will be well used and well needed.
Summary:
The Assembly Budget Committee held an informational hearing on the September budget package, which included SB 105 and a series of trailer bills covering health, human services, education, resources, child care, transportation, labor, public safety, housing, revenue, background checks, collective bargaining, and a special election. The Department of Finance described the package as largely technical and clarifying, but also responsive to state and federal changes, especially H.R. 1. Key items included roughly $3.3 billion in Proposition 4 climate and environmental spending, $540 million in discretionary greenhouse gas reduction funds, and major responses to H.R. 1 such as CalFresh error-rate mitigation, food bank support, and Medicaid-related changes. Other notable provisions included vaccine policy flexibility, an Abortion Access Fund, a gender-affirming care program, community college basic-needs and aid changes, CEQA and coastal permit exemptions tied to the 2028 Olympics, invasive mussel prevention funding, a civic media program, labor and pension-related provisions, and special election administration changes.
Members raised questions and concerns about several parts of the package. There was support for climate, water, transit, offshore wind, food security, and health investments, but also significant criticism of the lack of cleanup language for SB 131 and its advanced manufacturing exemptions, with multiple members saying promised fixes had not materialized and expressing concerns about tribal consultation, labor standards, and environmental protections. Members also questioned the scale and timing of some Proposition 4 allocations, including fairground upgrades, regional conveyance, and a UC Davis alternative protein research center. The Department of Finance said some programs would roll out over time and that certain funding levels reflected current implementation capacity.
The hearing also featured discussion of Bay Area transit financing, with Finance saying SB 105 directs the department and CalSTA to examine loan or other financing options rather than immediately providing loans. Members and public commenters also discussed the state’s response to H.R. 1, with advocates supporting food bank, health care, and immunization provisions while warning of ongoing harm to immigrants, foster youth, and other vulnerable groups. Public testimony broadly supported the health, food, water, offshore wind, and golden mussel provisions, while many speakers echoed legislative concerns about SB 131 and urged cleanup action in the next session. No votes were taken because the hearing was informational only, though the chair noted votes on the bills were expected later that night or the next morning.
AR
Transcript Highlights:
- This is the University Hall fan coils project.
- On page 19, you'll see the list of historic preservation program projects.
- So, no, and it's been a—this is a huge project.
- So there have been delays in the overall project for different reasons.
- This is a sustainability benchmarking analysis project.
Summary:
The committee met to review a supplemental agenda item, procurement rule revisions, methods of finance, discretionary grants, contracts, reports, and a member disclosure. The supplemental agenda was accepted, and the Office of State Procurement’s rule revisions were approved after Jessica Patterson explained they were driven by 2025 legislative changes, including Act 782, CASO Consulting recommendations, and updates to sole source, bid, protest, and debarment provisions. The methods of finance and discretionary grants were also approved, covering a range of university capital projects, health and human services grants, historic preservation awards, and tobacco prevention and cessation programs.
The committee then reviewed RFQs and six ratifications. The ratifications included a Workforce Connections payment to ACT WorkKeys for services provided during a contract gap, a Department of Health ratification for water-leak repairs, a large Department of Public Safety ratification for Motorola’s Arkansas Wireless Information Network upgrade, a Veterans Affairs HVAC ratification, an ADFA medical services ratification, and a UA Little Rock painting contract ratification. Members questioned the Public Safety ratification at length about why the expired Motorola contract was not caught sooner and why it took months after discovery to come forward; agency officials said the work was tied to bond funding and was not tracked in ASIS, and the chair urged agencies to develop better monitoring procedures.
The committee approved a large slate of construction, intergovernmental, out-of-state, and in-state contracts, including many recurring service agreements for DHS, higher education institutions, corrections, health agencies, and state support functions. Several members asked about specific contracts, including aerial application services for correctional farms and a Southern Arkansas University custodial contract, and staff or agency representatives provided brief explanations. The meeting concluded with review of reports and approval of a member disclosure involving Representative Andrew Collins’ investment interest in a company leasing property to Arkansas Rehabilitation Services.
FL
Florida 2026 Regular Session
Environment and Natural Resources Feb 3rd, 2026
Environment and Natural Resources
Transcript Highlights:
- One, the entire recovery of the Santa Fe and Ichetucknee Rivers relies on one project.
- But there are so many unanswered questions with this project. We don't have the land.
- to have to allocate hundreds of millions of dollars to see this project completed.
- We support the project. We need this project. But there's so many unanswered questions.
- The one big project, the Water First Project, is not a bad project, assuming it can do what they say
Keywords:
battery collection, battery stewardship, environment, recycling, hazardous waste, waste management, regulation, environmental protection, facilities, hazardous materials, coral reefs, natural resource, climate change, coastal flooding, solar facilities, wastewater treatment, nutrient reduction, land conservation, water conservation, Florida Department of Environmental Protection
Summary:
The Environment and Natural Resources Committee met with a quorum and took up several environmental bills and one appointment. SB 1422, as amended by a strike-all focused on coral reef protection and designating coral reefs as critical natural infrastructure, was reported favorably after support from Audubon Florida was noted. The committee then considered SPB 7034, a DEP rule ratification related to minimum flows and levels for the Lower Santa Fe and Ichetucknee Rivers and associated recovery strategy; witnesses from the Florida Springs Council and local river advocates criticized the plan as too delayed and too dependent on a single future water project, while committee members raised questions about funding and utility responsibility. Despite concerns, the committee approved the bill as a committee bill, with Senator Smith voting no.
The committee next heard SB 1510, as amended, which made technical changes to DEP-related provisions including B-MAP notice and timing, septic system requirements in Florida Springs areas, biosolids, fees, land acquisition, and rulemaking procedures. The main public testimony came from the Florida Springs Council, which opposed the 60-day delay for B-MAP effectiveness as harmful to spring restoration, while DEP and others supported the measure. The bill was reported favorably. The committee also considered SB 1196, a targeted siting bill restricting new ash-producing incinerators or waste-to-energy facilities within two miles of large federally authorized water impoundment areas, with an amendment narrowing the practical effect to Miami-Dade and Broward counties. Supporters, including the City of Miramar, argued it would protect water resources and communities; opponents from the Florida Waste-to-Energy Coalition argued it would limit local waste-disposal options and could force more landfilling. The bill was reported favorably.
Finally, the committee heard SB 912, the Safe Battery Collection and Recovery Act, which would require battery stewardship organizations and related recycling plans to keep batteries out of the waste stream. Industry and recycling representatives supported the bill, citing growing battery volumes and fire risks at recycling facilities. The committee also recommended confirmation of Gary Jennings to the Atlantic States Marine Fisheries Commission. All measures were approved favorably except that Senator Smith voted against SPB 7034; the meeting then adjourned.
FL
Florida 2025 Regular Session
February 12, 2025 - 03:30 PM
Transcript Highlights:
- And I'll call your attention to the top right there, the 36 project.
- Those are all projects that are coming to the state, but they don't know where.
- will be a result of some of these projects as we go through.
- will be a result of some of these projects as we go through.
- Chairman, a pilot project would be amazing.
Summary:
The committee met with a quorum and heard first from Space Florida President and CEO Robert Long, who described the agency’s role as the state’s aerospace finance and business development authority and spaceport authority. He reported a pipeline of about 187 projects, nearly $7 billion in potential private investment, and roughly 8,000 potential jobs, with 161 projects in the fiscal-year pipeline, up about 30% from the prior year. Long said Space Florida is focusing on workforce development through its Space Florida Academy with 23 school districts, and on target markets including advanced air mobility/eVTOL, flight simulation, and satellite manufacturing. Members asked about infrastructure, federal-state coordination, LNG planning, environmental mitigation, workforce, and how the Legislature’s recent $5 million recurring increase is being used; Long said the funds are mainly supporting staffing, contracted services, and IT improvements to handle growth and move projects through faster.
The panel then heard from Blue Origin, Leonardo (through LSN Partners), and Lone Star Data Holdings. Blue Origin said its Florida manufacturing and launch operations have grown far beyond initial commitments, with more than $3 billion invested and over 3,000 employees in the state, and emphasized the need for roads, water, wastewater, and other launch-site infrastructure as launch cadence increases. Leonardo highlighted its TH-73A Navy helicopter program in Milton and a new 70,000-square-foot maintenance facility at Whiting Aviation Park, crediting state, local, and federal partners and noting future potential for its AW-609 tiltrotor aircraft. Lone Star Data Holdings described its satellite-based data storage and disaster-recovery business, said Florida was its first customer, and urged the state to use Florida as a pilot project for protecting data and expanding space-based data infrastructure.
Members repeatedly focused on what the state should do next, and the panel’s main answer was continued investment in infrastructure and long-term planning. Specific needs mentioned included road widening, traffic signals, fire suppression, water pressure, wastewater capacity, power, transportation links, environmental mitigation, and LNG-related planning at the spaceport. No formal votes or bills were taken up in the meeting, and the session ended after member questions and comments with a motion to rise and adjourn.
TX
Transcript Highlights:
- And last are the projects removed from the capital budget rider, primarily due to completion of the projects
- If those projects...
- I hope that there are more projects.
- The PRB delivered these projects.
- Projects include two things: increased data center services and funding for the Hazelwood project.
Bills:
SB 1
Keywords:
campground safety, youth camp regulations, flood safety, emergency evacuation, health and safety standards
Summary:
The committee heard budget presentations from the Legislative Budget Board and agency officials on several agencies, starting with the Texas Historical Commission. LBB described a large biennial reduction driven mainly by the removal of one-time funding and discussed capital projects, rider changes, and exceptional items including Presidio La Bahia and the National Museum of the Pacific War. Senators asked about heritage trails, courthouse grants, unexpended balance authority, and the status of historical-site funding. Historical Commission leadership emphasized preservation, courthouse restoration, heritage tourism, coordination with the Alamo and other Texas Revolution sites, and requested additional IT, staffing, and vehicle funding. No votes were taken.
The committee then reviewed the Pension Review Board and the Employees Retirement System. The Pension Review Board’s budget was largely unchanged aside from IT maintenance and salary adjustments, with an exceptional item for additional IT enhancements. Members discussed the Dallas Police and Fire Pension System’s funding dispute and the need for a workable restoration plan. ERS presented a much larger budget, including funding for the retirement system, the group benefits plan, and the legacy payment intended to reduce unfunded liability. Senators focused heavily on pension investment returns, benchmark comparisons, and rising health-care costs, especially pharmacy spending driven by GLP-1 drugs; ERS said the plan covers about 540,000 lives and that premiums would rise 8% while benefits remain unchanged. ERS also said it had no exceptional items, and committee members requested more detailed benchmark information.
The committee also heard from the Texas Emergency Services Retirement System and the Cancer Prevention and Research Institute of Texas. TESSORS reported an unfunded liability, an infinite amortization period, and requested additional state support, staffing, and IT funding, including a statutory change to allow a higher contribution level; the agency warned that without more funding it may have to cut benefits. CEPRIT’s presentation covered its bond-funded cancer research and prevention portfolio, revenue-sharing from funded projects, and a request to increase salary limits for its CEO and chief scientific officer. Senators questioned CEPRIT’s accomplishments and return on investment, while CEPRIT cited screening, prevention, and research outcomes, including tens of thousands of detected cancers and precursors and hundreds of thousands of first-time screenings. The meeting ended after these presentations and questions, with no recorded committee action or vote.
KY
Kentucky 2026 Regular Session
House Budget review Sub. on Postsecondary Education. (2-19-26)
Transcript Highlights:
- In the current year 2025-26, phase one of the project is for $350 million.
- <00:12:48.480>
for year 2526, phase one of the project for year 2526, phase one of the project - bianium 2728, phase two of the project bianium 2728, phase two of the project for<00:13:05.440><
- The project will come to the WKU life.
- >
we're Through the pilot project, we're Through the pilot project, we're proposing<00:26:27.760
Summary:
The House Budget Review Subcommittee on Postsecondary Education met without a quorum, so no minutes were approved. The committee then heard a presentation from Western Kentucky University President Timothy Kabone, who highlighted WKU’s recent gains in graduation rate, retention, degree production, graduate enrollment, research activity, and financial stability. He said WKU’s FY 2026 budget is structurally balanced without one-time reserves, and he tied the university’s growth to its strategic plan and to Senate Bill 77, which created a pathway for WKU’s first PhD program. WKU’s initial PhD offering is planned in data sciences for fall 2027, and Kabone said the university continues to pursue R2 research status.
Kabone also outlined WKU’s budget requests, including a 4.5% base appropriation increase for each year of the biennium, a $30 million increase in the performance funding pool, a $30 million trust fund for tuition waiver reimbursement, and $2 million per year for the Gatton Academy. He also requested continued funding for the Kentucky Mesonet, 8.9% of proposed asset preservation funding, and support for a $280 million new Potter College facility. He emphasized inflationary pressures, rising fixed costs, and the burden of mandated tuition waivers, and said the university supports performance funding but wants the model adjusted to better reward student success rather than enrollment growth.
Members asked about WKU’s student housing situation and the transition away from the former student life foundation model. Kabone said the foundation structure had run its course, that the university had lacked adequate oversight under the old arrangement, and that WKU is moving to a public-private partnership with Gilbane and the College Housing Foundation. He said the new model would not increase the university’s debt load and would replace older residence halls with a roughly 1,000-bed complex, eliminate community-style bathrooms over time, and expand living-learning communities. Representatives McCool and Tipton praised WKU’s graduation and retention results and asked questions about the housing project and its timeline.
The committee then heard from CareerVXR and KCTCS about a proposed career exploration pilot. Company representatives said the platform uses web-based and virtual reality experiences to show students real jobs and workplaces, with the goal of addressing an “awareness gap” in workforce participation. They proposed a $1.8 million, two-year pilot to reach 50,000 to 60,000 students in three regions, including Hazard Community and Technical College, Southeast Community and Technical College, and western Kentucky. Members asked about cost, funding source, and locations, and were told the request would come through the KCTCS budget. The meeting ended with notice that the next meeting was scheduled for Thursday, February 26.
WA
Washington 2025-2026 Regular Session
House Transportation Dec 4th, 2025
Transcript Highlights:
- Also, those years into the future are projections from Washington State Ferries; that's the current projection
- The ongoing biennial costs needed to maintain those projects is one...
- The ongoing biennial costs needed to maintain those projects is one...
- the project.
- These are projects that my office was asked to receive... Recovery.
Summary:
The committee received a detailed staff presentation on Washington State Ferries’ capital needs, current fleet status, and long-range funding outlook. Staff described the current service pattern, ridership recovery since the pandemic, the aging fleet, and the state’s plan to add three new hybrid-electric Olympic-class vessels under the 2025 budget, with delivery expected around 2030-2032. Members also heard that the fleet is operating with no reserve vessel, that preservation time is below the desired level, and that terminal electrification and vessel conversion plans face timing, cost, and procurement risks. Questions focused on ridership trends, biofuel supply, design-risk allocation in vessel contracts, sequencing of terminal electrification with new vessel delivery, and the cost and feasibility of restoring international Sidney service, which would require a SOLAS-certified vessel.
Staff then outlined ferry capital funding, saying recent spending and programmed needs are far above regular ferry-specific revenues and that the system relies on a mix of dedicated accounts, transportation package money, federal grants, and transfers. They said the near-term budget is balanced through 2027-29, but the longer-term capital outlook shows a shortfall of roughly $250 million to $300 million per biennium, with broader unmet needs much higher. The presentation estimated costs for future vessels, life extensions, terminal electrification, and additional Jumbo Mark II conversions, and noted that the current enacted plan does not fully fund fleet replacement, full electrification, or life extension of older vessels. Members asked for follow-up information on terminal seismic/environmental issues, contract options for additional vessels, and the timing and cost of alternative vessel designs.
The committee then shifted to WSDOT maintenance and preservation. Pascoe Focktich described maintenance operations, including winter response, guardrail repair, facilities, equipment, and the effects of underfunding and inflation. He said most of the maintenance budget is fixed cost and labor, that material prices have risen sharply, and that many facilities are in poor condition with asbestos issues and deferred upkeep. He also noted growing guardrail damage, increasing pavement claims, and the burden of maintaining aging bridges and facilities. Members asked about prior planning for these needs, the role of asbestos, and whether more proactive sequencing could help budget decisions.
Troy Suing then presented the highway preservation program, saying WSDOT is in the early stages of critical failure and has stretched preservation dollars as far as possible. He explained the distinction between pavement, bridge, and other highway asset preservation, said the department is largely reactive, and estimated that delaying work can make it three to five times more expensive later. He said about 40% of roadways are currently due or overdue for preservation, bridge conditions are nearing the federal poor-bridge threshold, and the department’s 10-year preservation need is about $8 billion. Members asked about the cost of deferring work, whether the department could do more if funded, how priorities are set, and whether other states face similar problems.
Finally, Evan Grimm and Mike Fay briefed the committee on bridge strikes by overheight vehicles. They described recent incidents on I-90 near Cle Elum and SR 410 near White River, the damage and closures caused, and possible countermeasures such as public outreach, improved trip-planning tools, and a pilot warning system with sensors and flashing beacons. Fay explained the state’s financial recovery process for third-party damage, saying WSDOT recovers roughly $20 million per biennium and about 78% to 80% of billed damages, with money going to the motor vehicle fund. Members asked about prevention, insurance recovery, and whether the state uses claim data to inform future design or safety changes.
CA
California 2025-2026 Regular Session
Assembly Budget Subcommittee No. 1 on Health Apr 7th, 2025
TX
Texas 89th Regular
Senate Committee on Water, Agriculture, and Rural Affairs Feb 10th, 2025
Water, Agriculture and Rural Affairs
Transcript Highlights:
- We have identified some high-risk and high-need projects.
- handful of those projects.
- Irrigation conservation is projected to save 1.2 million acre-feet by 2070.
- I see shovel-ready projects. Is that a fair statement? That's correct.
- That's a 50-year projection. Unfortunately, it's a 50-year projection based on...
MN
Minnesota 2025-2026 Regular Session
Committee on Health and Human Services - 03/03/26
Health and Human Services
Transcript Highlights:
- are based on those projections.
- are based on those projections.
- higher than projected carry forward in federal funding.
- confront uh the def the projected confront uh the def the projected deficit<00:52:27.440>
in< - <01:36:33.600>
in details or what you're projecting in details or what you're projecting in
NM
New Mexico 2025 Regular Session
IC - Legislative Finance Dec 10th, 2025 at 08:35 am
Transcript Highlights:
- Our next recommendation is a $1.85 billion increase in project programs, program suspensions, project
- delays, project terminations, and stop work orders.
- And now we move into the biggest of our projects.
- funding, and it's for a campus generation project. generation project.
- The current project manager for that particular project is working with the Shiprock Chapter Community
KY
Kentucky 2026 Regular Session
Tobacco Settlement Agreement Fund Oversight Committee. (2-23-26)
Transcript Highlights:
- have available um for those projects. have available um for those projects.
- >
quality <00:18:53.760>are waste projects and water quality are waste projects and water - Are you project? Have you started it?
- <00:31:40.320>
and that really looked at our projects and that really looked at our projects - of their project. of their project.
Keywords:
Meeting Start 00:00:00
Attendance Roll Call 00:00:07
Chair Comments 00:00:36
Approval of Minutes 00:04:01
Volunteers of America 00:04:21
Soil and Water Conservation/Energy and Environment Cabinet 00:14:52
Kentucky Office of Drug Control Policy/Justice & Public Safety Cabinet 00:21:05
Kentucky Department of Agriculture 00:26:01
Early Childhood Advisory Council 00:45:18, 958, all
Summary:
The Tobacco Settlement Agreement Fund Oversight Committee met to review how tobacco settlement dollars are being used and to press recipients for detailed information on total funding, administrative versus program spending, and measurable outcomes. The chair emphasized that the committee was not there for general program overviews, but to assess return on investment and whether each program should continue to receive tobacco settlement support. The committee approved the minutes from its December 22, 2025 meeting and then heard presentations from several agencies and organizations.
Volunteers of America Mid-States described its southeastern Kentucky restorative justice program, which uses an evidence-based New Zealand model for juvenile cases in nine counties. The group reported tobacco settlement funding of $516,000 in FY24 and $233,500 in FY25, representing about 17% and then about 5% of the program budget, respectively. It said the funding helped expand the program from 13 cases in 2021 to 180 youth served, and cited an independent evaluation showing recidivism of 24.5% compared with 40.4% in AOC data, along with a cost of a little under $20 per day versus detention and other placements. Some members questioned whether the program fit the tobacco settlement funding categories and suggested it might be better supported through other justice-related funding sources.
The Energy and Environment Cabinet’s Division of Conservation explained that tobacco funds support $1 million in direct aid to conservation districts and $2 million in cost-share projects for farmers, with 5% of the cost-share appropriation allowed for administration, or about $100,000 in FY26. Officials said the direct-aid line was moved into tobacco funding in 2019, reducing money available for farmer cost-share, and described a multi-year project approval and reallocation process. Senator Webb asked for a more specific breakdown of the $850,000 direct-aid amount, and the cabinet said it would provide that information.
The Kentucky Office of Drug Control Policy reported that in FY24 it expended just under $30 million across tobacco funds, general funds, restricted funds, and a one-time federal grant, with less than 2% used for administration. Officials said most tobacco settlement money goes to Kentucky ASAP local boards in all 120 counties, supporting prevention, treatment, and some law enforcement work. The Department of Agriculture then began its presentation, describing strategic investments, loan programs, county funding, administrative costs, and a reported return of about $2.30 for every dollar spent, but the transcript cuts off before that presentation was completed.
FL
Florida 2026 5th Special Session
Community Affairs Jan 20th, 2026
Transcript Highlights:
- It provides clarification relating to multi-phase projects for a pre-plat approval process, which was
- Projects approved under the public hearing process must be within or abutting an urban service area,
- unrelated to structural, electrical, or plumbing projects, except for windows and doors, and require
- We just want to make sure that if there's a large project, someone isn't breaking it up into smaller
- And it's heartbreaking to say, we didn't inspect this project.
Summary:
The committee met with a quorum present and heard a series of bills, mostly local claims and growth-management or permitting measures. SB 16, SB 14, and SB 24 were uncontested claims bills providing relief for injuries or damages involving the City of St. Petersburg and Miami-Dade County; each was described as settled or favorably reported by a special master, and each was reported favorably without debate. SB 288, a negotiated bill on rural electric cooperatives, was presented as a clarification to protect co-op authority over generation and power purchases while preserving consumer protections; it drew support from industry stakeholders and was reported favorably. SB 830 created a public-records exemption for certain local administrators and their families’ personal information, citing threats against city managers, and it also passed favorably.
The committee also considered several land-use and permitting bills. SB 1138 would create a registry of qualified professionals to conduct pre-application review for plats and development, aiming to reduce delays and backlogs; local government groups raised concerns about preemption and preserving quasi-judicial authority, but the bill passed favorably with one no vote. SB 168 expanded public nuisance law to include gambling houses, increased penalties, and authorized attorney’s fees and foreclosure of unpaid fees; it was reported favorably. SB 686 revised the agricultural enclave statute to create a public-hearing process for certain residential projects in urban service areas, with a sunset date later amended to June 30, 2026; conservation and planning groups raised concerns about local planning authority and public participation, but the bill passed favorably.
SB 548, a growth-management and impact-fee cleanup bill, clarified plan-based methodology, extraordinary circumstances, interlocal agreements, and refund procedures for impact fees. Local government and development stakeholders testified that it would improve predictability while preserving flexibility, though some sought further refinement on fee increases and refunds; the bill was amended and then reported favorably. SB 1234 addressed building permits and inspections, including permit validity, small-project exemptions, temporary hurricane protection, standardized permit forms, and expanded use of private providers; county officials objected to reduced oversight, while builders and private-provider advocates supported the measure. After testimony and debate, the bill was reported favorably. At the end of the meeting, Senator Jones requested to be recorded on several votes, and the committee adjourned after no further business.
FL
Transcript Highlights:
- There's an additional $8.4 million for other cultural and historic projects that were also submitted
- Dollars for local emergency preparedness and response projects. Mr.
- What is the projection of this year after year?
- . ...is going forward into the future for future loss projections.
- We have $50 million for dorms and $48 million for Orbis and a couple of other IT projects.
Summary:
The Senate began with prayer and the Pledge of Allegiance, then moved into floor consideration of the 2026-2027 budget. Appropriations Chair Hooper presented Senate Bill 2500, describing a $115 billion budget that reduces overall spending from the prior year, maintains reserves, and includes a 3% pay raise for state employees and 5% raises for state law enforcement, firefighters, correctional officers, and park rangers. Committee chairs then outlined major spending in their areas, including K-12 education, higher education, health and human services, criminal and civil justice, transportation/tourism/economic development, and environmental and agricultural programs. Highlights included increased funding for school scholarships and safety, workforce and university programs, Medicaid and child welfare, corrections operations, affordable housing, rural communities, Everglades and water quality projects, and infrastructure.
Members then asked detailed questions about several budget items. Senators sought clarification on the Emergency Management Trust Fund, arts and cultural grants, Florida Forever land acquisition versus conservation easements, teacher salaries, charter school capital outlay funding, EASE grants, New College funding, DOC inmate counts and reimbursement, lottery staffing, concealed weapons licensing positions, election security funding, iBudget waiver support, ADAP funding, Medicaid hospital rate reductions, and scholarship and enrollment supplements in K-12 education. Chairs explained that some reductions reflected technical shifts or right-sizing, that some funds were being moved below the line for better tracking, and that several items—such as ADAP and corrections operations—would likely remain conference issues with the House.
After questions, the Senate substituted House bills for the budget and implementing measures and adopted amendments placing the Senate language onto the House vehicles to prepare for conference. The chamber passed the budget-related bills and several conforming measures, including bills on retirement, fuel taxes, the state agency law enforcement radio system, court trust funds, judgeships, and K-12 and higher education conforming changes. Votes on the major bills were overwhelmingly unanimous or near-unanimous, and the Senate repeatedly voted to accede to the House’s request for conference on the substituted bills.
MN
Transcript Highlights:
- <00:09:29.399>
that Capital plans and which projects that Capital plans and which projects - <00:09:33.800>
for staff review all of those projects for staff review all of those projects - <00:39:50.280>
in think and there's photos of projects in think and there's photos of projects - trail and then so many other projects trail and then so many other projects that<00:40:30.640>
<00:47:43.440>expectations familiar with the project expectations familiar with the project
FL
Transcript Highlights:
- As far as the Capital Projects Fund, totaling over $363 million.
- As far as the Capital Projects Fund program, we have three programs within it.
- Fund through the three sub-projects within that.
- there for $82 million total in 28 projects.
- , specifically calling out the three projects in the rural areas of opportunity.
Summary:
The Committee on Commerce and Tourism met briefly and first announced that Senate Bill 232 by Senator Rodriguez was temporarily postponed at the sponsor’s request. The main item was a presentation from Leo Garcia of the Office of Broadband on Florida’s broadband programs, current deployment progress, and upcoming funding opportunities. Garcia said the office is administering multiple grant programs that have awarded hundreds of millions of dollars for broadband infrastructure, community facilities, and digital device access, with a focus on rural areas, workforce development, and digital literacy. He also described the state’s strategic plan and partnerships with local governments, ISPs, workforce boards, community colleges, and community action agencies.
Garcia explained that Florida has already deployed over 1,100 miles of fiber and enabled about 4,300 connections, and said the remaining unserved and underserved locations should drop significantly by the end of 2026 before the BEAD program addresses the rest. He said BEAD is a fully federal program for Florida, providing $1.16 billion from NTIA, with most of it reserved for infrastructure and additional amounts for workforce training and cybersecurity/digital literacy. He noted that Florida is prioritizing fiber but will also use fixed wireless or satellite where fiber is not cost-effective or feasible. He also said the office is seeking additional spending authority for the Digital Capacity Grant Program.
Members asked about county coverage, especially Duval County, and Garcia said Duval and Monroe had not yet received funds because they currently have limited unserved or underserved areas, but they are expected to be addressed through BEAD and related workforce and literacy efforts. Senator Davis raised permitting delays as a major challenge, and Garcia said the office is exploring ways to help local communities process permits more quickly. Senator Wright asked about competition with satellite-based broadband providers, and Garcia said the state is technology-agnostic but prioritizes fiber for reliability. There were no public comments, no votes or formal actions taken, and the meeting adjourned.
KY
Kentucky 2026 Regular Session
House Budget Review Subcommittee on Primary & Secondary Education & Workforce Development (1-20-26)
Transcript Highlights:
- Uh, that project is the Charles W. McDow Center for the Blind.
- Um, the project is a renovation.
- Um, the project is a renovation.
- Specifically, the HVAC, um, and the project um is $6.2 million.
- Uh we are project is a renovation.
Summary:
The House Budget Review Subcommittee on Primary and Secondary Education and Workforce Development met without a quorum at first, so it did not approve minutes and instead heard agency capital requests. The Education and Labor Cabinet presented a $6.2 million reauthorization for renovation of the Charles W. McDow Center for the Blind in Louisville, which serves blind and visually impaired individuals through the Office of Vocational Rehabilitation. The project would update mechanical, electrical, plumbing, and HVAC systems. Members asked about the number of students served and the facility’s location; the cabinet said it would follow up on the enrollment figure and explained that prior funding had been redirected to expanded services for people with disabilities and employment needs.
The Kentucky Department of Education then presented its request to replace the SEEK system, the state’s primary school funding formula and calculation platform. Officials said the current in-house system dates to about 2008 and is increasingly difficult to maintain, especially as legislative changes require complex recalculations. They explained that a prior vendor contract was terminated after change orders and cost overruns made the project unworkable; the original contract was about $2.8 million, and the proposed change order would have more than doubled that amount. KDE said it is seeking additional funding while also trying to recover the prior vendor’s work product so it can potentially reuse parts of the code and proceed in modules if necessary.
Members questioned the cost, the statewide role of SEEK, and whether state staff familiar with the system would be involved in any new procurement. KDE officials said they had already assigned internal staff and a project manager to the earlier RFP process and would do so again. They also noted that SEEK calculations, tax calculations, and attendance data all feed into the system, making it critical for accurate and timely district payments and data requests. The meeting ended with no votes taken, and the chair announced the next meeting would be held the following Tuesday, the 27th, at 10:00 a.m. in the same room.
TX
Transcript Highlights:
- Uh, but this, this project is a former gravel pit.
- Uh, we are working on trying to get sewer service for the project.
- Alright, sorry, just trying to get an idea of where this project was. Members, any other questions?
- At the very beginning of all of our projects, we have to do a TIA.
- We study the future year with no project as this creates a baseline for comparison.